Construction_Cost_Estimate_Breakdown _Contractor.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Repair D Avenue Phase 3 Federal contract opportunity
Solicitation number
FA5575-16-B-0004
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attach 5 Construction Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Repair D Avenue Phase 3, newest first.
File Type Posted
10-1009P3 _Especificaciones.pdf PDF
Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
10-1009P3 _Specifications.pdf PDF
10-1009P3_Drawings.pdf PDF
FA5575-16-B-0003_RPR_Ave_D_P3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR - Cost Estimate

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
RPR D AVENUE PHASE 3 / REPARAR FASE 3 DE AVENIDA D
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 10-1009P3MORÓN AIR BASE, SPAIN
LINE
NO.ITEMQUANTITYMATERIAL COSTLABOR COSTTOTAL LINE COST
UNIT OF
MEASUREUNIT
NUMBERUNIT COSTTOTAL
COSTUNIT COSTTOTAL

COST

(1)(2)(3)(4)(5)(6)(7)(8)
CONSTRUCTION PHASE 1

FASE DE CONSTRUCCIÓN 1

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
14Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
TOTAL CONSTRUCTION PHASE 1

TOTAL FASE DE CONSTRUCCIÓN 1

CONSTRUCTION PHASE 2

FASE DE CONSTRUCCIÓN 2

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
4Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
5Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
6Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
7Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
8Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
9Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
10Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
11Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
12Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
13Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
14Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 2

TOTAL FASE DE CONSTRUCCIÓN 2

CONSTRUCTION PHASE 3

FASE DE CONSTRUCCIÓN 3

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
15Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
16Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 3

TOTAL FASE DE CONSTRUCCIÓN 3

CONSTRUCTION PHASE 4

FASE DE CONSTRUCCIÓN 4

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
15Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
16Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 4

TOTAL FASE DE CONSTRUCCIÓN 4

CONSTRUCTION PHASE 5

FASE DE CONSTRUCCIÓN 5

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
4Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
5Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
6Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
7Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
8Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
9Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
10Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
11Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 5

TOTAL FASE DE CONSTRUCCIÓN 5

CONSTRUCTION PHASE 6

FASE DE CONSTRUCCIÓN 6

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
14Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
15Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 6

TOTAL FASE DE CONSTRUCCIÓN 6

CONSTRUCTION PHASE 7

FASE DE CONSTRUCCIÓN 7

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
15Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
16Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 7

TOTAL FASE DE CONSTRUCCIÓN 7

CONSTRUCTION PHASE 8

FASE DE CONSTRUCCIÓN 8

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
15Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
16Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 8

TOTAL FASE DE CONSTRUCCIÓN 8

CONSTRUCTION PHASE 9

FASE DE CONSTRUCCIÓN 9

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
15Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
16Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 9

TOTAL FASE DE CONSTRUCCIÓN 9

CONSTRUCTION PHASE 10

FASE DE CONSTRUCCIÓN 10

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
5Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
7Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
8Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
9Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
10Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
11Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
12Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
15Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
16Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 10

TOTAL FASE DE CONSTRUCCIÓN 10

CONSTRUCTION PHASE 11

FASE DE CONSTRUCCIÓN 11

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
4Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
5Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
6Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
7Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
8Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
9Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
10Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
11Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
12Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
13Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
14Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 11

TOTAL FASE DE CONSTRUCCIÓN 11

CONSTRUCTION PHASE 12

FASE DE CONSTRUCCIÓN 12

1Concrete pavement demolition, 22.86 x 3.05 m2 approximately, including clearing-up, loading and transportation of demolished material to authorized dump.
Demolición de pavimento de hormigón, 22.86 x 3.05 m2 aproximadamente, incluso desescombro, carga y transporte a vertedero autorizado.m2
2Base course excavation, maximum thickness 35 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base, 35 cm espesor máximo, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
3Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
4Pavement milling, thickness 13 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 13 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
5Traffic marking micromilling, including load, sweeping, removal and transport to authorized waste manager.
Microfresado de marcas viales, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
6Traffic sign removal, including foundation.
Retirada de señales de tráfico, incluso cimentación.u
7Base course excavation at shoulders, thickness 8 cm, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base en arcén, 8 cm espesor, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
8Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
9Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
10Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
11Placing and compaction of 8 cm thick hot mix asphalt AC22 BIN 35/50 S type.
Extendido y compactación de 8 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 S.t
12Application of tack coat C60B3 ADH type.
Aplicación de riego de adherencia tipo C60B3 ADH.t
13Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
14Installation of circular, triangular or square traffic sign, 90 cm diameter, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular, triangular o cuadrada de tráfico de 90 cm de diámetro, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
15Installation of octagonal traffic sign, 45 cm apothem, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical octogonal de tráfico de 45 cm de apotema, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
16Painting of road edge marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de borde de vial, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
17Painting of road symbol and island marking, white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de símbolo y cebreado de vial, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem2
18Painting of road centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje de vial, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
TOTAL CONSTRUCTION PHASE 12

TOTAL FASE DE CONSTRUCCIÓN 12

SUMMARY

RESUMEN

TOTAL CONSTRUCTION PHASE 1

TOTAL FASE DE CONSTRUCCIÓN 1

TOTAL CONSTRUCTION PHASE 2

TOTAL FASE DE CONSTRUCCIÓN 2

TOTAL CONSTRUCTION PHASE 3

TOTAL FASE DE CONSTRUCCIÓN 3

TOTAL CONSTRUCTION PHASE 4

TOTAL FASE DE CONSTRUCCIÓN 4

TOTAL CONSTRUCTION PHASE 5

TOTAL FASE DE CONSTRUCCIÓN 5

TOTAL CONSTRUCTION PHASE 6

TOTAL FASE DE CONSTRUCCIÓN 6

TOTAL CONSTRUCTION PHASE 7

TOTAL FASE DE CONSTRUCCIÓN 7

TOTAL CONSTRUCTION PHASE 8

TOTAL FASE DE CONSTRUCCIÓN 8

TOTAL CONSTRUCTION PHASE 9

TOTAL FASE DE CONSTRUCCIÓN 9

TOTAL CONSTRUCTION PHASE 10

TOTAL FASE DE CONSTRUCCIÓN 10

TOTAL CONSTRUCTION PHASE 11

TOTAL FASE DE CONSTRUCCIÓN 11

TOTAL CONSTRUCTION PHASE 12

TOTAL FASE DE CONSTRUCCIÓN 12

TOTAL

TOTAL

OVERHEAD BREAKDOWNTOTAL MATERIAL COST
PROJECT SUPERINTENDENTTOTAL LABOR COST
QUALITY CONTROL MANAGERTOTAL MATERIAL EXECUTION COST
SAFETY MANAGEROVERHEAD
ENGLISH SPEAKING REPRESENTATIVEPROFIT
OTHER OVERHEAD COSTSTOTAL COST ESTIMATE
TOTAL OVERHEAD BREAKDOWN

DATE: FIRM NAME:

TITLE:BY:
(Signature)
These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Bold"FOR OFFICIAL USE ONLY &"Times New Roman,Regular"Page &P of &N

Instructions for Completing

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN

Column 1 - Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. Items will be furnished by the Government.

Column 2 - Units of Measure. Description of the unit in which each item is to be estimated (examples: square meters - m2, cubic meters - m3, linear meters - m, unit - u, kilograms - kg, ton - t). Units of measure will be furnished by the Government.

Column 3 - Quantity. Quantity required for the item in terms of unit of measure shown on Column 2. Quantity will be furnished by the Government only for unit price contract. Otherwise, the contractor is responsible for determining the quantity.

Column 4 and 5 - Material Costs. Enter the unit cost of the material corresponding to the item to be supplied in Column 4 and the total material cost for that item in Column 5. Cost must be in euros.

Column 6 and 7 - Labor Costs. Enter the unit cost of the labor corresponding to the item to be performed in Column 6 and the total labor cost for that item in Column 7. Costs must be in euros.

Column 8 - Total Line Cost. Enter the sum of the total material cost and the total labor cost of the item to be performed. Cost must be in euros.

NOTE: In addition to other totals derived on various pages, the grand total of columns 5, 7 and 8, plus overhead and profit will be shown on the last page. The overhead and profit percentages must be applied over the total material execution. The overhead has to be in accordance with the overhead breakdown to be completed, which includes the key personnel cost.

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data.

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer, or his authorized representative, upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .