01-1018P2_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Repair Secondary Water Lines Phase 2
Solicitation number
FA5575-13-R-0004
Issued by

About this file

Schedule of Material Submittals

View the file

Other files

File Type Posted
Attachment_4_-_PPI_Questionnaire.doc DOC document
Attachment_3_-_PPI_reference_list.doc DOC document
FA5575-13-R-0004 _RPL_Secondary_Water_Lines_Phase2.doc DOC document
01-1018P2_Specs_English.pdf PDF
01-1018P2_Specs_Spanish.pdf PDF
01-1008P2_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 01-1018P2PROJECT TITLE
RPR SECONDARY WATER LINES PHASE 2SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01000
1Construction ScheduleNTP+5
2Work PlanNTP+5
SECTION 01011
3Progress Schedule4NTP+5
4Mobility Plan4NTP+5
5Quality Control Plan4NTP+5
6Waste & construction debris management4Final Inspection
7As-Built drawings4FI+15
8Spatial DataFI+15
9Personel listing4NTP+5
10Safety Program4NTP+5
11Warranty letter4FI+30
SECTION 03 30 00
12Inspection of the concrete batch plant4
13Concrete control test program4
14Results of the concrete control tests4
15Assembly of ironworks4
SECTION 09 90 00
16Each type of coating and/or product furnished4
SECTION 22 00 00
17High-density polyethylene piping PE 10044
18Accessories for polyethylene pipe connections44
19DIN 2440 galvanized steel pipe4
20Flush type fire hydrant4
21Gate valve4
22Air relief valve4
23Flanged Tee4
24Universal flange adapter and coupling4

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 01-1018 P2TÍTULO DE PROYECTO:
REPARAR LÍNEAS DE AGUA SECUNDARIAS, FASE 2SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01000
1Plan de construcciónNTP+5
2Plan de obraNTP+5
SECCIÓN 01011
3Programa de avance de obras4NTP+5
4Plan de movilización4NTP+5
5Plan de control de calidad4NTP+5
6Gestión de residuos y escombros4Inspección final
7Planos As-Builts4IF+15
8Datos espaciales4IF+15
9Listado de personal4NTP+5
10Plan de seguridad4NTP+5
11Carta de garantía4IF+30
SECCIÓN 03 30 00
12Central de fabricación4
13Programa de ensayos de control del hormigón4
14Resultado de los ensayos de control del hormigón4
15Plano de montaje de feralla4
SECCIÓN 09 90 00
16Cada tipo de recubrimiento y/o producto suministrado4
SECCIÓN 22 00 00
17Tubos de polietileno de alta densidad PE10044
18Accesorios de conexión para tuberías de polietileno44
19Tubería de acero galvanizado DIN 24404
20Hidrante contraincendios enrasado4
21Válvula de compuerta4
22Ventosa4
23T de conexión con bridas4
24Brida y manguito universal4

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N