15-1011_AF_3052_Ktor_OH_BREAKDOWN.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Install Generator & ATS, Bldg #1301 Federal contract opportunity
- Solicitation number
- FA5575-16-B-0007
About this file
Construction Cost Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5575-16-B-0007-0001_Amend.pdf | ||
| FA5575-16-B-0007.pdf | ||
| 15-1011.pdf | ||
| QUUG_15-1011_English_Specifications.pdf | ||
| QUUG_15-1011_Especificaciones_Espaol_(de_PROJECTS_tal_cual).pdf | ||
| 15-1011_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| Synopsis_16B0007.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| INSTALL GENERATOR & ATS, BLDG #1301 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 15-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Interior Distribution System Modifications | ||||||||||
| Modificaciones del Sistema de Distribución Interior | ||||||||||
| 1 | Demoler instalación existente de fuerza e iluminación | |||||||||
| Demolish existing lighting and power installation | JOB | |||||||||
| 2 | Receptacles NEMA 5-20R, boxes and accessories | |||||||||
| Enchufes NEMA 5-20R, cajas y acc. | Ea | |||||||||
| 3 | Surface Metal Raceway 50x150mm | |||||||||
| Canaleta metálica de superficie 50x150mm | Lm | |||||||||
| 4 | 3/4" EMT including couplings & accessories | |||||||||
| Conducto acero galv. 3/4", incluso manguitos y accesorios | Lm | |||||||||
| 5 | 1 1/2" RMC including couplings & accessories | |||||||||
| Conducto acero galv. 1 1/2", incluso manguitos y accesorios | Lm | |||||||||
| 6 | 1" RMC including couplings & accessories | |||||||||
| Conducto acero galv. 1", incluso manguitos y accesorios | Lm | |||||||||
| 7 | Copper cable 1x2.5 mm2 H07V-K 450/750V | |||||||||
| Cable de cobre 1x2.5 mm2 H07V-K 450/750V | Lm | |||||||||
| 8 | Copper cable 1x4 mm2 H07V-K 450/750V | |||||||||
| Cable de cobre 1x4 mm2 H07V-K 450/750V | Lm | |||||||||
| 9 | Copper cable 1x6 mm2 RZ1-K (AS) 0.6/1 kV | |||||||||
| Cable de cobre 1x6 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||||||
| 10 | Lighting fixtures (Type A) 2xTL5 35W HFP | |||||||||
| Luminaria estanca 2xTL5 35 W HFP (Tipo A) | Ea | |||||||||
| 11 | Emergency lighting fixtures (Type A) 2xTL5 35W HFP | |||||||||
| Luminaria estanca de emergencia 2xTL5 35 W HFP (Tipo A) | Ea | |||||||||
| 12 | Nuevo panel eléctrico LDP | |||||||||
| New LDP Electric Panelboard | Ea | |||||||||
| 13 | Puesta a tierra | |||||||||
| Grounding System | Ea | |||||||||
| Interior Distribution System Modifications Total | ||||||||||
| Total Interior Distribution System Modifications |
| Generator and Automatic Transfer Switch | ||
| Grupo electrógeno y Conmutador Automático | ||
| 14 | Demoler generador, accesorios y transporte a vertedero | |
| Demolish and dispose of generator and accessories | JOB | |
| 15 | Grupo electrógeno 125 kW, cableado, conductos y acc. | |
| Generator 125 kW, wiring, conduits & acc. | Ea | |
| 16 | Conmutador automático, 4 polos, 600 A, cableado y acc. | |
| 4-Pole, 600 A,Automatic Transfer Switch, wiring and acc. | Ea | |
| 17 | Seccionador de by-pass, cableado y acc. | |
| By-pass/Isolation Switch, wiring and acc. | Ea | |
| 18 | Copper cable 1x35 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x35 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 19 | Copper cable 1x95 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x95 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 20 | Weatherproof metal raceway 100x300mm, incl. coplings & acc. | |
| Canal metal estanca 100x300mm, incluso acc. y conexiones | Lm | |
| 21 | Puesta a tierra | |
| Grounding System | Ea | |
| Generator and Automatic Transfer Switch Total | ||
| Total Grupo electrógeno y Conmutador Automático |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Interior Distribution System Modifications |
| Modificaciones del Sistema de Distribución Interior |
| Generator and Automatic Transfer Switch |
| Grupo electrógeno y Conmutador Automático |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| OVERHEAD BREAKDOWN | TOTAL MATERIAL COSTS |
Project Superintendent TOTAL LABOR COSTS
QC Manager TOTAL OTHER DIRECT COSTS
Safety Manager TOTAL DIRECT COSTS
English Speaking Representative OVERHEAD (see breakdown)
Other Overhead Costs SUBTOTAL
TOTAL OVERHEAD BREAKDOWN EUROS PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY:
Page &P of &N
File details come from the government source that posted it. Updated .