10-1016_AF66-English.xlsx
XLSX spreadsheet 84 KB Posted
- Attached to
- Repair Base Operations Facility, Bldg 1411 Federal contract opportunity
- Solicitation number
- FA5575-16-B-0003
About this file
Submittal Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_Notice_to_Offerors.docx | DOCX document | |
| QUUG_10-1016_Especificaciones_Espaol.pdf | ||
| 10-1016_Drawings.pdf | ||
| 10-1016_Construction_Cost_Estimate_Breakdown_KTOR.xlsx | XLSX spreadsheet | |
| FA5575-16-B-0003_RPR_Base_Ops_Fac_1411.pdf | ||
| QUUG_10-1016_Specifications_English.pdf | ||
| Synopsis_FA5575-16-B-0003.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 10-1016 | PROJECT TITLE |
RENOVATE BASE OPS FACILITY, 1411
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||||||||
| 1 | Construction Schedule | 1 | NTP+5 | ||||||||||
| 2 | Work Plan | 1 | NTP+5 | ||||||||||
| 3 | Construction Phasing Plan | 1 | NTP + 15 | ||||||||||
| 4 | Shut-off Schedule Plan | 1 | Each Phase Start - 15 | ||||||||||
| SECTION 01 11 01 | |||||||||||||
| 5 | Progress Schedule | 1 | NTP+5 | ||||||||||
| 6 | Mobility Plan | 1 | NTP+5 | ||||||||||
| 7 | Quality Control Plan | 1 | NTP+10 | ||||||||||
| 8 | Waste & construction debris management | 1 | Prior to FI | ||||||||||
| 9 | As-Built drawings | 1 | Prior to FI | ||||||||||
| 10 | Project Sign | 1 | NTP+15 | ||||||||||
| 11 | Spatial Data | 1 | Prior to FI | ||||||||||
| 12 | Key Personnel | 1 | NTP+15 | ||||||||||
| 13 | Safety Program | 1 | Before any work execution | ||||||||||
| 14 | Warranty letter | 1 | Prior to FI | ||||||||||
| 15 | O&M Manuals | 1 | Prior to FI | ||||||||||
| SECTION 02 41 10 | |||||||||||||
| 16 | Program and schedule of the works | 1 | |||||||||||
| 17 | Demolition plan | 1 | |||||||||||
| 18 | Management and disposal plan of the waste | 1 | |||||||||||
| 19 | Manager of waste from demolition and construction | 1 | |||||||||||
| 20 | Authorized dump or treatment and recovery plant | 1 | |||||||||||
| 21 | Delivery and disposal certicate of waste | 1 | |||||||||||
| SECTION 04 20 00 | |||||||||||||
| 22 | Hollow brick, brick, clayblock | 1 | 1 | ||||||||||
| SECTION 05 12 00 | |||||||||||||
| 23 | Erection Plan | 1 | |||||||||||
| 24 | Welding procedures and qualifications | 1 | |||||||||||
| SECTION 06 20 00 | |||||||||||||
| 25 | Prefabricated millwork | 1 | |||||||||||
| 26 | Kitchen | 1 | 1 | 1 | |||||||||
| 27 | Kitchen cabinet frame profiles and panel finishes | 1 | |||||||||||
| 28 | Phenolic panels | 1 | 1 | 1 | 1 | ||||||||
| SECTION 07 32 14 | |||||||||||||
| 29 | Vapor barrier | 1 | |||||||||||
| 30 | Lightweight concrete | 1 | 1 | ||||||||||
| 31 | Waterproof membrane | 1 | 1 | 1 | 1 | 1 | |||||||
| 32 | Tile | 1 | 1 | 1 | 1 | ||||||||
| 33 | Mastic | 1 | 1 | 1 | |||||||||
| 34 | Waterproof treatment components | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
| SECTION 07 92 00 | |||||||||||||
| 35 | Sealants, primers and bond breakers | 1 | |||||||||||
| SECTION 08 14 00 | |||||||||||||
| 36 | Wood doors | 1 | 1 | ||||||||||
| SECTION 08 71 00 | |||||||||||||
| 37 | Hardware items | 1 | |||||||||||
| 38 | Installation | 1 | 1 | ||||||||||
| SECTION 09 29 00 | |||||||||||||
| 39 | Water resistant and fire resistant gypsum boards | 1 | 1 | ||||||||||
| 40 | Sealant and accessories | 1 | |||||||||||
| 41 | Suspension system | 1 | |||||||||||
| 42 | Asbestos Free Materials | 1 | |||||||||||
| SECTION 09 30 00 | |||||||||||||
| 43 | Floor tiles, wall tiles, joint profiles, adhesives, joint grounting | 1 | |||||||||||
| 44 | Porcelanic gress floor tile and terrazzo tile | 1 | |||||||||||
| 45 | Polished terrazzo baseboard and gres s[pecial tiles | 1 | |||||||||||
| 46 | Ceramic wall tile | 1 | |||||||||||
| 47 | Adhesive, grouting material and leveling mortar | 1 | 1 | ||||||||||
| SECTION 09 51 00 | |||||||||||||
| 48 | Acoustical tile ceiling units | 1 | |||||||||||
| 49 | Suspension system | 1 | |||||||||||
| 50 | Secondary metal structure | 1 | |||||||||||
| SECTION 09 90 00 | |||||||||||||
| 51 | Coating and/or product furnished | 1 | |||||||||||
| SECTION 10 28 13 | |||||||||||||
| 52 | Recessed wash basin and accessories | 1 | |||||||||||
| 53 | WC bowl and accessories | 1 | |||||||||||
| 54 | Urinal and accessories | 1 | |||||||||||
| 55 | Shower and accessories | 1 | |||||||||||
| 56 | Kitchen sink and accessories | 1 | |||||||||||
| 57 | Robe hook | 1 | |||||||||||
| 58 | Mirrors | 1 | |||||||||||
| 59 | Toilet paper dispenser | 1 | |||||||||||
| 60 | Paper towel dispenser | 1 | |||||||||||
| 61 | Shower soap holder | 1 | |||||||||||
| 62 | Lavatory Shelf | 1 | |||||||||||
| 63 | Water saving devices | 1 | |||||||||||
| SECTION 21 13 13 | |||||||||||||
| 64 | Automatic sprinklers | 1 | 1 | ||||||||||
| 65 | Piping and accessories | 1 | 1 | ||||||||||
| 66 | Pipe hangers and supports | 1 | |||||||||||
| 67 | Qualification of installer | 1 | |||||||||||
| 68 | Design Engineer | 1 | |||||||||||
| 69 | Inspection | 1 | |||||||||||
| 70 | Sprinkler system hydraulic calculations | 1 | |||||||||||
| 71 | Drawings of current Sprinkler heads and piping system layout | 1 | |||||||||||
| 72 | Drawings of proposed Sprinkler heads and piping system layout | 1 | |||||||||||
| 73 | As-Built drawings | 1 | |||||||||||
| SECTION 22 00 00 | |||||||||||||
| 74 | Rigid PVC piping | 1 | 1 | ||||||||||
| 75 | Copper piping | 1 | 1 | ||||||||||
| 76 | Ball valve | 1 | |||||||||||
| 77 | Check valve | 1 | |||||||||||
| 78 | Automatic air vent | 1 | |||||||||||
| 79 | Hose bibb and hose connection vacuum breaker | 1 | |||||||||||
| 80 | Floor deep seal trap with floor drain | 1 | |||||||||||
| 81 | Floor drain | 1 | |||||||||||
| 82 | Domestic Hot Water recirculation pumps | 1 | |||||||||||
| SECTION 23 00 00 | |||||||||||||
| 83 | O&M Manuals | 1 | |||||||||||
| SECTION 23 07 00 | |||||||||||||
| 84 | Domestic cold water piping insulation | 1 | |||||||||||
| 85 | Domestic hot water piping insulation | 1 | |||||||||||
| 86 | Chilled water puping insulation | 1 | |||||||||||
| 87 | Duct insulation | 1 | |||||||||||
| SECTION 23 30 13 | |||||||||||||
| 88 | Sheet metal rectangulat ducts | 1 | |||||||||||
| 89 | Circular flexible ductwork | 1 | |||||||||||
| 90 | Return grilles | 1 | |||||||||||
| 91 | Air distribution system cleaning/ disinfection company | 1 | |||||||||||
| 92 | Quality certification from ITEL | 1 | |||||||||||
| 93 | Cleaning report | 1 | |||||||||||
| 94 | Video recording and photos | 1 | |||||||||||
| 95 | Testing and balancing of air conditioning systems | 1 | |||||||||||
| SECTION 23 35 19 | |||||||||||||
| 96 | Heat pump chillers | 1 | |||||||||||
| 97 | Air handling units | 1 | |||||||||||
| 98 | Copper pipes | 1 | |||||||||||
| 99 | Steel pipe | 1 | |||||||||||
| 100 | Expansion joint seals | 1 | |||||||||||
| 101 | Pressure gauge | 1 | |||||||||||
| 102 | Thermometer | 1 | |||||||||||
| 103 | Flow switch | 1 | |||||||||||
| 104 | Ball valve | 1 | |||||||||||
| 105 | Check valve | 1 | |||||||||||
| 106 | K-flow valve | 1 | |||||||||||
| 107 | Pumps | 1 | |||||||||||
| 108 | Exhaust fans | 1 | |||||||||||
| 109 | Chemical water treatment | 1 | |||||||||||
| 110 | Supports and supply/return ducts for air handling units | 1 | |||||||||||
| SECTION 26 20 00 | |||||||||||||
| 111 | RMC Conduit and fittings (1 of each size) | 1 | |||||||||||
| 112 | EMT Conduit and fittings (1 of each size) | 1 | |||||||||||
| 113 | FMC Conduit and fittings (1 of each size) | 1 | |||||||||||
| 114 | Surface Metal Raceway and fittings (all sizes) | 1 | |||||||||||
| 115 | Flexible Non-Metallic Conduit and fittings (1 of each size) | 1 | |||||||||||
| 116 | Emergency HVAC shutoff pushbuttons | 1 | |||||||||||
| 117 | Junction and pull boxes | 1 | |||||||||||
| 118 | Outlet boxes and covers | 1 | |||||||||||
| 119 | Wires and cables | 1 | |||||||||||
| 120 | Splices and Termination Components | 1 | |||||||||||
| 121 | Circuit breakers and auxiliary trip coils | 1 | |||||||||||
| 122 | Device Plates | 1 | |||||||||||
| 123 | Receptacles (one of each type) | 1 | |||||||||||
| 124 | Toggle Switches (one of each type) | 1 | |||||||||||
| 125 | Labels | 1 | |||||||||||
| 126 | Existing Drawings | 1 | |||||||||||
| 127 | As-built Drawings | 1 | |||||||||||
| 128 | Devices Subject to Manual Operation | 1 | Prior to FI | ||||||||||
| 129 | 1000 V Wiring test | 1 | Prior to FI | ||||||||||
| 130 | Ground-Fault Interrupter Receptacle Test | 1 | Prior to FI | ||||||||||
| 131 | Single line diagram of the “as-built” building electrical system | 1 | FI-15 | ||||||||||
| 132 | Active electrical equipment | 1 | FI-15 | ||||||||||
| SECTION 26 51 00 | |||||||||||||
| 133 | LED Luminaire Type A, Driver and accessories | 1 | |||||||||||
| 134 | LED Luminaire Type B, Driver and accessories | 1 | |||||||||||
| 135 | LED Luminaire Type C, Driver and accessories | 1 | |||||||||||
| 136 | LED Luminaire Type D, Driver and accessories | 1 | |||||||||||
| 137 | LED Luminaire Type E, Driver and accessories | 1 | |||||||||||
| 138 | LED Luminaire Type F, Driver and accessories | 1 | |||||||||||
| 137 | Light/Occupancy Sensor and Controller | 1 | |||||||||||
| 138 | Dimmer Switch | 1 | |||||||||||
| 139 | Local/Regional Materials | 1 | |||||||||||
| 140 | LED Luminaires | 1 | |||||||||||
| 141 | Lighting Control System | 1 | |||||||||||
| 142 | Operating Test | 1 | |||||||||||
| 143 | Electronic Ballast Warranty | 1 | |||||||||||
| 144 | LED Luminaire Useful Life Certificate | 1 | |||||||||||
| 145 | Lighting Calculation Results | 1 | |||||||||||
| 146 | Spare Parts Delivery | 1 | |||||||||||
| 147 | Instruction to Government Personnel | 1 | |||||||||||
| 148 | O&M Manuals | 1 | |||||||||||
| SECTION 27 10 00 | |||||||||||||
| 149 | Telecommunication cabling | 1 | |||||||||||
| 150 | Conduits | 1 | |||||||||||
| 151 | Faceplates/outlets | 1 | |||||||||||
| 152 | Labels | 1 | |||||||||||
| 153 | Cable testing | 1 | |||||||||||
| SECTION 28 31 74.00 20 | |||||||||||||
| 154 | Existing Drawings | 1 | Before any modification is performed | ||||||||||
| 155 | Point-to-Point Wiring Diagrams | 1 | |||||||||||
| 156 | Plan View | 1 | |||||||||||
| 157 | Wiring | 1 | |||||||||||
| 158 | Conduits | 1 | |||||||||||
| 159 | Qualifications of Installer | 1 | |||||||||||
| 160 | Record of Completion | 1 | |||||||||||
| 161 | Interior Fire Alarm System | 1 | |||||||||||
| 162 | Record Drawing Software | 1 | |||||||||||
| 163 | As-Built Drawings of Fire Alarm System | 1 | Prior to FI | ||||||||||
| SECTION 32 31 00 | |||||||||||||
| 164 | Posts, rod and chain link fabric | 1 | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 10-1016 | TÍTULO DE PROYECTO: | |||
| RENOVAR EDIFICIO DE OPERACIONES, 1411 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||||||||
| 1 | Programa de obra | 1 | NTP+5 | ||||||||||
| 2 | Plan de obra | 1 | NTP+5 | ||||||||||
| 3 | Plan de Fases de Trabajo | 1 | NTP + 15 | ||||||||||
| 4 | Plan de Cortes de Suministro | 1 | Comienzo de cada fase - 15 | ||||||||||
| SECCIÓN 01 11 01 | |||||||||||||
| 5 | Programa de avance de obras | 1 | NTP+5 | ||||||||||
| 6 | Plan de movilización | 1 | NTP+5 | ||||||||||
| 7 | Plan de control de calidad | 1 | NTP+10 | ||||||||||
| 8 | Gestión de residuos y escombros | 1 | Antes de la Inspección final | ||||||||||
| 9 | Planos As-Builts | 1 | Antes de la Inspección final | ||||||||||
| 10 | Cartel de Obra | 1 | NTP+15 | ||||||||||
| 11 | Datos espaciales | 1 | Antes de la Inspección final | ||||||||||
| 12 | Personal clave | 1 | NTP+15 | ||||||||||
| 13 | Plan de seguridad | 1 | Antes de cualquier trabajo | ||||||||||
| 14 | Carta de garantía | 1 | Antes de la Inspección final | ||||||||||
| 15 | Manuales de Operación y Mantenimiento | 1 | Antes de la Inspección final | ||||||||||
| SECCIÓN 02 41 10 | |||||||||||||
| 16 | Programa y plan de las obras | 1 | |||||||||||
| 17 | Plan de demolición | 1 | |||||||||||
| 18 | Plan de gestión y eliminación de residuos | 1 | |||||||||||
| 19 | Gestor de residuos | 1 | |||||||||||
| 20 | Vertedero autorizado o planta de tratamiento y valorización de residuos | 1 | |||||||||||
| 21 | Depósitos de residuos | 1 | |||||||||||
| SECCIÓN 04 20 00 | |||||||||||||
| 22 | Ladrillos huecos, ladrillos para fábrica y bloques cerámicos | 1 | 1 | ||||||||||
| SECCIÓN 05 12 00 | |||||||||||||
| 23 | Plano de montaje | 1 | |||||||||||
| 24 | Procedimiento y culaificaciones para soldadura | 1 | |||||||||||
| SECCIÓN 06 20 00 | |||||||||||||
| 25 | Carpintería prefabricada | 1 | |||||||||||
| 26 | Cocina | 1 | 1 | 1 | |||||||||
| 27 | Armarios de cocina, marcos acabado de paneles | 1 | |||||||||||
| 28 | Paneles fenólicos | 1 | 1 | 1 | 1 | ||||||||
| SECCIÓN 07 32 14 | |||||||||||||
| 29 | Barrera de vapor | 1 | |||||||||||
| 30 | Hormigón aligerado | 1 | 1 | ||||||||||
| 31 | Membrana de impermeabilización | 1 | 1 | 1 | 1 | 1 | |||||||
| 32 | Baldosín cerámico | 1 | 1 | 1 | 1 | ||||||||
| 33 | Mástico | 1 | 1 | 1 | |||||||||
| 34 | Componentes tratamiento impermeabilizante | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
| SECCIÓN 07 92 00 | |||||||||||||
| 35 | Sellantes, imprimación y desencofrantes | 1 | |||||||||||
| SECCIÓN 08 14 00 | |||||||||||||
| 36 | Puertas de madera | 1 | 1 | ||||||||||
| SECCIÓN 08 71 00 | |||||||||||||
| 37 | Componentes de cerrajería | 1 | |||||||||||
| 38 | Instalaciones | 1 | 1 | ||||||||||
| SECCIÓN 09 29 00 | |||||||||||||
| 39 | Placas de cartón-yeso resistentes a la humedad y resistentes al fuego | 1 | 1 | ||||||||||
| 40 | Selladores y accesorios | 1 | |||||||||||
| 41 | Sistema de suspensión | 1 | |||||||||||
| 42 | Materiales exentos de amianto | 1 | |||||||||||
| SECCiÓN 09 30 00 | |||||||||||||
| 43 | Baldosas, azulejos, perfiles de juntas, mortero, adhesivos y material de rejuntado | 1 | |||||||||||
| 44 | Loseta de gres porcelánico para solería y terrazo | 1 | |||||||||||
| 45 | Rodapié terrazo y piezas especiales de gres | 1 | |||||||||||
| 46 | Loseta cerámica para alicatado | 1 | |||||||||||
| 47 | Adhesivo, material de juntas y mortero nivelante | 1 | 1 | ||||||||||
| SECCIÓN 09 51 00 | |||||||||||||
| 48 | Placas acústicas | 1 | |||||||||||
| 49 | Sistema de suspensión | 1 | |||||||||||
| 50 | Secondary metal structure | 1 | |||||||||||
| SECCIÓN 09 90 00 | |||||||||||||
| 51 | Recubrimiento y/o producto suministrado | 1 | |||||||||||
| SECCIÓN 10 28 13 | |||||||||||||
| 52 | Lavabo para encastrar y accesorio | 1 | |||||||||||
| 53 | Inodoro y accesorios | 1 | |||||||||||
| 54 | Urinario y accesorios | 1 | |||||||||||
| 55 | Ducha y accesorios | 1 | |||||||||||
| 56 | Fregadero de cocina y accesorios | 1 | |||||||||||
| 57 | Percha | 1 | |||||||||||
| 58 | Espejos | 1 | |||||||||||
| 59 | dispensador de papel higiénico | 1 | |||||||||||
| 60 | Dispensador de toallas de papel | 1 | |||||||||||
| 61 | Jabonera ducha | 1 | |||||||||||
| 62 | Repisa para lavabo | 1 | |||||||||||
| 63 | Dispositivos de ahorro de agua | 1 | |||||||||||
| SECCIÓN 21 13 13 | |||||||||||||
| 64 | Rociadores automáticos | 1 | 1 | ||||||||||
| 65 | Tuberías y accesorios | 1 | 1 | ||||||||||
| 66 | Soporte y colgadores de tubería | 1 | |||||||||||
| 67 | Cualificaciones del instalador | 1 | |||||||||||
| 68 | Ingeniero de Diseño | 1 | |||||||||||
| 69 | Inspección | 1 | |||||||||||
| 70 | Cálculo hidráulico del sistema de rociadores | 1 | |||||||||||
| 71 | Planos de distribución del sistema actual de tubería y rociadores | 1 | |||||||||||
| 72 | Planos de detalles y diseño del sistema de tuberías y rociadores propuesto | 1 | |||||||||||
| 73 | Planos As-Built | 1 | |||||||||||
| SECCIÓN 22 00 00 | |||||||||||||
| 74 | Tubos de PVC rígido | 1 | 1 | ||||||||||
| 75 | Tubos de cobre | 1 | 1 | ||||||||||
| 76 | Válvulas de bola | 1 | |||||||||||
| 77 | Válvula de retención | 1 | |||||||||||
| 78 | Purgador automático de aire | 1 | |||||||||||
| 79 | Grifo para manguera y rompedor de vacío | 1 | |||||||||||
| 80 | Bote sifónico con sumidero | 1 | |||||||||||
| 81 | Sumidero | 1 | |||||||||||
| 82 | Bombas de recirculación de agua caliente sanitaria | 1 | |||||||||||
| SECCIÓN 23 00 00 | |||||||||||||
| 83 | Manuales de funcionamiento y mantenimiento | 1 | |||||||||||
| SECCIÓN 23 07 00 | |||||||||||||
| 84 | Aislamiento de tubería de agua fría | 1 | |||||||||||
| 85 | Aislamiento de tubería de agua caliente sanitaria | 1 | |||||||||||
| 86 | Aislamiento de tubería de agua enfriada | 1 | |||||||||||
| 87 | Aislamiento de conductos | 1 | |||||||||||
| SECCIÓN 23 30 13 | |||||||||||||
| 88 | Conductos rectangulares de chapa metálica | 1 | |||||||||||
| 89 | Conductos circulares flexibles | 1 | |||||||||||
| 90 | Rejillas de retorno | 1 | |||||||||||
| 91 | Empresa de limpieza y desinfección del sistema de distribución de aire acondicionado | 1 | |||||||||||
| 92 | Certificado de calidad ITEL | 1 | |||||||||||
| 93 | Informe de intervención limpieza | 1 | |||||||||||
| 94 | Videograbación y reportaje fotográfico | 1 | |||||||||||
| 95 | Pruebas y equilibrado del sistema completo de A/A | 1 | |||||||||||
| SECCIÓN 23 35 19 | |||||||||||||
| 96 | Unidades enfriadoras (bomba de calor) | 1 | |||||||||||
| 97 | Unidades climatizadoras | 1 | |||||||||||
| 98 | Tuberías de cobre | 1 | |||||||||||
| 99 | Tuberías de acero | 1 | |||||||||||
| 100 | Juntas de expansión | 1 | |||||||||||
| 101 | Manómetro | 1 | |||||||||||
| 102 | Termómetro | 1 | |||||||||||
| 103 | Interruptor de flujo | 1 | |||||||||||
| 104 | Válvulas de bola | 1 | |||||||||||
| 105 | Válvulas de retención | 1 | |||||||||||
| 106 | Válvulas K-flow | 1 | |||||||||||
| 107 | Bombas | 1 | |||||||||||
| 108 | Extractor | 1 | |||||||||||
| 109 | Tratamiento químico del agua | 1 | |||||||||||
| 110 | Bancadas de soporte y conductos de impulsión/retorno para unidades climatizadoras | 1 | |||||||||||
| SECCIÓN 26 20 00 | |||||||||||||
| 111 | Tubo RMC y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 112 | Tubo EMT y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 113 | Tubo FMC y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 114 | Canaleta Metálica de Superficie y acc. (todos tamaños) | 1 | |||||||||||
| 115 | Tubo flexible no metálico y accesorios (1 x cada diámetro) | 1 | |||||||||||
| 116 | Pulsadores de paro de emergencia de climatización | 1 | |||||||||||
| 117 | Cajas de conexión y paso | 1 | |||||||||||
| 118 | Cajas para mecanismos y tapas | 1 | |||||||||||
| 119 | Conductores y cables | 1 | |||||||||||
| 120 | Empalmes y terminales | 1 | |||||||||||
| 121 | Interruptores magnetotérmicos y bobinas de disparo | 1 | |||||||||||
| 122 | Placas de mecanismos | 1 | |||||||||||
| 123 | Enchufes (uno de cada tipo) | 1 | |||||||||||
| 124 | Interruptores (uno de cada tipo) | 1 | |||||||||||
| 125 | Etiquetas | 1 | |||||||||||
| 126 | Planos Existentes | 1 | |||||||||||
| 127 | Planos As-Built | 1 | |||||||||||
| 128 | Dispositivos sujetos a operación manual | 1 | Antes de la Inspección final | ||||||||||
| 129 | Pruebas de Cableado de 1000 V | 1 | Antes de la Inspección final | ||||||||||
| 130 | Pruebas de Enchufes con Protección Diferencial GFI | 1 | Antes de la Inspección final | ||||||||||
| 131 | Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra | 1 | IF-15 | ||||||||||
| 132 | Equipo eléctrico activo | 1 | IF-15 | ||||||||||
| SECCIÓN 26 51 00 | |||||||||||||
| 133 | Luminaria LED Tipo A, Driver y accesorios | 1 | |||||||||||
| 134 | Luminaria LED Tipo B, Driver y accesorios | 1 | |||||||||||
| 135 | Luminaria LED Tipo C Driver y accesorios | 1 | |||||||||||
| 136 | Luminaria LED Tipo D, Driver y accesorios | 1 | |||||||||||
| 137 | Luminaria LED Tipo E, Driver y accesorios | 1 | |||||||||||
| 138 | Luminaria LED Tipo F, Driver y accesorios | 1 | |||||||||||
| 137 | Unidad de Control de Presencia y Luz Diurna | 1 | |||||||||||
| 138 | Interruptor Regulador | 1 | |||||||||||
| 139 | Materiales Locales/Regionales | 1 | |||||||||||
| 140 | Luminarias LED | 1 | |||||||||||
| 141 | Sistema de Control de Iluminación | 1 | |||||||||||
| 142 | Ensayos de Funcionamiento | 1 | |||||||||||
| 143 | Garantía de Luminarias LED | 1 | |||||||||||
| 144 | Certificado de Vida Útil de Luminarias LED | 1 | |||||||||||
| 145 | Resultados de Cálculo Luminotécnico | 1 | |||||||||||
| 146 | Entrega de Repuestos | 1 | |||||||||||
| 147 | Formación del Personal del Gobierno | 1 | |||||||||||
| 148 | Manuales de Operación y Mantenimiento | 1 | |||||||||||
| SECCIÓN 27 10 00 | |||||||||||||
| 149 | Cables de comunicaciones | 1 | |||||||||||
| 150 | Tubos | 1 | |||||||||||
| 151 | Escudetes/tomas | 1 | |||||||||||
| 152 | Etiquetas | 1 | |||||||||||
| 153 | Prueba del cableado | 1 | |||||||||||
| SECCIÓN 28 31 74.00 20 | |||||||||||||
| 154 | Planos Existentes | 1 | Antes de realizar ninguna modificación | ||||||||||
| 155 | Esquema de Cableado Punto a Punto | 1 | |||||||||||
| 156 | Planos de Planta | 1 | |||||||||||
| 157 | Cableado | 1 | |||||||||||
| 158 | Conductos | 1 | |||||||||||
| 159 | Cualificaciones del Instalador | 1 | |||||||||||
| 160 | Boletín de Instalación | 1 | |||||||||||
| 161 | Sistema de Alarma Interior de Incendios | 1 | |||||||||||
| 162 | Planos en Software | 1 | |||||||||||
| 163 | Planos As-Built del Sistema de Alarma Contra-incendios | 1 | Antes de la Inspección final | ||||||||||
| SECCIÓN 32 31 00 | |||||||||||||
| 164 | Postes, tirantes y malla | 1 | 1 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N