Q A_Responses.pdf

PDF 7 KB Posted

Attached to
Uninterruptable Power Supply (UPS) Maintenance Federal contract opportunity
Solicitation number
FA5270-15-T-0003
Issued by
Department of the Air Force Pacific Air Forces

About this file

Q A Responses

View the file

Other files for this federal contract opportunity

Other files attached to Uninterruptable Power Supply (UPS) Maintenance, newest first.
File Type Posted
FA5270-15-T-0003_0002.pdf PDF
UPS_Status.pdf PDF
FA5270-15-T-0003_0001.pdf PDF
Attachment_5____Past_Present_Performance_Form.pdf PDF
FA5270-15-T-0003.pdf PDF
Attachment_3_-_Question_Form.pdf PDF
Attachment_4_-_Past_and_Present_Performance_Questionaire.pdf PDF
Attachment_1_PWS_UPS_MX_.pdf PDF
Attachment_6_Site_Visit_Reservation_Form.pdf PDF
Attachment_2_UPS_pricing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Responses

1. Q: There is a statement "The contractor shall be qualified". Does the contactor needed to be qualified or authorized from each manufacture?

A: - Yes, the contractors need to be qualified or authorized by their manufacture.

2. Q: Which UPS are under manufacture's warranty and when is the warranty expiration?

A: All UPS located in ITNs, expired

3. Q: Are there any warranty which states repair must be handled by only manufacture's certified engineer (or the warranty will be revoked.) ?

A: No.

4. Q: Some UPS are quite old. The replacement/repair parts might not be available anymore. If such UPS become inoperable, is the contractor still responsible to repair or maintain them?

A: The PWS states the contractor is responsible to respond to all outages and report status and repair requirements to both OSS/CS respectively. At that time if repair is not practical, then the responsible unit can decide whether to repair or not.

5. Q: On the UPS at Bldg. 3628, a cell (battery) watching system was connected on the UPS. Does the contractor required to maintain/repair such cell watch system as well?

A: If it needs to get replaced, the contractor should be able to make a recommendation and allow customer to decide whether to replace it or not.