01-1018P2_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- Repair Secondary Water Lines Phase 2
- Solicitation number
- FA5575-13-R-0004
About this file
Schedule of Material Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_PPI_Questionnaire.doc | DOC document | |
| Attachment_3_-_PPI_reference_list.doc | DOC document | |
| FA5575-13-R-0004 _RPL_Secondary_Water_Lines_Phase2.doc | DOC document | |
| 01-1018P2_Specs_English.pdf | ||
| 01-1018P2_Specs_Spanish.pdf | ||
| 01-1008P2_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 01-1018P2 | PROJECT TITLE | |||
| RPR SECONDARY WATER LINES PHASE 2 | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01000 | |||||||
| 1 | Construction Schedule | NTP+5 | |||||
| 2 | Work Plan | NTP+5 | |||||
| SECTION 01011 | |||||||
| 3 | Progress Schedule | 4 | NTP+5 | ||||
| 4 | Mobility Plan | 4 | NTP+5 | ||||
| 5 | Quality Control Plan | 4 | NTP+5 | ||||
| 6 | Waste & construction debris management | 4 | Final Inspection | ||||
| 7 | As-Built drawings | 4 | FI+15 | ||||
| 8 | Spatial Data | FI+15 | |||||
| 9 | Personel listing | 4 | NTP+5 | ||||
| 10 | Safety Program | 4 | NTP+5 | ||||
| 11 | Warranty letter | 4 | FI+30 | ||||
| SECTION 03 30 00 | |||||||
| 12 | Inspection of the concrete batch plant | 4 | |||||
| 13 | Concrete control test program | 4 | |||||
| 14 | Results of the concrete control tests | 4 | |||||
| 15 | Assembly of ironworks | 4 | |||||
| SECTION 09 90 00 | |||||||
| 16 | Each type of coating and/or product furnished | 4 | |||||
| SECTION 22 00 00 | |||||||
| 17 | High-density polyethylene piping PE 100 | 4 | 4 | ||||
| 18 | Accessories for polyethylene pipe connections | 4 | 4 | ||||
| 19 | DIN 2440 galvanized steel pipe | 4 | |||||
| 20 | Flush type fire hydrant | 4 | |||||
| 21 | Gate valve | 4 | |||||
| 22 | Air relief valve | 4 | |||||
| 23 | Flanged Tee | 4 | |||||
| 24 | Universal flange adapter and coupling | 4 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 01-1018 P2 | TÍTULO DE PROYECTO: | |||
| REPARAR LÍNEAS DE AGUA SECUNDARIAS, FASE 2 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01000 | |||||||
| 1 | Plan de construcción | NTP+5 | |||||
| 2 | Plan de obra | NTP+5 | |||||
| SECCIÓN 01011 | |||||||
| 3 | Programa de avance de obras | 4 | NTP+5 | ||||
| 4 | Plan de movilización | 4 | NTP+5 | ||||
| 5 | Plan de control de calidad | 4 | NTP+5 | ||||
| 6 | Gestión de residuos y escombros | 4 | Inspección final | ||||
| 7 | Planos As-Builts | 4 | IF+15 | ||||
| 8 | Datos espaciales | 4 | IF+15 | ||||
| 9 | Listado de personal | 4 | NTP+5 | ||||
| 10 | Plan de seguridad | 4 | NTP+5 | ||||
| 11 | Carta de garantía | 4 | IF+30 | ||||
| SECCIÓN 03 30 00 | |||||||
| 12 | Central de fabricación | 4 | |||||
| 13 | Programa de ensayos de control del hormigón | 4 | |||||
| 14 | Resultado de los ensayos de control del hormigón | 4 | |||||
| 15 | Plano de montaje de feralla | 4 | |||||
| SECCIÓN 09 90 00 | |||||||
| 16 | Cada tipo de recubrimiento y/o producto suministrado | 4 | |||||
| SECCIÓN 22 00 00 | |||||||
| 17 | Tubos de polietileno de alta densidad PE100 | 4 | 4 | ||||
| 18 | Accesorios de conexión para tuberías de polietileno | 4 | 4 | ||||
| 19 | Tubería de acero galvanizado DIN 2440 | 4 | |||||
| 20 | Hidrante contraincendios enrasado | 4 | |||||
| 21 | Válvula de compuerta | 4 | |||||
| 22 | Ventosa | 4 | |||||
| 23 | T de conexión con bridas | 4 | |||||
| 24 | Brida y manguito universal | 4 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N
File details come from the government source that posted it. Updated .