Attachment 1 PWS for CVC Survey.pdf

PDF 3 MB Posted

Attached to
Fiber Cable Duct Survey Federal contract opportunity
Solicitation number
FA557020Q0010
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This performance work statement outlines requirements for geospatial survey and data collection services for fiber optic cables at RAF Molesworth, UK. The contractor shall update the Cyberspace Infrastructure Planning System Visualization Component with outside plant telecommunications infrastructure information from RAF Molesworth by conducting GPS surveys of manholes, handholes, pedestals, and building entry terminals. The contractor must demonstrate accurate data entry into the CVC through progress demonstrations at 35%, 65%, and 100% completion. Services include field inspections, cable tagging, and documentation. The government will provide existing outside plant records and computer workstation access. The contractor must notify the government of any discrepancies and complete demonstrations within specified timeframes. This opportunity is issued by the 501st Regional Contracting Office at RAF Alconbury on behalf of the Department of the Air Force United States Air Forces in Europe - Air Forces Africa for RAF Molesworth.

View the file

Other files for this federal contract opportunity

Other files attached to Fiber Cable Duct Survey, newest first.
File Type Posted
Questions and Answers Amendment 02.pdf PDF
Combo - FA557020Q0010.pdf PDF
Questions and Answers Amendment 01.pdf PDF
DRAFT Combo - FA557020Q0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Geospatial Survey of Communications Infrastructure and

Updating Data in the Cyberspace Infrastructure Planning System Visualization Component RAF Molesworth, UK

22 January 2020

1.0 Description of Services.

1.1 Scope of Work: The contractor shall provide professional services necessary to update the Cyberspace Infrastructure Planning System (CIPS) Visualization Component (CVC) with Outside Plant telecommunications infrastructure information for RAF Molesworth, UK. The contractor shall collect and record the location of outside plant features using Global Positioning System (GPS) surveys; by entering and inspecting manholes (MH), handholes (HH), pedestals, and building entry terminals and Fiber Distribution Panels; and by tagging cable at these enclosures and entering enclosure attributes and cable data into the CVC. For reference the Government will provide existing base outside plant records (see para 5.1 of this PWS). The Contractor shall demonstrate that updated information entered into the CVC is accurate and complete by conducting progress demonstrations that include producing CVC-generated reports and drawings.

1.2 Requirements

1.2.1 Conversion of Outside Plant Records and Collected Data to CVC

1.2.1.1 Outside Plant Records Inventory: The contractor shall inventory and organize existing outside plant records and drawings. The contractor shall review and resolve drawing issues and notify the Government of apparent missing drawings or missing cable records within five (5) working days of the commencement of the work.

1.2.1.2 Access to CVC: The contractor shall use CVC which is available through the Air Force Portal on the CIPS website, to enter outside plant infrastructure information gathered from Government-provided records and the contractor’s GPS surveys and field inspections. The Contractor must create a CIPS account, submit a DD2875 with blocks 11, 18 and 31 digitally signed and request permissions from the owning organization of the installation the CVC work is to be performed. As noted above, the CVC Editor permission is needed to perform CVC work. The URL for the CIPS website is https:cipsaf.tinker.af.mil/CIPS5/.

1.2.1.2.1 CVC Training: If the Contractor requires CVC training from the CIPS Program Management Office (PMO) to perform the CVC work, the local Comm Squadron shall submit a training request using the Training Request procedures located here https://cipsaf.tinker.af.mil/User/Main/CreateRequest.

NOTE: The CIPS PMO conducts numerous training classes each year and scheduling a training class for a certain time frame cannot be guaranteed. The contractor will be responsible for cost incurred to receive the training.

1.2.1.3 List of Discrepancies/Missing Data Issues: If the contractor encounters discrepancies or missing data, this information shall submitted to the government using A001. The government has 10 days from date of receipt to respond on all discrepancies or missing data issues. If government-provided data and contractor-collected data disagree and the QAP verifies the contractor’s data is within the specified accuracy, the QAP will determine which data the contractor is to use in populating CVC. The contractor shall be responsible for finding missing data through field inspections.

Attachment 1 - Performance Work Statement Solicitation # FA5570-20-Q-0010

1.2.1.4 Preliminary Processing of Data: The contractor is allowed to use any intermediate methods to gather and to preliminarily edit, process, and record information prior to transferring the data to the CVC Viewer/Editor web-browser application, accessible at https://cipsaf.tinker.af.mil/CIPS5/.

1.2.2 GPS Survey: The contractor shall use GPS technology to locate and collect data on outside plant infrastructure features and communications pathways. Outside plant features include manholes, vaults, handholes, pedestals, underground cables, marked direct buried splices, Electronic Marker System marked direct buried splices, terminals. The communications pathways include duct routes, aerial and direct-buried cable, trench routes, communication pathway entry points on building exterior walls that lead to interior building entry terminals. The contractor shall augment the GPS survey by using conventional land surveying equipment and electronic cable locating (underground utility toning) equipment to meet requirements.

1.2.2.1 The contractor shall convert GPS data to ESRI Shape files, and transcribe the Shape file information into the CVC database. The government will provide an annotated base map that identifies features requiring survey (if available). The contractor is not required to GPS Survey commercial communication manholes and commercial comm paths or to collect and record data for the commercial manholes and commercial communication pathways. However, the contractor is required to locate and record information for any cables residing in commercial communications outside plant or any shared commercial infrastructure. The contractor is also resposible for identifying and recording cable managed by other than 423 CS, e.g. base civil engineer on communications container filed drawings and CVC.

1.2.2.2 The contractor is not required to GPS or electronically trace the path of cable or ducts not managed or shared by the 423 CS. The contractor is required to locate every communication path formed by a single duct, or by a bank of ducts, including communication paths that run parallel to one another provided there is a tracer wire or metallic conductor in the path. The contractor is not required to locate direct buried cable that cannot be traced by electronic toning. The contractor is not required to GPS survey the path of abandoned-in-place (AIP) cable. The path of AIP cable inside of manholes, vaults, handholes, and pedestals will be recorded in CVC.

1.2.2.3 GPS Accuracy Standards: The contractor shall use GPS to determine the horizontal position of communications outside plant infrastructure and communications pathways features in accordance with the Federal Geographic Data Committee (FGDC)- STD-007.4-2002. FGDC publications are downloadable from the website:

http://www.fgdc.gov/.

1.2.2.4 GPS Accuracy of Feature Locations: Each outside plant infrastructure feature and communications pathway requiring geospatial coordinates shall be located within one meter of its true ground position in the horizontal plane. Spatial accuracy confidence level as defined in FGDC-STD-007.3-1998. Geospatial coordinates for the location of manholes and cable vaults shall be recorded at the center of the manhole lid.

Geospatial coordinates for the location of handholes, pullboxes, pedestals, marked direct buried splices and Electronic Marker System marked direct buried splices shall be recorded for the top center of the feature or marker. Geospatial coordinate data for the location of communication pathway lines shall be recorded at a minimum every 25 feet and each turn or bend in a cable installation pathway must also be recorded so that the coordinates for any point along the turn pathway will fall within the allowable accuracy.

1.2.2.5 Shape Files: The GPS-collected outside plant infrastructure features and communications pathways attribute, metadata, and location information shall be converted to, stored, and submitted in an Environmental Systems Research Institute (ESRI) Shape File format. The shape files must be compatible with the current CVC web-based application. The shape files shall have a geospatial reference (.prj) file included that specifies the parameters of the coordinate system. Shape files will be provided as part of Survey Data Report within 10 working days of completing GPS Survey (A002).

1.2.2.6 GPS Data Format: The contractor shall use GPS to determine horizontal position of communication features and will format outside plant infrastructure features and communications pathways data for entry into CVC using the entity naming convention attribute fields and domain values as specified by Table A.

1.2.2.7 Data Dictionary: The contractor shall collect geospatial coordinates and attribute information on the outside plant infrastructure features and communications pathways with GPS data loggers and will use Table A to create the data dictionary for use in the data collector.

1.2.2.8 Metadata: For each set of outside plant infrastructure features and communications pathways data using GPS, the Contractor shall complete all metadata elements marked mandatory or mandatory if applicable as defined by the FGDC–STD- 001-1998. Metadata shall be formatted and stored as an XML document that is compatible with the submitted shape files Metadata will be provided as part of Survey Data Report within 10 working days of completing GPS Survey (A002).

1.2.2.9 Accuracy Worksheets: Calculation worksheets showing compliance with the National Standard for Spatial Data Accuracy (NSSDA) statement at the 95% confidence level, as required by paragraph 3.4, shall be submitted as an Excel (.xls) file (A003). Examples of the Horizontal Accuracy Statistical Worksheet are given in FGDC- STD-007.3-1998, Appendix 3-B (informative) Horizontal Accuracy Computations, Tables 1 and 2. The standard can be downloaded from the FGDC website:

http://www.fgdc.gov/.

1.2.2.10 Geospatial data: Geospatial data shall overlay on the installation’s most current GeoBase Common Installation Picture (CIP) provided in the Air Force Portal accessible CVC. The collected data will incorporate the datum and the coordinate and projection system of RAF Molesworth, UK CIP which is: World Geodetic System 1984 (WGS1984) Datum, Universal Transverse Mercator (UTM) Projection Zone 11 approximately (0.4168 degrees West), Latitude Band T (52.3818 degrees North), and unit of measure meters.

1.2.2.11 Quality Control: The contractor shall use a topology build and clean routine and shall use professional standards to ensure the outside plant infrastructure features and communications pathways data are identified and correctly documented in

CVC.

1.2.2.11.1 Submitted Shape files shall have:

a. No erroneous overshoots, undershoots, dangles or intersections in the line work;

b. features snapped where applicable (for example, GPS_Path_Segment snapped to GPS_Manhole);

c. continuous lines, with no pseudo-nodes (Nodes should only exist where the attributes of a line change);

d. no sliver polygons;

e. all polygons completely closed and have a single unique centroid; or

f. digital representation of the common boundaries for all graphic features that is coincident, regardless of feature layer.

1.2.2.11.2 CVC Editor, Workspaces and Drawings shall have annotation, line editing and graphic representation and layout comparable to any existing manhole and cable record drawings maintained by the local Comm Squadron, and shall comply with Geographic Information System and Cartographic industries professional standards.

1.2.2.11.3 Quality Control Plan: The contractor shall develop and maintain a Quality Control Plan (QCP) for all services provided under this PWS (A004).

The QCP shall remain in effect during the term of the contract. The contractor shall retain the QCP on site and make it available for Government review upon request. The contractor shall provide the QCP within 10 working days after contract award. The contractor shall provide any changes to the QCP to the Contracting Officer at least ten

(10) days prior to implementation for review and approval.

1.2.2.12 Updating GPS Data in CVC: The contractor shall enter into CVC all data collected, and communication pathway and structure GPS data provided by the 423 CS. The contractor shall precisely and accurately transfer into CVC the government-provided geospatial coordinates of GPS shape files for the communications infrastructure. Every spatial coordinate for point, line, or polygon transferred to CVC must accurately correspond to the government-provided shape file coordinates used to create the point, line, or polygon. The contractor shall store the collected and government-provided outside plant infrastructure features and communications pathways shape files in the local government-provided computer workstation, and shall use the editing “snapping” features to transcribe information from the local workstation shape file into the CVC database using the CVC Viewer/Editor web-browser application.

1.2.3 Field Inspection and Documentation of Outside Plant Facilities: The contractor shall conduct a field inspection of communication infrastructure features in the outside plant, along the communication pathways, to and from the cable demarcation terminal in each facility for the purpose of updating CVC with current, complete, and accurate information. Features to be physically inspected and documented include outside plant communication cable and the interior of manholes, handholes, vaults, pedestals, pullboxes, building entry terminals, and building entry patch panels. The paths of AIP cables inside containers will be recorded; however the contractor is not required to tone, trace, or record in CVC the path of underground or direct buried AIP cable. The contractor shall inspect and document the attributes of communications pathways and cable including the size of manholes and handholes, orientation of manholes, handholes, vaults and pedestals and including cables, splices, terminal blocks, fiber distribution panels, duct banks, ducts, and innerduct that are accessible by removing covers or by opening lids or doors in buildings or in communication enclosures. Some manhole/handhole lids may require special equipment for removal. The contractor shall pump out water and clear manholes/handholes of mud and debris as required to perform field inspection. The contractor shall document and list existing conditions and note any discrepancies or omissions between information in the government provided records and the observable properties of the communications features, cables, and appurtenances (A001). The contractor shall note cable tags and record cable attributes including size, number, count, and type. The contractor shall retag cable when tags are missing, inaccurate, or unreadable. The contractor shall replace and dispose of lead tags according to AF regulations.

1.2.3.1 Documentation of Field Inspections: The 423 CS will provide the contractor with any available electronic copies of cable and manhole drawings. For communications containers without existing drawings, the contractor shall prepare legible field drawings to record the features for each communications container including manholes, vaults, handholes, pedestals, and building entry terminals (See Example A - Communications Container Field Drawing). The Contractor shall use colored pencil to edit the field drawing. Use red pencil for additions, yellow pencil for deletions, blue pencil for remarks and notes to the CVC editor, and green pencil for inspector reminder notes. The contractor shall submit legible, colored paper, and colored electronic copies of each edited field drawing as part of the Communication Container Field Drawings (A005).

1.2.3.2 Identification and Tagging of Cables during Field Inspection: The contractor shall replace missing, inaccurate, and unreadable cable identification tags and tracer wire tags in all manholes/handholes, splices, cable vaults, pull boxes, and at building entry terminal locations. The contractor shall replace lead tags. The contractor is resposible for disposing lead tags off base. Cable known to be AIP will be tagged “AIP” with the cable size and type if tags are missing and will be noted as AIP in CVC. At manholes/handholes, place tags on the cable, approximately 2 feet from each duct entrance. Replace missing unreadable tags on duct tracer wire tagged with a label indicating it as a “Duct Tracer Wire to xxx – Do Not Remove (where xxx is the other end of the wire). Cable known to be AIP shall be tagged “AIP” if tags are missing and shall be noted as AIP in CVC. At Dial Central Office Vaults, the contractor is required to tag cables on both sides of the TIP splice (one cable runs between the TIP splice and the vertical side of the main frame. The cable on the other side of the TIP splice is the feeder cable). No tagging or data collecting is required for cable at the Main Frame. The contractor shall prepare and attach cable tags in accordance with Example B. Tags shall be printed on Avery L4775 White Heavy Duty Labels (or equivalent) using a color laser printer. Tag background shall be printed orange for copper cable and yellow for fiber cable. Tag dimensions, fastening requirements, and performance criteria are listed in Example B. Exception: For single count cable tags, the contractor shall use ACP International stock numbers VCT-200 (yellow color for fiber optic cable) and VCT-201 (orange color for copper cable) or equivalent as the backing for Avery L4775 laser printed tag labels. The single count cable labels will be attached to the backing tag material and covered with the tag’s integral self-laminating flap. The contractor shall obtain written concurrence from 423 CS/SCXP before making any modifications to cable tagging requirements.

1.2.3.3 Updating CVC with Field Inspection Information: The contractor shall use field inspection information to update the CVC database using the CVC Editor web-browser application. The contractor shall not assume any existing communication infrastructure information within CVC is either accurate or complete. The contractor may delete or edit existing communication infrastructure data contained within CVC in order to accomplish the work. All communications infrastructure features placed and modified within CVC by the contractor shall be properly and accurately attributed, positioned, sized, shaped, orientated, and labeled.

1.2.4 Demonstration of CVC Update

1.2.4.1 Demonstration Plan. The contractor shall prepare and furnish a plan for demonstrating that information recorded in Field Container Drawings and in CVC is accurate and complete for all Contractor-surveyed outside plant features and for all Government data the Contractor transfers into CVC. The purpose of each demonstration is to use CVC to validate the quality and amount of work completed, not to show Government personnel how to use CVC. Demonstrations shall be performed when the work is approximately 35 percent, 65 percent and 100 percent complete. The Contractor shall furnish all equipment and personnel required to conduct demonstrations, except equipment identified in Paragraph 3 of this PWS as Government-Furnished Property. The demonstration plan shall describe the work the Contractor plans to have completed by each demonstration step and how the Contactor is going to show the work has been completed.

1.2.4.2 Progress Demonstrations During the progress demonstration at 35 percent, 65 percent and 100 percent project completion, the Government reserves the right to perform any duplication of the Contractor performed demonstrations or to perform any CVC editing report generating, or printing actions to assure results conform to prescribed requirements for completeness, workmanship, and accuracy. The contractor shall notify the Quality Assurance Personnel (QAP) at least five working days prior to any demonstrations and shall make available all standards and criteria used to accomplish demonstrations

1.2.4.2.1 Demonstration at 35% Completion. At the 35 percent

completion the Contractor should consider having completed work to show:

a. Collected, sorted, arranged and analyzed Government provided drawings and information.

b. The Government has been notified of discrepancies and missing information in their government provided records and drawings requiring Government response.

c. The Contractor has GPS located the majority, if not all, of the

Communications Outside Plant infrastructure

d. The Contractor has started overlaying the CVC editing screen with point and line Shape file features on the government provided computer workstation

e. The Contractor has submitted GPS Accuracy Calculation worksheets (A003)

f. Shape file points and lines for (comm. path segments, manholes, pedestals, etc) in CVC are placed in the correct location.

1.2.4.2.2 Demonstration at 65% Completion. At the 65 percent

completion the Contractor should consider having completed work to show:

a. Most, if not all, of the OSP Communications infrastructure including communication containers, communication pathways and building entry terminals have been field inspected and documented with Shape files and Field Container Drawings.

b. The Government has been notified of discrepancies and missing information detected during the field inspection phase of the Contractors work requiring Government response.

c. The communication containers are properly placed, sized, shaped, and oriented in CVC.

d. The communications path segments are properly place, attributed with ducts and innerducts, and connected to containers including buildings.

e. Opening and preparing five (5) manholes randomly selected by the QAP for entry by the QAP to field check actual conditions in the manholes against information in the field container drawings (A005).

1.2.4.2.3 Demonstration at 100 percent completion. At the 100 percent completion the Contractor shall:

a. Allow two work days to conduct the demonstration.

b. Demonstrate end to end cable connectivity. For twenty (20) cables, selected by the QAP at the time of the demonstration, the Contractor shall show that, for the selected cables, the number, type, and pair or strand count, the cable run continuously (without gaps) between the point of origin and the point of final termination.

c. Complete CVC generated CSIR drawings for twenty (20) manholes selected by the QAP, at the time of the demonstration. In order for a drawing to be complete, the manhole must be properly sized and shaped, geospatially oriented and placed. In addition, the manhole must be fully populated with appropriate cables, splices, duct bank placement and layout, and equipment and junction device information. Without editing, at the time of demonstration, of the cable or strand attributes, the twenty (20) Manhole CSIR drawings must show properly aligned and spaced cables. Tagging and annotated of cable will be done during the demonstration.

d. Have properly accounted for and attributed all dead pairs or strands on cables within CVC and in shown demonstration the field container drawings.

e. Have color copies of all communication container field drawings available at the 100 percent demonstration for the QAP to cross check any field drawing against information contained within CVC (A005) and for the QAP to field check actual conditions in the manholes against information in the field container drawings

f. Have paper copies of current CVC reports for No connection on Splice, Sheath Disconnect, and Sheath Overload at the demonstration for the QA to review.

g. Have corrected all errors show in the most current of any of the CVC reports.

h. Open and prepare five (5) manholes randomly selected by the QAP for entry by the QAP to field check actual conditions in the manholes against information in the field container drawings (A005).

1.2.4.3 Demonstration Reports: The contractor shall record all demonstrations as they are accomplished and make all CVC produced manhole and cable diagram drawings, cable reports and results available to the 423 CS QAP for review as demonstrations are completed (A006). The contractor is not required to make cable diagrams and manhole racking diagrams for the entirety of RAF Molesworth, only to demonstrate that data in CVC is accurate and complete enough to create these records at any location on the base. The contractor is required to perform drawing to CVC conversion, GPS Services, Feature Inspections, and data entries to demonstrate that the requirements have been met.

1.2.5 Deliverables

1.2.5.1 Site Acceptance and Approval Criteria: All deliverables are subject to

Government acceptance and approval. They shall meet professional standards and the requirements set forth in the basic contract and this PWS. Documentation will be in accordance with the CDRL declaration. Contractor format is acceptable (except where noted). All deliverables shall be produced using recommended software tools/versions as accepted by the Government.

Deliverables

CDRL DID Data Item Title

A001 DI-MISC-80508B

Technical Report – Studies/Services (List of Discrepancies and Missing Data Issues)

A002 DI-MISC-80508B Technical Report – Studies/Services (Survey Data Report)

A003 DI-MISC-80508B Technical Report – Studies/Services (Accuracy Worksheet)

A004 DI-MGMT-81117 Technical management and Work Plan (Quality Control Plan)

A005 DI-MISC-80508B

Communications-Computer Systems Installation Records (CSIRs) (Communications Container Field Drawing

A006 DI-MISC-80508B Technical Report – Studies/Services (Demonstration Report)

A007 DI-MISC-80368A Status Report (IPT Minutes)

A008 DI-MISC-80368A Status Report (Weekly Status Report)

A009 DI-MISC-80368A Status Report (Outbrief Synopsis)

1.2.5.2 Distribution List:The Contractor shall deliver the required numbers and type of copies IAW the distribution list set forth below.

DOCUMENTS 422 CS/SCXP 38 ES TBD TBD

CDRL A001 *1 EM *WD *1 EM *WD 1 EM *WD N/A

CDRL A002

*1 CD

*1 CD N/A *1 CD

CDRL A003

*1 CD*1PC

*1 CD*1PC N/A *1 CD

CDRL A004 *1EM*WD *1EM*WD

CDRL A005

Colored paper copies of each Communications Container Field Drawing and 1 CD of colored electronic copies in Adobe PDF format of each Field Drawing

CDRL A006 *1 CD, *1 PC *1 CD, 1 CD *1PC N/A

CDRL A007 *1 EM per attendee *1 EM per attendee

*1 EM per attendee

N/A

CDRL A008 *1EM, *WD to Member on IPT

*1EM, *WD

to Member on IPT

#1EM, *WD

to Member on

IPT

N/A

CDRL A009 *EM, *WD *EM, *WD *EM, *WD N/A

*CD = Compact Disc *PC = Paper Copy *EM=Email WD=Word doc. Attachment

1.2.6 Warranty Criteria: The contractor shall provide warranty for workmanship deficiencies in surveying, tagging and CVC data input. Warranty period shall begin upon site acceptance (reference paragraph 1.2.5.1 of this PWS). The contractor shall provide warranty for workmanship deficiencies for a period of one (1) calendar year. The contractor shall provide written procedures and required information (24/7 contact number) for sustainment and warranty services prior to cutover in the site acceptance form or as an attachment to the site acceptance form. This information shall include, but is not limited to, written confirmation of the warranty period and phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty cards/equipment. The contractor shall notify the 423 CS QAP ninety (90) days prior to warranty expiration.

1.2.7 Hours of Work: The contractor shall work during normal operating hours of 8:00

AM – 4:30 PM, Monday through Friday, excluding federal holidays. The Contractor will be allowed to work after hours and weekends if the work being performed does not require an escort.

2. Services Summary (SS): The SS lists the PWS performance objectives that the Government will monitor. The absence of any PWS requirements from the SS will not detract from its enforceability nor limit the rights or remedies of the government. The SS sets forth the maximum allowable deviation from the standard of performance for that service.

Performance Objective PWS Para Performance Threshold Progress Demonstrations-- During the progress demonstration at 35 percent, 65 percent and 100 percent work completion.

1.2.4.2 a. QAP accepts 35% progress demonstration within 60 calendar days of contract award

b. QAP accepts 65% progress demonstration within 120 calendar days of contract award

c. QAP accepts 100% progress demonstration within 180 calendar days of contract award Final demonstration must show 100% end-to-end connectivity, for all cables in the outside plant and, for twenty randomly selected manholes, the CVC generated CSIR drawings must show properly aligned and spaced cables that are fully tagged and annotated with the correct cable designation, cable conductor or strand size, cable count, and cable name or number

Demonstration Report-- Reports of demonstrations of the CVC updates at the 35 percent, 65 percent, and 100 percent completion points.

1.2.4.3 Provided to the QAP within 10 calendar

days of completing the demonstrations

3. Government Furnished Property and Equipment

3.1 Government-Furnished Property (GFP)

3.1.1 Office Workspace and Computer Workstation: The government will provide office workspace and a government-configured computer, with a CAC reader, and access to CVC over the NIPRNet for the duration of the contract period.

3.1.2 Color Printer: The government will provide access to a color printer, but the contractor must supply the paper and toner/ink.

3.2 Government Provided Escorts: The contractor will require government escorts in specified areas and buildings. At least six (6) weeks before access to these areas is required, the contractor shall provide a work schedule that identifies approximate dates they will need to work in these areas. The contractor shall coordinate with the local Comm Squadron for final escort arrangements at least 72 hours before access is required.

3.3 Applicable Documents and Standards. The following documents are hereby incorporated by reference. The contractor shall comply with these standards during the performance of the contract requirements.

ANSI/TIA/EIA-606-A Administration Standard for Commercial Telecommunication Standard

FGDC-STD-001-1998 - Content Standard for Digital Geospatial Metadata

FGDC-STD-007.3-1998 - Geospatial Positioning Accuracy Standards Part 3: National Standard for Spatial Data Accuracy

FGDC-STD-007.4-2002 - Geospatial Positioning Accuracy Standards Part 4: Standards for Architecture, Engineering, Construction (A/E/C) and Facilities Management

OSHA CFR 29 Part 1910.146 – Permit-Required Confined Spaces

The Contractor shall obtain and comply with any other applicable manuals not identified above that would be required to meet industry standards.

4.0 General Information

4.1 Administrative

4.1.1 Integrated Product Team (IPT): The contractor shall chair weekly IPT meetings as required. The contractor shall provide a worldwide “Meet Me” telecon capability for the duration of the project. The purpose of this meeting is to discuss project progress, problems being encountered, and other discussions necessary/beneficial to ensure success and timely completion of the contract requirements. The contractor shall record meeting minutes and distribute them within two workdays via e-mail to each attendee (A007).

4.1.2 Weekly Status Reports: The contractor shall prepare a Weekly Status Report during the course of performing the work (A008). The purpose of the report is to inform IPT members of project progress, problems being encountered, and other topics necessary/beneficial to ensure success and timely completion of the contract requirements. The Status Report and meeting minutes may be combined as long as the resulting report contains all the required elements and contains sufficient detail to serve as a project record.

4.1.3 Return of Government Property and Outbrief

4.1.3.1 Return of Government property: Prior to the outbrief, the contractor shall return all government equipment and government ID cards issued to contractor personnel for the performance of this contract.

4.1.3.2 Outbrief: The contractor shall conduct an outbrief with the QAP or designated representative and other site personnel at the conclusion of the CVC update.

The site survey outbrief shall inform the QAP of CVC update results and maintenance issues. At the conclusion of the outbrief, the contractor shall provide the QAP a written synopsis of the CVC Update which includes major issues or action items and a list of attendees (A009). A copy of this synopsis shall be forwarded to the Contracting Officer within two workdays of the outbrief.

4.2 Contractor Personnel

4.2.1 Project Manager: The contractor shall provide a Project Manager (PM) and alternate(s) responsible for contract performance and continuity. The contractor shall identify the Project Manager’s or his/her alternate's range of authority to act for the Contractor relating to daily contract operation.

4.2.2 Site Point of Contact (POC): The Contractor shall designate an on-site team leader and alternate(s) as the Site POC for this project in their proposal. The Site POC or alternate(s) shall be on site during duty hours until project completion. The Site POC shall be the interface for all work site communications with the government, including quality, safety, and discrepancy matters.

4.3 Security: All contractor personnel shall comply with established security procedures for entering an installation and its facilities, including special security procedures for entry to restricted or controlled areas. The contractor shall obtain necessary badges or documents required for entry to restricted or controlled areas, if applicable, to meet the requirements of this document. The contractor shall coordinate with the 423 CS/SCXP to obtain and return temporary badges and vehicle registrations.

Contractors working under this PWS, as a minimum, shall have a favorable National Agency Check.

However, if the proposed solution requires a need for access to Government system(s) requiring a higher security level, the Contractor shall ensure personnel have the proper security requirements at no additional cost to the Government. See paragraph 3.2 of this document for escort information.

4.3.2 Base Passes/Contractor Badges/CACs: The contractor shall acquire all necessary base passes for its personnel. The contractor is required to provide identification badges to their employees. All contractor personnel must wear these badges while performing work. Badges are required to identify the individual, company name, and be clearly and distinctly marked as Contractor. Size, color, style, etc, are to be mutually agreed upon by the contractor and government. The government will provide a Common Access Card (CAC) to contractor personnel who require access to a government computer.

4.3.3 Signs on Contractor’s Vehicles: The contractor shall have signs displaying the contractor’s company name on all company and employee vehicles operated on the Base.

4.4 Safety

4.4.1 General Safety: The contractor shall comply with all local, state and federal safety guidelines, including OSHA practices and procedures to protect employees from the hazards of entry into permit-required confined spaces.

4.4.2 Manhole Conditions and Safety: Permits are required for access to manholes. The

423 CS will obtain permits within 3 working days of the Contractor’s request to access a manhole (if required). Water from manholes shall be pumped into the base sewer system unless it is not available. Then it may be pumped out onto the surrounding ground surface as long there is no impact to roads, driveways or vehicle traffic. There are no known contaminates within any manholes.

5.0 APPENDICES

5.1 Estimated Quantities of Outside Plant Features and CSIR Drawings.

5.1.1 Quantities of Outside Plant Features: Estimated quantities of features in the telecommunications outside plant infrastructure for RAF Molesworth, UK are:

Manholes 95 each Handholes 62 each Pedestals 4 each Building Entry Terminals 75 each Ductbanks and duct 44,000 LF Direct-buried cable (All outside plant communications cable of various types)

4,000 LF

Missing or to change cable tags >400 each Lead cable tags to be removed None

6.0 TABLES.

TABLE A

Entities, Attributes, and Domain Values for Recording Required

Communication Feature Data

(BASIC COMM PATH TEMPLATE)

A.1 Feature Attributes for Comm-Path Entities.

A.1.1 GPS_MANHOLE

A.1.1.1 Definition. An enclosed structure (manhole, handhole and pullbox). A butterfly layout is used that shows the floor and walls flattened out so that duct openings can be drawn on the walls. This must be represented as one polygon (one row in the table). The point is used to show the center of the manhole/handhole cover.

A.1.1.2 Geometry type. Site (Point).

A.1.1.3 Attributes.

Column Name

SDSFIE

Common Name

Description Data Type

Use Domain Table

NAME Identifier Name

The standard identifier name (e.g. MH-19).

Char(20) Required

MAPSRC_D Map Source Discriminator

DISCRIMINATOR - Used to indicate the source of data for the spatial position of this graphic.

Char(16) Required D_DATSRC

MAPACU Spatial Accuracy in Meters

Describes the spatial accuracy of mapsrc_d. in meters, +/- of where the feature may actually

be. For example, if you are using GPS and it’s only accurate to 1 meter, put a 1 in this field.

Real Required

A.1.2 GPS_VAULT

A.1.2.1 Definition. An enclosed structure in a facility, in which the outside plant cables are spliced to the tipping cables

A.1.2.2 Geometry type. Site (Point).

A.1.2.3 Attributes.

Column Name

SDSFIE

Common Name

Description Data Type

Use Domain Table

NAME Identifier Name

The standard identifier name (i.e. V-19).

Char(20) Required

MAPSRC_D Map Source Discriminator

DISCRIMINATOR - Used to indicate the source of data for the spatial position of this graphic.

Char(16) Required D_DATSRC

MAPACU Spatial Accuracy in Meters

Describes the spatial accuracy of mapsrc_d. in meters, +/- of where the feature may actually

be. For example, if you are using GPS and it’s only accurate to 1 meter, put a 1 in this field.

A.1.3 GPS_GENERAL_CONTAINER

A.1.3.1 Definition. An aboveground, enclosed structure that provides access to buried plant and a place to house splices, terminals, etc.

A.1.3.2 Geometry type. Site (Point).

A.1.3.3 Attributes.

Column Name

SDSFIE

Common Name

Description Data Type

Use Domain Table

NAME Identifier Name

The standard identifier name (i.e. PED-19).

Char(20) Required

TYPE_D Type Code A description for the type of General Container.

Char(16) Required D_COPED

MODEL_NO The model number of the General Container.

Char(16) Required

TERMINAL_D Terminal Existence Code

A Boolean indicating the presence of a terminal (Y/N).

Char(16) Recommended D_BOOLEN

Column Name

SDSFIE

Common Name

Description Data Type

Use Domain Table

BONDED_D Bonded Code A Boolean indicating whether the General Container is bonded.

(Y/N).

Char(16) Recommended D_BOOLEN

MAPSRC_D Map Source Discriminator

DISCRIMINATOR -

Used to indicate the source of data for the spatial position of this graphic.

Char(16) Required D_DATSRC

MAPACU Spatial Accuracy in Meters

Describes the spatial accuracy of mapsrc_d. in meters, +/- of where the feature may actually be.

For example, if you are using GPS and it’s only accurate to 1 meter, put a 1 in this field.

A.1.4 GPS_DBSPLICE

A.1.4.1 Definition. An enclosed structure that represents a splice case (aerial or buried).

A.1.4.2 Geometry type. Site (Point).

A.1.4.3 Attributes.

Column Name

SDSFIE

Common Name

Description Data Type

Use Domain Table

NAME Identifier Name

The standard identifier name (e.g. DBS01.1-1200_1-900).

Char(20) Required

CAS_MAT_D Case Material Code

Used to describe the material composition of the splice case.

Char(16) Required for aerial splices and exposed DB splices

D_SPCMAT

CAS_TYP_D Case Type Code

Used to describe the type of splice case.

Char(16) Required for aerial splices and exposed DB splices

D_SPCCAS

MAPSRC_D Map Source Discriminator

DISCRIMINATOR - Used to indicate the source of data for the spatial position of this graphic.

Char(16) Required D_DATSRC

MAPACU Spatial Accuracy in Meters

Describes the spatial accuracy of mapsrc_d. in meters, +/- of where the feature may actually be. For example, if you are using GPS and it’s only accurate to 1 meter, put a 1 in this field.

A.1.5 GPS_PATH_SEGMENT

A.1.5.1 Definition. Link that represents an enclosure path of comm items outside of a building, manhole, General Container, or other enclosed structure. For ductbanks, comm-path segment can represent the virtual path, ductbank, duct, and innerducts. For ducts, comm-path segment can represent the virtual path, duct, and innerducts. For direct-buried cables at road-crossings, comm-path segment can represent the virtual path, road-crossing duct, and direct-buried cables. It can also represent the path of aerial cable, cable-bridges, and cable-troughs.

A.1.5.2 Geometry type. Polyline.

A.1.5.3 Attributes.

‘Column Name

SDSFIE

Common Name

Description Data Type

Use Domain Table

PATH_TYP_D Comm-Path Type Code

A discriminator field that describes what type of communications path this segment is representing.

Char(16) Required D_COPTHT

MAPSRC_D Map Source Discriminator

DISCRIMINATOR - Used to indicate the source of data for the spatial position of this graphic.

Char(16) Required

MAPACU Spatial Accuracy in Meters

Describes the spatial accuracy of mapsrc_d. in meters, +/- of where the feature may actually

be. For example, if you are using GPS and it’s only accurate to 1 meter, put a 1 in this field.

Real Required D_DATSRC

A.2 Domain Values for Attributes of Comm-Path Feature Entities.

A2.1 D_BOOLEN: type list.

A.2.1.1 What it does. A table of Boolean data types YES and NO. Use for selecting the existence or non-existence of a value, condition, or feature.

A.2.1.2 Referenced by: GPS_GENERAL_CONTAINER

A.2.1.3 Attributes.

Lookup Value Long Description YES The condition is true or the feature does exist NO The condition is not true or the feature does not exist

A.2.2 D_COPED: communications – General Container type.

A.2.2.1 What it does. This table contains information about various communications pedestal types.

A.2.2.2 Referenced by: GPS_GENERAL_CONTAINER.

A.2.2.3 Attributes.

Lookup Value Long Description BD BD - Buried Distribution Closure, size unknown

BOX

BOX - Rectangular box type enclosure, accessed by removing a cover panel

CAB CAB - Cabinet enclosure, accessed through a hinged door CAD CAD - Controlled Access Distribution Closure PED4 4 inch pedestal PED6 6 inch pedestal PED8 8 inch pedestal PED12 12 inch pedestal OTHER Other

TBD To Be Determined UNKNOWN Unknown

A.2.3 D_COPTHT: communications - comm path type.

A.2.3.1 What it does. This table contains information about various communications path types.

A.2.3.2 Referenced by: GPS_PATH_SEGMENT.

A.2.3.3 Attributes.

Lookup Value Long Description AERIAL Above ground path between, poles, towers or buildings CABLE_BRIDGE Bridge only used for cables CABLE_TROUGH Pathway on top of ground for cables

DIRECT_BURIED Below ground path where soil has direct contact with cable DUCT Single communications duct DUCTBANK A container for multiple ducts STUB-OUT Short duct used with manholes and vaults SURFACE Path directly on the surface UNDER_ROAD A duct for cables, usually under a road UNKNOWN Faulty Source Data

A.2.4 D_COSTRM: structure – material.

A.2.4.1 What it does. This table contains information about various structure materials.

A.2.4.2 Referenced by: GPS_MANHOLE, GPS_VAULT.

A.2.4.3 Attributes.

Lookup Value Long Description AL Aluminum CIS Concrete Cast inSitu/Cast in Place COMBINATION Combination of materials FIBERGLASS Fiberglass PLASTIC Plastic PRECAST Pre-Cast Concrete STEEL Steel

MASONRY Made from bricks, clay tiles, or block.

A.2.5 D_DATSRC: source list – data.

A.2.5.1 What it does. Allowable input values for data sources.

A.2.5.2 Referenced by: GPS_DBSPLICE, GPS_MANHOLE, GPS_PATH_SEGMENT, GPS_GENERAL_CONTAINER, GPS_VAULT.

A.2.5.3. Attributes.

Lookup Value Long Description AS_BUILT As-built drawings FLDLOC_SURVEY Field location survey GPS_FLDLOC GPS field located and verified data

A.2.6 D_MHTYP: type list - comm manhole.

A.2.6.1 What it does. The type of manhole.

A.2.6.2 Referenced by: GPS_MANHOLE.

A.2.6.3 Attributes.

Lookup Value Long Description 1T1 1T1 4T1 4T1 5T1 5T1 6T1 6T1 6T2 6T2 8T1 8T1 A A Type CEMH Controlled Environment Manhole HH_Type_A Handhole Type A J3 J3 Manhole J4 J4 Manhole JC9C JC9C (2450mm x 1750mm x 1450mm) L L Manhole R2A R2A Manhole T T Manhole V V Manhole OTHER Other

A.2.7 D_SPCCAS: communications - splice case typ

A.2.7.1 What it does. Allowable values for the type of splice case

A.2.7.2 Referenced by: GPS_DBSPLICE

A.2.7.3 Attributes.

Lookup Value Long Description 12.5x28SS 12.5 Inch Stainless Steel 12.5x38SS 12.5 Inch Stainless Steel 12.5x45SS 12.5 Inch Stainless Steel 12.5x65SS 12.5 Inch Stainless Steel 2 TYPE 2 Type 2BB 2 Inch Better Buried 3BB 3 Inch Better Buried 4BB 4 Inch Better Buried 4x25.8RS 4 Inch ReddiSeal 4x25SS 4 Inch Stainless Steel 6BB 6 Inch Better Buried 5BB 5 Inch Better Buried 6BB 5 Inch Better Buried 7BB 7 Inch Better Buried 6.5x28.4RS 6.5 Inch ReddiSeal 6.5x38.5RS 6.5 Inch ReddiSeal 6.5x22SS 6.5 Inch Stainless Steel

6.5x28SS 6.5 Inch Stainless Steel 9BB 9 Inch Better Buried 9.5x28.4RS 9.5 Inch ReddiSeal 9.5x38.5RS 9.5 Inch ReddiSeal 9.5x28SS 9.5 Inch Stainless Steel 9.5x38SS 9.5 Inch Stainless Steel 9.5x45SS 9.5 Inch Stainless Steel 9.5x53SS 9.5 Inch Stainless Steel 2178-LS 3M™ Series 2178-LS FO-Splice case 2179-CS 3M™ Series 2179-CS FO-Splice case COR Corning Fiber optic splice closure FOSC_100_B_H Raychem FOSC-100 B/H HS Heat Shrink KBV K&B Vault LEAD Lead OTHER Other READY_ACCESS Ready Access UC_6_9 Siemens UC 6-9 UCN_7_10 Siemens UCN 7-10

A.2.8 D_SPCMAT: communications - splice case mat

A.2.8.1 What it does. Allowable input values for the material of the communications splice case

A.2.8.2 Referenced by: GPS_DBSPLICE

A.2.8.3 Attributes.

Lookup Value Long Description AL Aluminum EVA Ethylene Vinyl Acetate (Heat Shrinkable Tubing) FIBER Fiberglass

LEAD LEAD

PE PE - Polyethylene PP PP - Polypropylene PVC PVC - Polyvinyl Chloride SS SS - Stainless Steel OTHER Other

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

EXAMPLE A – COMMUNICATIONS CONTAINER FIELD DRAWING

Project FA-8776-09-D-002 Date 20 Jan 2011

Location ABC AFB, Yz Recorded By_Joe Young

Container Name MH-3 Bonded Yes_X__No______Alarm Yes___No X Size L 12 ft 6 ft D 6ft Grd.Rod Yes X No___Lid RND X___RET_____ Drainage Type None Duct Plugs Yes___No X Lid Size 30 Inch X Round Lock Present Yes___No X Ladder Yes___No X Lid Material: ( )Concrete ( X ) Steel

Lid Removal Requires Power Equipment Yes__ No X Container Material: Concrete Disposition ( X ) In Service,( ) Abandoned, ( ) Collapsed, ( ) Temporary,( ) Blocked,( ) Plugged, ( ) To Be Determined (TBD), ( ) Unknown Notes__Manhole buried, difficult to find.

EXAMPLE B – SPECIFICATIONS AND DETAILS FOR CABLE IDENTIFICATION TAGS

TWISTED PAIR CABLE

TAGS

DESCRIPTION OF TAG NOMENCLATURE

CVC EDITOR

ADD NEW CABLE

SHEATH SELECTION

Goto TAB

DESIGNATION

CVC CABLE TAG

SEE NOTES BELOW FOR DESIGNATION

OF TWISTED PAIR CABLE TYPES

TYPE OF OUTER PROTECTION

FOR CABLE.

NUMBER OF CABLE PAIRS IN CABLE,

FOR 100 PAIR CABLES AND UP, DO

NOT INCLUDE “00’S” WHEN LABELING

CABLES.

FOR 24 PAIR CABLES AND LESS USE

AN “X” FOR 25 PAIR CABLES AND UP

USE A “-“.

CABLE GAUGE

TYPE OF CONDUCTOR PROTECTION

CABLE NUMBER

CABLE COUNT

A “+ ALPHA” TO IDENTIFY DEAD

PAIRS

DEAD PAIR COUNT

TWISTED PAIR

FIBER OPTIC CABLE

TAG

ADD NEW CABLE

SHEATH SELECTION

Goto TAB CABLE

OR

OF FIBER OPTIC CABLE TYPES

“A” IF ARMORED, “F” IF FLAME RETARDANT

NUMBER OF FIBERS IN CABLE SHEATH

SHEATH STRUCTURE/TYPE DESIGNATORS

“C” CENTER SUPPORT

“L” LOOSE TUBE

“T” TIGHT TUBE

“B” BLOWN FIBER

“R” RIBBON

CORE OR CLADDING DIAMETER MICRONS)

8.3 CORE FOR SINGLE MODE*

50 OR 62.5 CORE FOR MULTIMODE**

200 CORE

125 CLADDING

140 CLADDING

FILLED, OTHERWISE BLANK

LOCALLY ASSIGNED CABLE NUMBER

“1242/678” FROM/TO BUILDING NUMBERS

COMPLEMENT COUNT

FIBER OPTIC

FO1242/678,1-12

FO1242/688,1-12

FO1242/702,1-12

FO1242/744,1-12

COAXIAL CABLE (SERVICE

TO ATCALS EQUIPMENT)

TAG

ADD NEW CABLE

SHEATH

SELECTION

CVC Goto TAB

OF COAXIAL CABLE TYPES

COXIAL CABLE

“-AIR”, AIR DIELECTRIC

“-FF” FOAM DIELECTRIC

“-FIGURE 8”, FOAM SELF-SUPPORT/FIGURE 8

“-QUAD” , QUAD FOAM DIELECTRIC

“-SOLID” , SOLID DIELECTRIC

“-TWINAX” , TWINAX DIELECTRIC

DESIGNATOR OF METEROROLOGICAL OR ATC

EQUIPMENT TRANMITTING SIGNAL.

COMMON NAME OF COAXIAL CABLE TYPE

CABLE NUMBER

COAXIAL

AN GPN-20 [RG216, #4]

FIBER OPTIC/TWISTED

PAIR CABLE TAG

ADD NEW CABLE

SHEATH SELECTION

OF FIBER OPTIC/TWISTED PAIR CABLE TYPES. (ALSO, REFER

TO INDIVIDUAL DESCRIPTIONS FOR FIBER OPTIC AND TWISTED

PAIR CABLES)

SHEATH STRUCTURE/TYPE DESIGNATORS

CORE OR CLADDING DIAMETER (MICRONS)

NUMBER OF TWP IN CABLE SHEATH

TWP GAUGE

FIBER OPTIC CABLE DESIGNATOR

LOCALLY ASSIGNED CABLE NUMBER

COMPLEMENT COUNT

TWP DESIGNATOR AND CABLE NUMBER

NUMBER OF PAIRS IN THE TWP CABLE

FIBER OPTIC /TWISTED

PAIR

CA04

F0, 10/634

FIBER OPTIC/COAXIAL

CABLE TAG

CABLE TAG DESIGNATION

OF FIBER OPTIC/TWISTED PAIR CABLE TYPES.

(ALSO, REFER TO INDIVIDUAL DESCRIPTIONS

FOR FIBER OPTIC AND COAXIAL CABLES)

NUMBER OF FIBERS IN

CABLE SHEATH

SHEATH STRUCTURE/TYPE

DESIGNATORS

CORE OR CLADDING DIAMETER

(MICRONS)

COAXIAL DESIGNATOR

MIL TYPE OF COAXIAL CABLE

FIBER OPTIC CABLE

DESIGNATOR

LOCALLY ASSIGNED

CABLE NUMBER

NUMBER OF FIBERS IN CABLE

SHEATH COMPLEMENT COUNT

FIBER OPTIC/COAXIAL

RG-177U/FO, 167/765

TWISTED PAIR/COAXIAL

CABLE TAG

CVC Goto TAB CABLE

OF TWISTED PAIR/COAXIAL CABLE TYPES

TYPE OF OUTER PROTECTION

FOR CABLE.

NUMBER OF CABLE PAIRS IN

CABLE

CABLE GAUGE

TYPE OF CONDUCTOR

PROTECTION

COAXIAL CABLE DESIGNATOR

FOR COMBINATION CABLE

TWP CABLE NUMBER

TWP CABLE COUNT

EQUIPMENT SERVED BY COAXIAL CABLE

TYPE OF COAXIAL CABLE

TWISTED

PAIR/COAXIAL

CA06/AN GPN-20 [RG-216]

SPECIAL OSP CABLE

TYPES-TAGS

ADD NEW CABLE

SHEATH SELECTION

FROM EXAMPLES IN

STANDARD SYMBOLS FOR

TELEPHONE OUTSIDE

PLANT DRAWINGS

ENGINEERING DATA,

SKETCH 1, SHEET 1

OF SPECIALTYPES OF CABLE

2-19 +8C16 200 PAIR LEAD SHEATH, 19 GAUGE PLUS 8

CONDUCTOR 16 GAUGE

(2) 124 OHM CCTV…TWO 124 OHM CLOSED CIRCUIT TV

CABLES

PAIRS 1-25 LOADED H-88 LOADING

PAIRS 26-100 NOT LOADED

VIDEO PAIRED CABLE, 50 PAIR #22 GAUGE PLUS 6 PAIRS #16

GAUGE

UNKNOWN OR AIP

2-19 + 8C16

(2) 124 OHM CCTV

VCP

SPECIAL OSP CABLE

FROM EXAMPLES IN

STANDARD SYMBOLS FOR

TELEPHONE OUTSIDE

PLANT DRAWINGS

ENGINEERING DATA,

SKETCH 1, SHEET 1

OF SPECIALTYPES OF CABLE

SINGLE PLASTIC SHEATH, 52PAIR, SCREEN (FOR CARRIER

APPLICATION, PLASTIC INSULATED , FILLED

72 QUAD 19 GAUGE SUBMARINE

(2)-RG-177/U TWO RG-177/U COAXIAL CABLES

COAXIAL

P52-S22PF

Unknown or AIP

SUBM72QD-19

(2)-RG-177/U

ATCALS OSP CABLE

ADD NEW CABLE

SHEATH SELECTION

Goto TAB DESIGNATION

CVC CABLE TAG

DESIGNATION

FROM EXAMPLES IN

38MSS Guide to CSIR Drawing Record Maintenance distributed 28 May 97

OF ATCALS CABLE(METEOROLOGICAL AND ATC

CABLES)

NUMBER OF CONDUCTORS AND WIRE GAUGE

FOLLOWED BY THE EQUIPMENT THE CABLE SERVES.

12C12 AN/TRN-6 TACAN

7.0 ATTACHMENT 1