Construction_Cost_Estimate_Breakdown _Contractor.xls
XLS spreadsheet 57 KB Posted
- Attached to
- Repair Perimeter Road and Fence
- Solicitation number
- FA5575-15-B-0013
About this file
AF 3052
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PP_reference_list.doc | DOC document | |
| 11-1002_Part6.pdf | ||
| 11-1002_Part2.pdf | ||
| 11-1002_Part5.pdf | ||
| 11-1002_Part7.pdf | ||
| 11-1002_Part8.pdf | ||
| 11-1002_Part4.pdf | ||
| 11-1002_Part3.pdf | ||
| 11-1002 _Especificaciones.pdf | ||
| 11-1002 _Specifications.pdf | ||
| FA5575-15-B-0013.pdf | ||
| Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| 11-1002_Part1.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pages 1 - Penultimate
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORÓN AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||||
| RPR PERIMETER ROAD & FENCE / REPARAR CARRETERA Y VALLA PERIMETRAL | € | ||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 11-1002 | MORÓN AIR BASE, SPAIN | ||||||
| LINE | |||||||
| NO. | ITEM | UNIT OF | |||||
| MEASURE | MATERIAL COST | LABOR COSTS | OTHER |
DIRECT
COSTS LINE
TOTAL
| QUANTITY | UNIT | TOTAL | MANDAYS | AVERAGE | |||||||
| RATE | TOTAL | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 1 | Pavement perimeter sawcut | ||||||||||
| Corte con disco del perimetro del pavimento | m | ||||||||||
| 2 | Removal of bituminous surface treatment and hot mix asphalt | ||||||||||
| Retirada de tratamiento bituminoso superficial y asfalto en caliente | m2 | ||||||||||
| 3 | Transportation to dump of demolished & excavated |
material & dumping fee.
Transporte a vertedero de material demolido y excavado y
| canon de vertido. | m3 | |
| 4 | Remove the ruts and potholes from the aggregate base course | |
| Eliminación de rodadas y baches de la capa base de zahorra | m3 | |
| 5 | Scarify the surface of the aggregate base course | |
| Escarificar la superficie de la capa base de zahorra | m2 | |
| 6 | Add additional aggregates to increase the thickness back to the original thickness | |
| Añadir zahorra adicional para incrementar el espesor hasta su espesor original | m3 | |
| 7 | Grade the surface of the aggregate base course | |
| Nivelar la supericie de la capa base de zahorra | m2 | |
| 8 | Recompact the aggregate base course to the 98% Modified Proctor | |
| Recompactar la capa base de zahorra al 98% Proctor Modificado | m2 | |
| 9 | Apply prime coat C50BF5 IMP type | |
| Aplicar riego de imprimación tipo C50BF5 IMP | t | |
| 10 | Place and compact 5 cm thick hot mix asphalt AC22bin35/50D type | |
| Colocar y compactar 5 cm de espesor de asfalto en caliente tipo AC22bin35/50D | t | |
| 11 | Apply tack coat C60B4 ADH type | |
| Aplicar riego de adherencia tipo C60B4 ADH | t | |
| 12 | Place and compact 5 centimeters of hot mix asphalt AC16surf35/50D type | |
| Colocar y compactar 5 cm de espesor de asfalto en caliente tipoAC16surf35/50D | t | |
| 13 | Replace perimeter fence and gates | |
| Reemplazar valla perimetral y puertas | m2 | |
| Total |
Total
| TOTAL MATERIAL COSTS | € | ||||
| TOTAL LABOR COSTS | € | ||||
| TOTAL OTHER DIRECT COSTS | € | ||||
| TOTAL DIRECT COSTS | € | ||||
| OVERHEAD | % | € | |||
| SUBTOTAL | € | ||||
| PROFIT | % | € | |||
| TOTAL PRICE | € | ||||
| DATE: | FIRM NAME: | ||||
| TITLE: | BY: | ||||
| (Signature) |
&R&"Times New Roman,Regular"Page &P of &N
Last Page
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| Col. 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. | |
| Col. 2 Units of Measure. Description of the unit in which each item is to be estimated (examples: square meters - m2, cubic meters - m3, linear meters - m, unit - u, kilograms - kg, ton - t). | |
| Col. 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (Column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |
| Col. 4 and 5 Material Costs. Enter unit cost (Column 4) of the material to be supplied and total cost (Column 5) for item listed in Column 1. Cost must be in euros. | |
| Col. 6, 7 and 8 Labor Costs. Enter in Column 6 the estimated number of mandays needed to perform the work listed in Column 1. Costs must be in euros. | |
| Col. 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Column 1) which are special to the contract and of significant euro value. Cost must be in euros. | |
| Col 10 Line Total. Self-explanatory. Cost must be in euros. | |
| NOTE: In addition to other totals derived on various pages, the grand total of Column 10, plus overhead and profit will be shown on the last page. Overhead and profit must be applied over the total direct cost. | |
| INSTRUCTIONS TO OFFERORS | |
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data. | |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of: | |
| a. The existing, verifiable data. | |
| b. The judgmental factors applied in projecting from known data to the estimate, and | |
| c. The contingencies used by the offeror in his proposed price. | |
| In short, the offeror's estimating process itself needs to be disclosed. | |
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer, or his authorized representative, upon request. | |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award. |
&R&"Times New Roman,Regular"Page 4 of 4
File details come from the government source that posted it. Updated .