FA5575-16-B-0003_RPR_Ave_D_P3.pdf
PDF 460 KB Posted
- Attached to
- Repair D Avenue Phase 3 Federal contract opportunity
- Solicitation number
- FA5575-16-B-0004
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10-1009P3 _Especificaciones.pdf | ||
| 10-1009P3 _Specifications.pdf | ||
| 10-1009P3_Drawings.pdf | ||
| Construction_Cost_Estimate_Breakdown _Contractor.xlsx | XLSX spreadsheet | |
| Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3N7A06159A001
Project QUUG 10-1009PH3, Repair D Ave Phase 3, Moron Air Base, Spain.
The magnitude of this project is betw een $250,000 and $500,000 U.S. Dollars. This is furnished for the convinience of prospective contractors. The actual extent of w ork requirements w ill be governed by the specif ications and draw ings. Bids w ill be evaluated according to the criteria in Section M, Evaluation factors for aw ard.
A pre-proposal Conference / Site Visit w ill be held 7 July 16, 10:00 hours local time, in the Contracting Conference room, bldg 106. Bids must be received by the Contracting Officer no later than 10:30 hours local time on 26 July 16. Bids submitted by facsimile w ill NOT be accepted.
IN ACCORDANCE WITH THE OFFICE OF DEFENSE COOPERATION POLICY DIRECTIVE 400-5 "(4) SPANISH MATERIAL, LABOR AND EQUIPMENT
MUST BE USED IF PERMITTED BY THE REQUIREMENTS OF THE CONTRACT SPECIFICATIONS."
Notice to Offerors: Funds are not presently available for this effort. No aw ard w ill be made under this solicitation until funds are available. The
Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of bids. In the event the
Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
X
ELIA M. PORTZ 722-8017
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Jun-2016
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________240 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Jul 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______150 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
496 ABS/LGC (FA5575)
APARTADO 221
41530 MORON
SEVILLA
FA5575
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:30 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(34) 95 848 054FAX:TEL: (34) 955 848 076 TEL: FAX:
FA5575-16-B-0004 34
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA5575-16-B-0004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Repair D Avenue PH3 Provide labor, manag
FFP
Repair D Avenue PH3 Provide labor, management, supervision, material and equipment necessary to Repair D Avenue PH3 in accordance with project Quug 10-
1009PH Rpr D Avenue PH3. Budget rate: $0.9049 Contract performance period
240 calendar days after receipt of Notice to Proceed.
FOB: Destination
PURCHASE REQUEST NUMBER: F3N7A06159A001
NET AMT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
CLAUSES INCORPORATED BY FULL TEXT
252.229-7004 STATUS OF CONTRACTOR AS A DIRECTOR CONTRACT (SPAIN) (JUN 1997)
(a) “Direct Contractor,” as used in this clause, means an individual, company, or entity with whom an agency of the
United States Department of Defense has executed a written agreement that allows duty-free import of equipment, materials, and supplies into Spain for the construction, development, maintenance, and operation of Spanish-
American installations and facilities.
(b) The Contractor is hereby designated as a Direct Contractor under the provisions of Complementary Agreement 5, articles 11, 14, 15, 17, and 18 of the Agreement on Friendship, Defense and Cooperation between the United States
Government and the Kingdom of Spain, dated July 2, 1982. The Agreement relates to contacts to be performed in whole or part in Spain, the provisions of which are hereby incorporated into and made a part of this contract by reference.
(c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment, materials, and supplies represented as necessary for contract performance by the Contracting Officer. Orders for equipment, materials, and supplies placed prior to official notification of such approval shall be at the Contractor's own risk. The Contractor must submit its documentation in sufficient time to permit processing by the appropriate United States and Spanish Government agencies prior to the arrival of the equipment, material, or supplies in Spain. Seasonal variations in processing times are common, and the Contractor should program its projects accordingly. Any delay or expense arising directly or indirectly from this process shall not excuse untimely performance (except as expressly allowed in other provisions of this contract), constitute a direct or constructive change, or otherwise provide a basis for additional compensation or adjustment of any kind.
(d) To ensure that all duty-free imports are properly accounted for, exported, or disposed of, in accordance with
Spanish law, the Contractor shall obtain a written bank letter of guaranty payable to the Treasurer of the United
States, or such other authority as may be designated by the Contracting Officer, in the amount set forth in paragraph
(g) of this clause, prior to effecting any duty-free imports for the performance of this contract.
(e) If the Contractor fails to obtain the required guaranty, the Contractor agrees that the Contracting Officer may withhold a portion of the contract payments in order to establish a fund in the amount set forth in paragraph (g) of this clause. The fund shall be used for the payment of import taxes in the event that the Contractor fails to properly account for, export, or dispose of equipment, materials, or supplies imported on a duty-free basis.
(f) The amount of the bank letter of guaranty or size of the fund required under paragraph (d) or (e) of this clause normally shall be 5 percent of the contract value. However, if the Contractor demonstrates to the Contracting
Officer's satisfaction that the amount retained by the United States Government or guaranteed by the bank is excessive, the amount shall be reduced to an amount commensurate with contingent import tax and duty-free liability. This bank guaranty or fund shall not be released to the Contractor until the Spanish General Directorate of
Customs verifies the accounting, export, or disposition of the equipment, material, or supplies imported on a duty-free basis.
(g) The amount required under paragraph (d), (e), or (f) of this clause is 10%.
(h) The Contractor agrees to insert the provisions of this clause, including this paragraph (h), in all subcontracts.
(End of clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the
Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 250 dys. ADC 1 496 ABS/CE (F3N7A0)
APARTADO 221
BASE AEREA DE MORON 41530
FOB: Destination
F3N7A0
52.211-13 Time Extensions SEP 2000
52.247-34 F.O.B. Destination NOV 1991
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days after receipt of Notice to Proceed. * The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of 616.93 Euros for the first day of delay and 486.13 Euros for each calendar day thereafter of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Construction Invoice
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
Not Applicable
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F78900
Issue By DoDAAC FA5575
Admin DoDAAC FA5575
Inspect By DoDAAC F3N7A0
Ship To Code F3N7A0
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional
Email Notifications” field of WAWF once a document is submitted in the system.
496abs.lgc.contractorsupport@us.af.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Not Applicable
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
mailto:496abs.lgc.contractorsupport@us.af.mil
Section H - Special Contract Requirements
BANK LETTER OF GUARANTEE
Within ten (10) calendar days after the date of contract award, the Contractor shall furnish the Contracting Officer a
Bank Letter of Guarantee for the performance of the work in the amount specified below. Failure to furnish the letter of guarantee will be considered nonconforming and the contract may be terminated for default in accordance with
FAR 52.249-10 in Section I.
Amount of Contract Bank Letter
Under $100,000.00 None
(or Euro equivalent)
$100,000.00 - $500,000.00 12% of award amount
(or Euro equivalent)
$500,000.00 and over 10% of award amount
(or Euro equivalent)
The Bank Letter of Guarantee will be dated as of the contract date or as soon thereafter as possible. The Bank Letter of Guarantee shall state that a guarantee has been issued against the awarded contract and that the following conditions are in force.
1. When presented by a representative of the U.S. Government against debts due, redemption cannot be contested.
2. The value of the guarantee is to be cited in Euros.
3. The Bank Letter of Guarantee shall also state that the bank agrees and consents that the contract may be modified by change order or supplemental agreement without affecting the validity of the
Bank Letter of Guarantee. The Contracting Officer will not issue the Notice to Proceed until approval and acceptance of the Bank Letter of Guarantee.
The Bank Letter of Guarantee will continue in effect throughout the performance period. During the warranty period an amount equal to 10% of the original contract price shall be applicable.
Section I - Contract Clauses
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-6 Data Universal Numbering System Number JUL 2013
52.204-7 System for Award Management JUL 2013
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
OCT 2015
52.204-13 System for Award Management Maintenance JUL 2013
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.214-29 Order Of Precedence--Sealed Bidding JAN 1986
52.222-50 Combating Trafficking in Persons MAR 2015
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.223-19 Compliance with Environmental Management Systems MAY 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-18 Availability Of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-25 Prompt Payment JUL 2013
52.232-27 Prompt Payment for Construction Contracts MAY 2014
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Specifications and Drawings for Construction FEB 1997
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-4 Changes JUN 2007
52.246-13 Inspection--Dismantling, Demolition, or Removal of
Improvements
AUG 1996
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2015
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
252.215-7008 Only One Offer OCT 2013
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7041 Correspondence in English JUN 1997
252.225-7042 Authorization to Perform APR 2003
252.228-7006 Compliance With Spanish Laws and Insurance DEC 1998
252.229-7005 Tax Exemptions (Spain) MAR 2012
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7008 Assignment of Claims (Overseas) JUN 1997
252.232-7010 Levies on Contract Payments DEC 2006
252.233-7001 Choice of Law (Overseas) JUN 1997
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 75% percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting
Officer determines that the reduction would be to the advantage of the Government.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://farsite.hill.af.mil
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Department of Defense Federal Acquisition Regulation (48 CFR
Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
252.222-7004 COMPLIANCE WITH SPANISH SOCIAL SECURITY LAWS AND REGULATIONS (JUNE
1997)
(a) The Contractor shall comply with all Spanish Government social security laws and regulations. Within 30 calendar days after the start of contract performance, the Contractor shall ensure that copies of the documents identified in paragraph (a)(1) through (a)(5) of this clause are available at all reasonable times for inspection by the
Contracting Officer or an authorized representative. The Contractor shall retain the records in accordance with the
Audit and Records clause of this contract.
(1) TC1--Certificate of Social Security Payments;
(2) TC2--List of Employees;
(3) TC2/1--Certificate of Social Security Payments for Trainees;
(4) Nominal (pay statements) signed by both the employee and the Contractor; and
(5) Informa de Situacion de Empressa (Report of the Condition of the Enterprise) from the Ministerio de Trabajo y
S.S., Tesoreria General de la Seguridad Social (annotated with the pertinent contract number(s) next to the employee's name).
(b) All TC1's, TC2's, and TC2/1's shall contain a representation that they have been paid by either the Social Security
Administration office or the Contractor's bank or savings institution. Failure by the Contractor to comply with the requirements of this clause may result in termination of the contract under the clause of the contract entitled
``Default.''
252.229-7001 TAX RELIEF (SEPT 2014)
(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:
NAME OF TAX: IVA RATE (PERCENTAGE): 21%
(b) The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.
(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The
Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
See section J.
5352.201-9101 OMBUDSMAN (JUN 2016)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Primary:
Mr. Douglas Guldan
AFICA/KU, UNIT 3103, APO, AE 09094-3103
AFICA/KU, Geb 404, Flugplatz Ramstein, 66877 Ramstein-Miesenbach, Germany
E-mail: douglas.guldan@us.af.mil
Tel: DSN: (314)480-2209 Fax: (49)-6731-47-2025
Alternate:
Ms. Heidi Hoehn
AFICA/KU, UNIT 3103, APO, AE 09094-3103
AFICA/KU, Geb 404, Flugplatz Ramstein, 66877 Ramstein-Miesenbach, Germany
E-mail: heidi.hoehn.de@us.af.mil
Tel: DSN: (314)480-9330 Fax: (49)-6731-47-2025
Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC
20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
As prescribed in 5323.804-90, insert the following clause in solicitations and contracts:
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5323.htm#p5323804
ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS)
(NOV 2012)
(a) Contractors shall not:
(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
[Note: This prohibition does not apply to manufacturing.]
(b) For the purposes of Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:
(1) Halons: 1011, 1202, 1211, 1301, and 2402;
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-
217, and the blends R-500, R-501, R-502, and R-503; and
(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Air Force definition of a Class I ODS.]
As prescribed at 5328.310-90, insert the following clause in solicitations and contracts:
INSURANCE CERTIFICATE REQUIREMENT IN SPAIN (USAFE) (OCT 2012)
(a) Below follows the Insurance Certificate required for any Third Country National (TCN) contractor, other than U.S. or Spanish, required for use under this contract. The certificate is provided to standardize base access procedures. It must be completed and signed by the policyholder and the insurer.
http://static.e-publishing.af.mil/production/1/af_a4_7/publication/afi32-7086/afi32-7086.pdf http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5328.310-90
(b) The amount of coverage minimum is 90,151.82 Euros per insured party (personal injury), 60,101.21 Euros per accident (property damage), and 6, 010.12 Euros security deposit for legal fees. In all cases the amount of coverage, if different from the above amounts, will be determined by the insurer, except in situations where the minimum coverage applies.
(c) The request for base access and the insurance certificate should be processed in accordance with DoD Foreign Clearance Guide instructions for Spain.
(d) Complete the following certification:
INSURANCE CERTIFICATION
CERTIFICATE OF INSURANCE COVERAGE OF THE CIVIL LIABILITY REFERRED TO
UNDER ARTICLE 5 OF ANNEX 6 TO THE AGREEMENT BETWEEN THE KINGDOM OF
SPAIN AND THE UNITED STATES OF AMERICA ON COOPERATION FOR THE
DEFENSE, SIGNED THE 1st OF DECEMBER 1988.
The insurance Company _______________________________________________ with legal domicile in _______________________________________________________________
Tel: __________________________ of Spanish/US nationality, registered in the Mercantile Registry of_______________________________________
Date:____________________, Number________, Book:_______, Section _____, Volume________, Page_______.
CERTIFIES
That Mr./Mrs. ____________________of_____________________ nationality, with passport number_______________, has contracted with this company Policy Number _____________ of civil liability against damages to persons or property which could arise from his/her actions or omissions in the performance of his/her official functions/professional activities in Spain because of the contract of ______________________________________________________ for the U.S.
forces, and during the visit which, in respect of such contract, he/she may make to the
_______________ Military Base, according to the general conditions in force for this type of insurance and also to the special conditions created for this purpose in the Spanish-U.S.
Permanent Committee; that he/she has paid the premium according to the agreed conditions; and that such Policy is in force.
The Policy establishes as coverage of the mentioned risks the following amounts:
INDEMNITY LIMITS:
- For casualty: 601,012.10 Euros
With the following sub-limits for each injured person:
https://www.fcg.pentagon.mil/
- For personal liability: 90,151.82 Euros
- For property damage: 60,101.21 Euros
- For Judiciary Bond: 6, 010.12 Euros
The granted coverage is effective from ________________ through________________, and does not include any type of franchise, or similar limitation, to be deducted from the mentioned guarantees or any clause which requires the submission to any type of arbitration. The underwriting insurance company considers that the established amounts adequately cover the insured risks.
The policy sets forth the following clauses:
1. “The insurance company waives any right of subrogation against the United States of America which may arise by reason of any payment under this Policy.”
2. “The parties hereto explicitly agree to submit to the jurisdiction of the Spanish Courts of Law and to the Spanish Laws to settle any matter related to the construction or enforcement of the clauses and conditions of this Policy.”
IN WITNESS HEREOF, the present document is signed in______________________________, on the____________of_____________20____
For the Insured Company (signature) For the Insurance (signature)
CERTIFICADO DE COBERTURA DE SEGURO DE LA RESPONSABILIDAD CIVIL A QUE
SE REFIERE EL ARTICULO 5 DEL ANEXO 6 AL CONVENIO ENTRE EL REINO DE
ESPAÑA Y LOS ESTADOS UNIDOS DE AMERICA SOBRE COOPERACION PARA LA
DEFENSA, FIRMADO EL DIA 1 DE DICIEMBRE DE 1988.
La Compañia de Seguros ______________________________________ con domicilio social en la Calle/Avda./Pla.
____________________________________________________________________, Tlfo.:
_________________ , de nacionalidad española/norteamericana, inscrita en el Registro
Mercantil de______________________________, fecha _________________, Número
________, Libro _________, Sección ______, Tomo _______, Folio_______.
CERTIFICA:
Que D. __________________________, de nacionalidad _________________________, provisto del pasaporte número _______________________, tiene suscrita con esta Compañia la
Póliza número ____________________________, de responsabilidad civil contra daños a personas y cosas que pudieran derivarse de acciones u omisiones realizadas en el desempeño de sus funciones oficiales/actividades profesionales en España con ocasión del contrato de
__________________________________________, para las Fuerzas de los EE.UU. y con la visita que en relación con dicho contrato realice a la Base Militar de
___________________________, según las condiciones generales vigentes para este tipo de seguros y además las condiciones especiales elaboradas a este fin en el Comité Permanente
Hispano-Norteamericano; habiéndose satisfecho la prima según las condiciones pactadas, y encontrándose dicha Póliza en vigor.
La Póliza establece como cobertura de los riesgos mencionados las siguientes cuantías:
LIMITES DE INDEMNIZACION:
- Por siniestro: -------------------------- 601.012,10 Euros
Con los siguientes sublímites por perjudicado:
- Por daños personales:----------------- 90.151,82 Euros
- Por daños materiales: ----------------- 60.101,21 Euros
- Por fianzas judiciales:-_--------------- 6.010,12 Euros
Las coberturas otorgadas son efectivas desde el ___________________________, hasta el
_________________________, no incluyéndose en las mismas ningún tipo de franquicia o limitación similar a deducir de las garantías indicadas ni ninguna disposición que requiera la sumisión a cualquier tipo de arbitraje. La Compañia aseguradora que suscribe considera que las cuantías establecidas cubren adecuadamente los riesgos asegurados.
La Póliza establece las siguientes cláusulas:
1. “La Compañia Aseguradora renuncia a cualquier derecho de subrogación contra los Estados
Unidos de América que pueda provenir por razones diferentes a pago, bajo la Póliza epígrafiada.”
2. “Las partes se someten expresamente a la jurisdicción de los tribunales españoles y al derecho español para resolver cualquier cuestión relativa a la interpretación o aplicación de las cláusulas y condiciones de la Póliza.”
Y para que conste a los efectos oportunos, se firma el presente en __________________ a
_______________ de _____________ 2.0___._______________________________________
Tomador: Asegurador:
(END OF CERTIFICATE)
(End of Clause)
As prescribed in 5342.490-1, insert a clause substantially the same as the following clause in solicitations and contracts:
CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and ITV to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) No work under this contract requires unescorted entry to controlled or restricted areas.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5342.htm#p53424901
Section J - List of Documents, Exhibits and Other Attachments
LIST OF ATTACHMENTS
NUMBER TITLE DATE NUMBER OF PAGES
1 Contract Specifications for Project QUUG 10-1009P3, RPR D Avenue Ph3Moron Air Base, Spain (English)
3 May 16 54
2 Contract Specifications for Project QUUG 10-1009P3, RPR D Avenue Ph3Moron Air Base, Spain (Spanish)
3 May 16 53
3 Drawings R-721-01 through R-720-09 3 May 16 9
4 Submittal Schedule Undated 3
5 Construction Cost Estimate Breakdown
Undated 21
Section K - Representations, Certifications and Other Statements of Offerors
1. PRIME BIDDER CERTIFICATION REQUIREMENTS
1. Bidders must submit the required current Certificate of Classification issued by the "Registro de Contratista de
Obras del Estado" of the "Ministerio de Economía y Hacienda" (as required by Spanish Law “Decreto Legislativo
3/2011 Ley de Contratos del Sector Público”) covering the following groups, subgroups, and categories (as stated in
Technical Specifications). Certificate shall remain valid for the duration of the period of performance. The certificate holder (contractor or subcontractor) must execute the activities related to the certificate.
GROUP SUBGROUP CATEGORY
G 1, 4, 6 F
O 2 D
NOTE: The minimum required work activities to be performed by the Bidder area related to the following line items of the Construction Cost Estimate Breakdown:
a. Pavement milling.
b. The placing and setting up of bituminous mixes.
c. The prime coat application.
d. The tack coat application.
2. Bidders' must submit the following certificate demonstrating the quality control management system established by the Bidder meets the requirements established by the standard. The submitted certificates shall be original or a notarized copy. Bidders must hold an updated Certificate of Quality Management System UNE-EN ISO 9001 issued by an official certification body for the following activities:
a. The placing and setting up of bituminous mixes.
b. The milling and recycling of pavements.
c. The upkeep and maintenance of roads, runways, highways and freeways.
d. The construction of work types of:
1) Roads and runways (with pavements of bituminous mixes, markings and signage of roads, works without specific qualification).
3. Bidders' must submit the following certificate demonstrating the environment management system established by the
Bidder meets the requirements established by the standard. The submitted certificates shall be original or a notarized copy. Bidders must hold an updated Certificate of Environment Management System UNE-EN ISO 14001 issued by an official certification body for the following activities:
a. The placing and setting up of bituminous mixes.
b. The milling and recycling of pavements.
c. The upkeep and maintenance of roads, runways, highways and freeways.
d. The construction of work types of:
1) Roads and runways (with pavements of bituminous mixes, markings and signage of roads, works without specific qualification).
4. Bidders must submit certification of Asphalt paver to be used, to prove compliance with technical specifications requirements and be considered responsible. Certification must indicate the following:
a. Name of the owner of the asphalt paver.
b. Manufacturer of the asphalt paver.
c. Model of the asphalt paver.
d. Maximum thickness of placed asphalt course.
e. Maximum width of placed asphalt course.
5. Bidders must submit certification of milling equipment to be used, to prove compliance with technical specifications requirements and be considered responsible. Certification must indicate the following:
a. Name of the owner of the milling equipment.
b. Manufacturer of the milling equipment.
c. Model of the milling equipment.
d. Manufacturer's brochure of the model of the milling equipment.
2. PRIME BIDDER OR SUBCONTRACTOR’S CERTIFICATION REQUIREMENTS
1. Bidders or their subcontractors must submit the required current Certificate of Classification issued by the
"Registro de Contratista de Obras del Estado" of the "Ministerio de Economía y Hacienda" (as required by Spanish
Law “Decreto Legislativo 3/2011 Ley de Contratos del Sector Público”) covering the following groups, subgroups, and categories (as stated in Technical Specifications). Certificate shall remain valid for the duration of the period of performance. The certificate holder (contractor or subcontractor) must execute the activities related to the certificate.
GROUP SUBGROUP CATEGORY
G 5 F
O 2 D
NOTE: Bidders must submit a memorandum of agreement between the Bidder and each key subcontractor, if any, establishing that the key subcontractor will perform the corresponding work activity if the contract is awarded to the
Bidder. The memorandum of agreement has to be signed by the Bidder and the key subcontractor and shall be original or a notarized copy.
2. Bidders or their subcontractors must submit certification of Asphalt Batch Plant to be used, to prove compliance with technical specifications requirements and be considered responsible. Certification must indicate the following:
a. Name of the owner of the asphalt batch plant.
b. Manufacturer of the asphalt batch plant.
c. Model of the asphalt batch plant.
d. Asphalt batch plant capacity (at least 350 tons per hour).
e. Location of the asphalt batch plant. The location of the asphalt batch plant shall be at no more than 60 minutes haul time from the placing site.
f. AENOR, AIDICO, APPLUS, Bureau Veritas or ENAC certificate of the bituminous mix production control from the asphalt batch plant in accordance with UNE-EN 13108 for the following mixes:
1) AC 16 surf 35/50 D.
2) AC 22 bin 35/50 S.
g. Compliance Evaluation System certificate type (2+).
h. Certificate of Quality Management System UNE-EN ISO 9001 issued by an official certification body for the production of bituminous mixes.
i. Certificate of Environment Management System UNE-EN ISO 14001 issued by an official certification body for the production of bituminous mixes.
3. Bidders or their subcontractors must submit certification of the quarry to be used, to prove compliance with technical specifications requirements and be considered responsible. Certification must indicate the following:
a. Name of the owner of the quarry.
b. AENOR certificate of the aggregates.
c. Certificate of Quality Management System UNE-EN ISO 9001 issued by an official certification body for the mining, crushing, classification and sale of aggregates.
d. Certificate of Environment Management System UNE-EN ISO 14001 issued by an official certification body for the mining, crushing, classification and sale of aggregates.
52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is N/A.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .