Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Repair D Avenue Phase 3 Federal contract opportunity
- Solicitation number
- FA5575-16-B-0004
About this file
Attach 4 Submittal Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10-1009P3 _Especificaciones.pdf | ||
| 10-1009P3_Drawings.pdf | ||
| FA5575-16-B-0003_RPR_Ave_D_P3.pdf | ||
| Construction_Cost_Estimate_Breakdown _Contractor.xlsx | XLSX spreadsheet | |
| 10-1009P3 _Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 10-1009P3 | PROJECT TITLE |
RPR D Avenue PH3
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | |||||||||||
| APPROVED |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
| SECTION 01 11 00 | ||||||
| 1 | Construction Schedule | 3 | NTP+5 | |||
| 2 | Work Plan | 3 | NTP+5 | |||
| 3 | Laboratory | 3 | NTP+30 | |||
| SECTION 01 11 01 | ||||||
| 4 | Warranty letter | 3 | Prior to IF | |||
| 5 | Work Clearance Request | 3 | NTP+5 | |||
| 6 | Base utility connection request | 3 | NTP+15 | |||
| 7 | Base utility outage request | 3 | NTP+15 | |||
| 8 | Welding work request | 3 | Work-10 | |||
| 9 | Transit control plan | 3 | Work-15 | |||
| 10 | Access route plan | 3 | NTP+15 | |||
| 11 | Progress Schedule | 3 | NTP+10 | |||
| 12 | Mobility Plan | 3 | NTP+15 | |||
| 13 | Project sign | 3 | NTP+15 | |||
| 14 | Quality Control Plan | 3 | NTP+15 | |||
| 15 | Pre-final inspection request | 3 | ||||
| 16 | Final inspection request | 3 | ||||
| 17 | Environmental protection plan | 3 | NTP+15 | |||
| 18 | Waste & construction debris management certificate | 3 | Prior to IF | |||
| 19 | As-Built drawings | 3 | Prior to IF | |||
| 20 | Spatial Data | 3 | Prior to IF | |||
| 21 | Key Personnel | 3 | NTP+15 | |||
| 22 | Personel listing | 3 | NTP+15 | |||
| 23 | Health and safety program | 3 | NTP+15 | |||
| SECTION 32 05 10 | ||||||
| 24 | CE certification of the aggregates | 3 | NTP+30 | |||
| 25 | Job mix formula | 3 | NTP+30 | |||
| 26 | Quality and shape of the underlayed course | 3 | Work-10 | |||
| 27 | Tests of the test section | 3 | Work+10 | |||
| 28 | Tests of acceptance control | 3 | Work+10 | |||
| SECTION 32 05 30 | ||||||
| 29 | CE certification of the prime coat | 3 | NTP+30 | |||
| 30 | Ce certificatiopn of the coverage aggregate | 3 | NTP+30 | |||
| 31 | Tests of execution control | 3 | Work+10 | |||
| SECTION 32 05 31 | ||||||
| 32 | CE certification of the tack coat | 3 | NTP+30 | |||
| 33 | Tests of the execution control | 3 | Work+10 | |||
| 34 | Tests of acceptance control | 3 | Work+10 | |||
| SECTION 32 05 42 | ||||||
| 35 | CE certification of the aggregates | 3 | NTP+30 | |||
| 36 | Ce certification of the filler | 3 | NTP+30 | |||
| 37 | Ce certification of the bitumen | 3 | NTP+30 | |||
| 38 | Ce certification of the asphalt mnixes | 3 | NTP+30 | |||
| 39 | Job mix formula | 3 | NTP+30 | |||
| 40 | Density of the combined aggregates | 3 | NTP+30 | |||
| 41 | Tests of the test section | 3 | Work+10 | |||
| 42 | Tests of the production of the bituminous mixes | 3 | Work+10 | |||
| 43 | Tests of placing of bituminous mixes | 3 | Work+10 | |||
| 44 | Compaction tests | 3 | Work+10 | |||
| 45 | Tests of acceptance control | 3 | Work+10 | |||
| SECTION 32 07 00 | ||||||
| 46 | Ce cetification of the paint | 3 | NTP+30 | |||
| 47 | CE cetification of the glass microspheres | 3 | NTP+30 | |||
| 48 | Signing system during the painting | 3 | Work-10 | |||
| 49 | Tests of verification | 3 | Work+10 | |||
| SECTION 32 07 01 | ||||||
| 50 | CE certification of the sign | 3 | NTP+30 | |||
| 51 | Signing system during the installation | 3 | Work-10 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 10-1009P3 | TÍTULO DE PROYECTO: | |||
| Reparar Avenida D PH3 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | NUMBER OF COPIES REQUIRED | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |||||||||||
| CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | |||||||||||
| APROBADO |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
| SECCIÓN 01 11 00 | ||||||
| 01 | Programa de obra | 3 | NTP+5 | |||
| 02 | Plan de obra | 3 | NTP+5 | |||
| 03 | Laboratory | 3 | NTP+30 | |||
| SECCIÓN 01 11 01 | ||||||
| 04 | Carta de garantía | 3 | Antes de IF | |||
| 05 | Permiso de excavación | 3 | NTP+5 | |||
| 06 | Petición de conexión a servicios de la base | 3 | NTP+15 | |||
| 07 | Solicitud de cortes de servicios de la base | 3 | NTP+15 | |||
| 08 | Solicitud de trabajo de soldadura | 3 | Trabajo-10 | |||
| 09 | Plan de control de tránsito | 3 | Trabajo-15 | |||
| 10 | Plan de rutas de acceso | 3 | NTP+15 | |||
| 11 | Programa de avance de obras | 3 | NTP+10 | |||
| 12 | Plan de movilización | 3 | NTP+15 | |||
| 13 | Cartel de proyecto | 3 | NTP+15 | |||
| 14 | Plan de control de calidad | 3 | NTP+15 | |||
| 15 | Solicitud de inspección pre-final | 3 | ||||
| 16 | Solicitud de inspección final | 3 | ||||
| 17 | Plan de protección medioambiental | 3 | NTP+15 | |||
| 18 | Certificado de gestión de residuos y escombros | 3 | Antes de IF | |||
| 19 | Planos As-Builts | 3 | Antes de IF | |||
| 20 | Datos espaciales | 3 | Antes de IF | |||
| 21 | Personal clave | 3 | NTP+15 | |||
| 22 | Listado de personal | 3 | NTP+15 | |||
| 23 | Plan de salud y seguridad | 3 | NTP+15 | |||
| SECCIÓN 32 05 10 | ||||||
| 24 | Marcado CE de los áridos | 3 | NTP+30 | |||
| 25 | Fórmula de trabajo | 3 | NTP+30 | |||
| 26 | Calidad y forma de la superficie de asiento | 3 | Trabajo-10 | |||
| 27 | Ensayos del tramo de prueba | 3 | Trabajo+10 | |||
| 28 | Ensayos de control de recepción | 3 | Trabajo+10 | |||
| SECCIÓN 32 05 30 | ||||||
| 29 | Marcado CE del riego de imprimación | 3 | NTP+30 | |||
| 30 | Marcado CE del árido de cobertura | 3 | NTP+30 | |||
| 31 | Ensayos de control de recepción | 3 | Trabajo+10 | |||
| SECCIÓN 32 05 31 | ||||||
| 32 | Marcado CE del riego de adherencia | 3 | NTP+30 | |||
| 33 | Ensayos de control de ejecución | 3 | Trabajo+10 | |||
| 34 | Ensayos de control de recepción | 3 | Trabajo+10 | |||
| SECCIÓN 32 05 42 | ||||||
| 35 | Marcado CE de los áridos | 3 | NTP+30 | |||
| 36 | Marcado CE del polvo mineral | 3 | NTP+30 | |||
| 37 | Marcado CE del betún | 3 | NTP+30 | |||
| 38 | Marcado CE de las mezclas bituminosas | 3 | NTP+30 | |||
| 39 | Formula de Trabajo | 3 | NTP+30 | |||
| 40 | Densidad del los áridos combinados | 3 | NTP+30 | |||
| 41 | Ensayos de tramos de prueba | 3 | Trabajo+10 | |||
| 42 | Ensayos de fabricación de mezclas bituminosas | 3 | Trabajo+10 | |||
| 43 | Ensayos de extensión de mezclas bituminosas | 3 | Trabajo+10 | |||
| 44 | Ensayos de compactación | 3 | Trabajo+10 | |||
| 45 | Ensayos de control de recepción | 3 | Trabajo+10 | |||
| SECCIÓN 32 07 00 | ||||||
| 46 | Marcado CE de la pintura | 3 | NTP+30 | |||
| 47 | Marcado CE de la microesferas de vidrio | 3 | NTP+30 | |||
| 48 | Sistema de señalización durante el pintado | 3 | Trabajo-10 | |||
| 49 | Ensayos de comprobación | 3 | Trabajo+10 | |||
| SECCIÓN 32 07 01 | ||||||
| 50 | Marcado CE de la señal | 3 | NTP+30 | |||
| 51 | Sistema de señalización durante la instalación | 3 | Trabajo-10 |