Questions and Answers Amendment 02.pdf
PDF 81 KB Posted
- Attached to
- Fiber Cable Duct Survey Federal contract opportunity
- Solicitation number
- FA557020Q0010
About this file
This document contains an amendment with technical responses to questions regarding solicitation number FA557020Q0010 for a fiber cable duct survey. The solicitation requires professional services to update a Cyberspace Infrastructure Planning System with outside plant telecommunications infrastructure information for RAF Molesworth, UK. Services include collecting location data for manholes, handholes, pedestals and building entries using GPS, inspecting enclosures, tagging cables, and entering attribute and cable data into the CVC system. Progress demonstrations are required to produce reports and drawings from the CVC to verify accuracy and completeness of updated information. Space may be available on base for contractor equipment storage if needed. Three Information Transfer Nodes are included. Enclosures average eight feet deep. New field data collected during the survey must be loaded into the CVC rather than modifying existing GIS data. No known local confined space procedures exceed OSHA requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - FA557020Q0010.pdf | ||
| Questions and Answers Amendment 01.pdf | ||
| DRAFT Combo - FA557020Q0010.pdf | ||
| Attachment 1 PWS for CVC Survey.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 01 ‐ Technical Responses in red.
Questions regarding solicitation FA557020Q0010, Fiber Cable Duct Survey – Amendment 01
1. Question: Page 30 of the solicitation states that the quote will consist of Technical and Price.
The instructions then mention a Quality Control Plan. Is any technical content required/desired other than a Quality Control plan? Technical content should include the Offeror’s plan for tackling project as well as their documentation methods, specifically how the data will be collected.
2. Question: Will the contractor be provided a warehouse/office space on post to store equipment? Yes, space will be available if need be for contractors.
3. Questions: How many switch nodes are included? Three Information Transfer Nodes (ITNS) are included.
4. Question: Approximately how deep is the average communications container? Eight Feet.
5. Question: We understand that all information pertaining to the communications infrastructure within the communications containers will be entered into the CVC system and any changes to existing drawings will be noted on field drawings and submitted to the government. Is the contractor also responsible for updating CADD drawings for the infrastructure as well? CVC drawings are required.
6. Question: Will the government be providing storage space for field equipment such as GPS, pumps, harnesses, tripods etc.? Please see response to question #2.
7. Question: Are there any local Permit Required Confined Space Entry Procedures that exceed the typical OSHA requirements? There are no known local confined space entry procedures.
8. Question: Is it the government’s intent that the contractor will modify existing communications infrastructure GIS data to be loaded into the CVC system? Or will new vector features need to be created based on field survey recordings? New field data during the survey will need to be collected.