10-1016_AF66-English.xlsx

XLSX spreadsheet 84 KB Posted

Attached to
Repair Base Operations Facility, Bldg 1411 Federal contract opportunity
Solicitation number
FA5575-16-B-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Submittal Form

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Operations Facility, Bldg 1411, newest first.
File Type Posted
Q A_Notice_to_Offerors.docx DOCX document
QUUG_10-1016_Especificaciones_Espaol.pdf PDF
10-1016_Drawings.pdf PDF
10-1016_Construction_Cost_Estimate_Breakdown_KTOR.xlsx XLSX spreadsheet
FA5575-16-B-0003_RPR_Base_Ops_Fac_1411.pdf PDF
QUUG_10-1016_Specifications_English.pdf PDF
Synopsis_FA5575-16-B-0003.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 10-1016PROJECT TITLE

RENOVATE BASE OPS FACILITY, 1411

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1NTP+5
2Work Plan1NTP+5
3Construction Phasing Plan1NTP + 15
4Shut-off Schedule Plan1Each Phase Start - 15
SECTION 01 11 01
5Progress Schedule1NTP+5
6Mobility Plan1NTP+5
7Quality Control Plan1NTP+10
8Waste & construction debris management1Prior to FI
9As-Built drawings1Prior to FI
10Project Sign1NTP+15
11Spatial Data1Prior to FI
12Key Personnel1NTP+15
13Safety Program1Before any work execution
14Warranty letter1Prior to FI
15O&M Manuals1Prior to FI
SECTION 02 41 10
16Program and schedule of the works1
17Demolition plan1
18Management and disposal plan of the waste1
19Manager of waste from demolition and construction1
20Authorized dump or treatment and recovery plant1
21Delivery and disposal certicate of waste1
SECTION 04 20 00
22Hollow brick, brick, clayblock11
SECTION 05 12 00
23Erection Plan1
24Welding procedures and qualifications1
SECTION 06 20 00
25Prefabricated millwork1
26Kitchen111
27Kitchen cabinet frame profiles and panel finishes1
28Phenolic panels1111
SECTION 07 32 14
29Vapor barrier1
30Lightweight concrete11
31Waterproof membrane11111
32Tile1111
33Mastic111
34Waterproof treatment components111111
SECTION 07 92 00
35Sealants, primers and bond breakers1
SECTION 08 14 00
36Wood doors11
SECTION 08 71 00
37Hardware items1
38Installation11
SECTION 09 29 00
39Water resistant and fire resistant gypsum boards11
40Sealant and accessories1
41Suspension system1
42Asbestos Free Materials1
SECTION 09 30 00
43Floor tiles, wall tiles, joint profiles, adhesives, joint grounting1
44Porcelanic gress floor tile and terrazzo tile1
45Polished terrazzo baseboard and gres s[pecial tiles1
46Ceramic wall tile1
47Adhesive, grouting material and leveling mortar11
SECTION 09 51 00
48Acoustical tile ceiling units1
49Suspension system1
50Secondary metal structure1
SECTION 09 90 00
51Coating and/or product furnished1
SECTION 10 28 13
52Recessed wash basin and accessories1
53WC bowl and accessories1
54Urinal and accessories1
55Shower and accessories1
56Kitchen sink and accessories1
57Robe hook1
58Mirrors1
59Toilet paper dispenser1
60Paper towel dispenser1
61Shower soap holder1
62Lavatory Shelf1
63Water saving devices1
SECTION 21 13 13
64Automatic sprinklers11
65Piping and accessories11
66Pipe hangers and supports1
67Qualification of installer1
68Design Engineer1
69Inspection1
70Sprinkler system hydraulic calculations1
71Drawings of current Sprinkler heads and piping system layout1
72Drawings of proposed Sprinkler heads and piping system layout1
73As-Built drawings1
SECTION 22 00 00
74Rigid PVC piping11
75Copper piping11
76Ball valve1
77Check valve1
78Automatic air vent1
79Hose bibb and hose connection vacuum breaker1
80Floor deep seal trap with floor drain1
81Floor drain1
82Domestic Hot Water recirculation pumps1
SECTION 23 00 00
83O&M Manuals1
SECTION 23 07 00
84Domestic cold water piping insulation1
85Domestic hot water piping insulation1
86Chilled water puping insulation1
87Duct insulation1
SECTION 23 30 13
88Sheet metal rectangulat ducts1
89Circular flexible ductwork1
90Return grilles1
91Air distribution system cleaning/ disinfection company1
92Quality certification from ITEL1
93Cleaning report1
94Video recording and photos1
95Testing and balancing of air conditioning systems1
SECTION 23 35 19
96Heat pump chillers1
97Air handling units1
98Copper pipes1
99Steel pipe1
100Expansion joint seals1
101Pressure gauge1
102Thermometer1
103Flow switch1
104Ball valve1
105Check valve1
106K-flow valve1
107Pumps1
108Exhaust fans1
109Chemical water treatment1
110Supports and supply/return ducts for air handling units1
SECTION 26 20 00
111RMC Conduit and fittings (1 of each size)1
112EMT Conduit and fittings (1 of each size)1
113FMC Conduit and fittings (1 of each size)1
114Surface Metal Raceway and fittings (all sizes)1
115Flexible Non-Metallic Conduit and fittings (1 of each size)1
116Emergency HVAC shutoff pushbuttons1
117Junction and pull boxes1
118Outlet boxes and covers1
119Wires and cables1
120Splices and Termination Components1
121Circuit breakers and auxiliary trip coils1
122Device Plates1
123Receptacles (one of each type)1
124Toggle Switches (one of each type)1
125Labels1
126Existing Drawings1
127As-built Drawings1
128Devices Subject to Manual Operation1Prior to FI
1291000 V Wiring test1Prior to FI
130Ground-Fault Interrupter Receptacle Test1Prior to FI
131Single line diagram of the “as-built” building electrical system1FI-15
132Active electrical equipment1FI-15
SECTION 26 51 00
133LED Luminaire Type A, Driver and accessories1
134LED Luminaire Type B, Driver and accessories1
135LED Luminaire Type C, Driver and accessories1
136LED Luminaire Type D, Driver and accessories1
137LED Luminaire Type E, Driver and accessories1
138LED Luminaire Type F, Driver and accessories1
137Light/Occupancy Sensor and Controller1
138Dimmer Switch1
139Local/Regional Materials1
140LED Luminaires1
141Lighting Control System1
142Operating Test1
143Electronic Ballast Warranty1
144LED Luminaire Useful Life Certificate1
145Lighting Calculation Results1
146Spare Parts Delivery1
147Instruction to Government Personnel1
148O&M Manuals1
SECTION 27 10 00
149Telecommunication cabling1
150Conduits1
151Faceplates/outlets1
152Labels1
153Cable testing1
SECTION 28 31 74.00 20
154Existing Drawings1Before any modification is performed
155Point-to-Point Wiring Diagrams1
156Plan View1
157Wiring1
158Conduits1
159Qualifications of Installer1
160Record of Completion1
161Interior Fire Alarm System1
162Record Drawing Software1
163As-Built Drawings of Fire Alarm System1Prior to FI
SECTION 32 31 00
164Posts, rod and chain link fabric11

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 10-1016TÍTULO DE PROYECTO:
RENOVAR EDIFICIO DE OPERACIONES, 1411SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obra1NTP+5
2Plan de obra1NTP+5
3Plan de Fases de Trabajo1NTP + 15
4Plan de Cortes de Suministro1Comienzo de cada fase - 15
SECCIÓN 01 11 01
5Programa de avance de obras1NTP+5
6Plan de movilización1NTP+5
7Plan de control de calidad1NTP+10
8Gestión de residuos y escombros1Antes de la Inspección final
9Planos As-Builts1Antes de la Inspección final
10Cartel de Obra1NTP+15
11Datos espaciales1Antes de la Inspección final
12Personal clave1NTP+15
13Plan de seguridad1Antes de cualquier trabajo
14Carta de garantía1Antes de la Inspección final
15Manuales de Operación y Mantenimiento1Antes de la Inspección final
SECCIÓN 02 41 10
16Programa y plan de las obras1
17Plan de demolición1
18Plan de gestión y eliminación de residuos1
19Gestor de residuos1
20Vertedero autorizado o planta de tratamiento y valorización de residuos1
21Depósitos de residuos1
SECCIÓN 04 20 00
22Ladrillos huecos, ladrillos para fábrica y bloques cerámicos11
SECCIÓN 05 12 00
23Plano de montaje1
24Procedimiento y culaificaciones para soldadura1
SECCIÓN 06 20 00
25Carpintería prefabricada1
26Cocina111
27Armarios de cocina, marcos acabado de paneles1
28Paneles fenólicos1111
SECCIÓN 07 32 14
29Barrera de vapor1
30Hormigón aligerado11
31Membrana de impermeabilización11111
32Baldosín cerámico1111
33Mástico111
34Componentes tratamiento impermeabilizante111111
SECCIÓN 07 92 00
35Sellantes, imprimación y desencofrantes1
SECCIÓN 08 14 00
36Puertas de madera11
SECCIÓN 08 71 00
37Componentes de cerrajería1
38Instalaciones11
SECCIÓN 09 29 00
39Placas de cartón-yeso resistentes a la humedad y resistentes al fuego11
40Selladores y accesorios1
41Sistema de suspensión1
42Materiales exentos de amianto1
SECCiÓN 09 30 00
43Baldosas, azulejos, perfiles de juntas, mortero, adhesivos y material de rejuntado1
44Loseta de gres porcelánico para solería y terrazo1
45Rodapié terrazo y piezas especiales de gres1
46Loseta cerámica para alicatado1
47Adhesivo, material de juntas y mortero nivelante11
SECCIÓN 09 51 00
48Placas acústicas1
49Sistema de suspensión1
50Secondary metal structure1
SECCIÓN 09 90 00
51Recubrimiento y/o producto suministrado1
SECCIÓN 10 28 13
52Lavabo para encastrar y accesorio1
53Inodoro y accesorios1
54Urinario y accesorios1
55Ducha y accesorios1
56Fregadero de cocina y accesorios1
57Percha1
58Espejos1
59dispensador de papel higiénico1
60Dispensador de toallas de papel1
61Jabonera ducha1
62Repisa para lavabo1
63Dispositivos de ahorro de agua1
SECCIÓN 21 13 13
64Rociadores automáticos11
65Tuberías y accesorios11
66Soporte y colgadores de tubería1
67Cualificaciones del instalador1
68Ingeniero de Diseño1
69Inspección1
70Cálculo hidráulico del sistema de rociadores1
71Planos de distribución del sistema actual de tubería y rociadores1
72Planos de detalles y diseño del sistema de tuberías y rociadores propuesto1
73Planos As-Built1
SECCIÓN 22 00 00
74Tubos de PVC rígido11
75Tubos de cobre11
76Válvulas de bola1
77Válvula de retención1
78Purgador automático de aire1
79Grifo para manguera y rompedor de vacío1
80Bote sifónico con sumidero1
81Sumidero1
82Bombas de recirculación de agua caliente sanitaria1
SECCIÓN 23 00 00
83Manuales de funcionamiento y mantenimiento1
SECCIÓN 23 07 00
84Aislamiento de tubería de agua fría1
85Aislamiento de tubería de agua caliente sanitaria1
86Aislamiento de tubería de agua enfriada1
87Aislamiento de conductos1
SECCIÓN 23 30 13
88Conductos rectangulares de chapa metálica1
89Conductos circulares flexibles1
90Rejillas de retorno1
91Empresa de limpieza y desinfección del sistema de distribución de aire acondicionado1
92Certificado de calidad ITEL1
93Informe de intervención limpieza1
94Videograbación y reportaje fotográfico1
95Pruebas y equilibrado del sistema completo de A/A1
SECCIÓN 23 35 19
96Unidades enfriadoras (bomba de calor)1
97Unidades climatizadoras1
98Tuberías de cobre1
99Tuberías de acero1
100Juntas de expansión1
101Manómetro1
102Termómetro1
103Interruptor de flujo1
104Válvulas de bola1
105Válvulas de retención1
106Válvulas K-flow1
107Bombas1
108Extractor1
109Tratamiento químico del agua1
110Bancadas de soporte y conductos de impulsión/retorno para unidades climatizadoras1
SECCIÓN 26 20 00
111Tubo RMC y accesorios (1 x cada diámetro)1
112Tubo EMT y accesorios (1 x cada diámetro)1
113Tubo FMC y accesorios (1 x cada diámetro)1
114Canaleta Metálica de Superficie y acc. (todos tamaños)1
115Tubo flexible no metálico y accesorios (1 x cada diámetro)1
116Pulsadores de paro de emergencia de climatización1
117Cajas de conexión y paso1
118Cajas para mecanismos y tapas1
119Conductores y cables1
120Empalmes y terminales1
121Interruptores magnetotérmicos y bobinas de disparo1
122Placas de mecanismos1
123Enchufes (uno de cada tipo)1
124Interruptores (uno de cada tipo)1
125Etiquetas1
126Planos Existentes1
127Planos As-Built1
128Dispositivos sujetos a operación manual1Antes de la Inspección final
129Pruebas de Cableado de 1000 V1Antes de la Inspección final
130Pruebas de Enchufes con Protección Diferencial GFI1Antes de la Inspección final
131Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra1IF-15
132Equipo eléctrico activo1IF-15
SECCIÓN 26 51 00
133Luminaria LED Tipo A, Driver y accesorios1
134Luminaria LED Tipo B, Driver y accesorios1
135Luminaria LED Tipo C Driver y accesorios1
136Luminaria LED Tipo D, Driver y accesorios1
137Luminaria LED Tipo E, Driver y accesorios1
138Luminaria LED Tipo F, Driver y accesorios1
137Unidad de Control de Presencia y Luz Diurna1
138Interruptor Regulador1
139Materiales Locales/Regionales1
140Luminarias LED1
141Sistema de Control de Iluminación1
142Ensayos de Funcionamiento1
143Garantía de Luminarias LED1
144Certificado de Vida Útil de Luminarias LED1
145Resultados de Cálculo Luminotécnico1
146Entrega de Repuestos1
147Formación del Personal del Gobierno1
148Manuales de Operación y Mantenimiento1
SECCIÓN 27 10 00
149Cables de comunicaciones1
150Tubos1
151Escudetes/tomas1
152Etiquetas1
153Prueba del cableado1
SECCIÓN 28 31 74.00 20
154Planos Existentes1Antes de realizar ninguna modificación
155Esquema de Cableado Punto a Punto1
156Planos de Planta1
157Cableado1
158Conductos1
159Cualificaciones del Instalador1
160Boletín de Instalación1
161Sistema de Alarma Interior de Incendios1
162Planos en Software1
163Planos As-Built del Sistema de Alarma Contra-incendios1Antes de la Inspección final
SECCIÓN 32 31 00
164Postes, tirantes y malla11

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .