Synopsis_FA5575-16-B-0003.docx

DOCX document 19 KB Posted

Attached to
Repair Base Operations Facility, Bldg 1411 Federal contract opportunity
Solicitation number
FA5575-16-B-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Operations Facility, Bldg 1411, newest first.
File Type Posted
Q A_Notice_to_Offerors.docx DOCX document
FA5575-16-B-0003_RPR_Base_Ops_Fac_1411.pdf PDF
QUUG_10-1016_Specifications_English.pdf PDF
QUUG_10-1016_Especificaciones_Espaol.pdf PDF
10-1016_AF66-English.xlsx XLSX spreadsheet
10-1016_Drawings.pdf PDF
10-1016_Construction_Cost_Estimate_Breakdown_KTOR.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The United States Air Force intends to issue solicitation FA5575-16-B-0003 to solicit proposals for a Firm-Fixed Price contract to Repair Base Operations Facility, Bldg 1411 at Morón AB, Spain. The magnitude of construction for this project is estimated to be between $1,000,000 and $5,000,000 U.S. Dollars. The period of performance for this project is estimated at 550 calendar days.

A solicitation package will be available on the Federal Business Opportunities website at www.fbo.gov on or after 15 June 2016.

In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements".

NOTE: THIS SOLICITATION IS INTENDED ONLY FOR LOCAL SOURCES IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION 5.202(a)(12). LOCAL SOURCES ARE THOSE SOURCES NORMALLY RESIDENT, LICENSED AND REGISTERED TO CONDUCT CONSTRUCTION BUSINESS IN SPAIN. OFFERS FROM NON-LOCAL SOURCES WILL NOT BE CONSIDERED UNDER THIS SOLICITATION.

The work includes, but is not limited to:

1. Architectural Work:

1.1Demolition and Disassembly Work
a.Remove chain link fence of exterior equipment.
b.Disassembly doors, frames, bulk frames and trims for subsequent reinstallation or relocation.
c.Remove kitchenette furniture.
d.Remove cabinets, shelves and countertop from toilets.
e.Remove shower screens
f.Disassemble bath shelves and soap dispensers for subsequent reinstallation.
g.Remove wall tiles and mortar layers.
h.Remove gres floor tiles
i.Remove sanitary fixtures and bath accessories.
j.Demolish partitions and cut new door opening in walls.
k.Remove cables, boxes and any inoperative element affixed to the exterior walls as indicated.
l.Remove paint coats from exterior wall surfaces.
m.Remove mortar layer from exterior walls.
n.Remove equipment blocks and inoperative elements from the roof as indicated.
o.Disassemble metal louver panels to be readjusted.
p.Remove ficus type bushes in front of mechanical room metal screen.
q.Back fill the area affected by the demolition and restore the topsoil of the resultant areas and the gravel cover.
r.Selection, treatment, load and transportation of demolition material to authorized dump or recycling plant.
1.2.Masonry Works:
a.Construct new partition brick walls.
b.Close door opening with brick wall.
1.3.Steel Works:
a.Install metal louver paneling adapted and converted into swinging doors.
b.Provide and install metal secondary structure to support the false ceiling.
c.Provide and install chain link fence and gate.
1.4Carpentry Works and phenolic paneling:
a.Provide and install wood cabinet, quarry countertop and baseboard and accessories in the food preparation areas.
b.Provide and install phenolic countertops for sinks.
c.Provide and install phenolic urinal separators.
1.5Thermal and Moisture Protection:
a.Clean roof surface, tile joints and construction joints
b.Restore loose roof clay tiles from roof.
c.Provide grouting material and shape tile joints.
d.Provide material and seal the roof construction joints.
e.Provide material and apply waterproof treatment coats and mesh.
f.Clean and fix gutters, seal gutter joints and flashings from roof.
g.Clean downspout and restore anchorage and accessories.
1.6Doors and Signage:
a.Clean doors repair/restore hardware, frames and trims and reinstall to its original position.
b.Clean doors, restore hardware, frames and trims and reinstall to new positions as indicated.
c.Provide and install signage on affected doors.
1.7Finishes:
a.Provide material and repair wall cracks.
b.Provide material and apply repair mortar layers to exterior wall and overhung surfaces.
c.Provide material and apply cement mortar with guide lines to new interior partitions and wall tile base.
d.Provide material and install wall tiles to screeded mortar layer with exposed stainless steel protective edges.
e.Provide material and install porcelanic gres floor tiles on self-leveling mortar layer.
f.Provide terrazzo tile and baseboard equal to existing and repair the areas affected by the partitions removal, new door opening performance and those tiles damaged by the works.
g.Provide material and install suspended ceiling of acoustical removable tiles.
h.Provide material and install suspended ceiling of water resistant removable tiles.
i.Provide material and apply plastic paint to interior wall.
j.Provide material and apply polyurethane enamel paint to exterior metal surfaces.
k.Provide material and apply moisture resistant paint to expose interior ceiling.
l.Provide material and mark room numbering above doors.
m.Provide material and apply epoxy mortar and paint coats to the mechanical room floor surface.
n.Provide material and apply prime, bonding interphase and paint coating to exterior wall and overhang surfaces, paint wall markings and reinstall the elements previously disassembled.
o.Provide grouting material, restore empty joints, buffing and polishing the terrazzo floor surface.
2Mechanical Works:
2.1Demolition Mechanical Work:
a.Demolish interior sewer installations and plumbing fixtures.
b.Demolish interior plumbing installations.
c.Demolish air conditioning system elements.
2.2Construction Mechanical Work:
a.Perform modifications to the sewer and vent systems.
b.Supply and install interior plumbing system.
c.Supply and install plumbing fixtures and toilet accessories.
d.Inspection, cleaning and disinfection of HVAC air distribution system.
e.Perform modifications to the chilled/hot water production/distribution system.
f.Perform modifications to the HVAC air distribution system.
g.Perform modifications to the building exhaust system.
h.Perform modifications to the wet pipe fire extinguishing sprinkler system.
i.Start up, tests, balancing and adjustments of all the systems (existing and installed).
3Electrical Works:
3.1Electrical Demolition Work:
a.Partial demolition of interior electrical distribution system.
b.Demolition of complete interior lighting system.
c.Partial demolition of fire alarm system.
d.Partial demolition of communications system.
3.2Construction Electrical Work:
a.Perform modifications to the interior electrical distribution system.
b.Supply and install new interior lighting and lighting control systems.
c.Perform modifications to the fire alarm system.
d.Perform modifications to the communications system.
4Final cleaning.
5Delivery of As-Built drawings.
6Delivery of Spatial data.

The certification requirements are as follows:

CERTIFICATION OF CLASSIFICATION: Bidders and/or their subcontractors must hold an updated Certificate of Classification issued by the "Registro Oficial de Licitadores y Empresas Clasificadas del Estado", covering the following groups, subgroups, and categories. The certificate holder must execute the activities related to the certificate.

GROUP SUBGROUP CATEGORY

C 1, 2, 3, 4, 6, 7, 8, and 9 B J 2 and 4 B K 9 B I 1, 6 and 7 B

It is highly recommended that you register to be notified of any new postings for this solicitation and/or any other postings published by our office. However, failure of the service to notify you of changes cannot be used against the Government in any way, shape or form. Therefore, you should check FedBizOps, https://www.fbo.gov , frequently for any new postings that may have been made.

The Government anticipates and reserves the right, to issue all solicitation documents including specifications and drawings in the English language only.

In order to be awarded a contract by the U.S. Government, the company must be registered in the System for Award Management (SAM); contracts cannot be awarded to unregistered contractors. Registration can be made online at www.sam.gov/portal/public/SAM/ NOTE: You must have a DUNS number and a NATO Commercial and Government Entity (NCAGE) Code to register. To obtain a Data Universal Numbering System (DUNS) Number you can contact Dun and Bradstreet and request one by calling: 902-446-688. To obtain a NATO CAGE code you must fill out the form found in: http://www.dlis.dla.mil/Forms/Form AC135.asp.

Failure to be registered in SAM at the time of award may delay the award and depending on the criticality of the project, may be cause to award to the next qualified best value offeror who is SAM registered. However, do not delay submitting your proposal pending receipt of a DUNS number or CAGE Code.

***NOTICE: FUNDING FOR THIS REQUIREMENT IS CURRENTLY NOT AVAILABLE FOR THIS PROJECT. NO AWARD WILL BE MADE UNDER THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE BID ACCEPTANCE PERIOD SHOULD BE VALID THROUGH 31 JAN 17. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION.

File details come from the government source that posted it. Updated .