Atch_J-4_(AF_FORM_66).pdf

PDF 30 KB Posted

Attached to
Repair 14 Hardened Aircraft Shelter Doors
Solicitation number
FA5270-15-R-0020
Issued by

About this file

Attachment J-4 - AF Form 66

View the file

Other files

File Type Posted
Questions_and_Answers_(1).pdf PDF
Attachment_1_-_Site_Visit_Attendees.pdf PDF
Atch_J-5_-_past_perf_questionnaire.docx.pdf PDF
FA5270-15-R-0020-0001.pdf PDF
Atch_J-3-Toilet_Facility.pdf PDF
Atch_J-1_LXEZ_13-1059_SPEC_Final.pdf PDF
Atch_J-5_-_past_perf_questionnaire_Final.docx.pdf PDF
RFP.pdf PDF
Attachment_2_-_Contract_Drawings.pdf PDF
Atch_J-7.pdf PDF
Atch_J-6.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4 (23 March 2015) 1 OF 8

PROJECT PROJECT TITLE SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

1 SUMMARY OF WORK

01 11 00-1.12 As-built drawings 4

7 days after final inspection

2 01 11 00-1.20 Notification before starting on-site work 4 21 days prior to start of work

3 01 11 00-1.29 DD Form 1354 4 5 days after final inspection

4 ENVIRONMENTAL PROTECTION

01 56 00-3.02A1 Environmental Protection Plan 4

14 days before work starts

5 01 56 00-3.02B Submittals required during site work 4 45

6 01 56 00-3.02C Submittals required after completion of work 4 after completion of site work

7 DEMOLITION

02 41 00-1.5 Existing conditions 4 7 days prior to start of work

8 02 41 00-1.5 Demolition plan 4 7 days prior to start of work

9 02 41 00-1.5 Receipts 4 after completion of submittals

REMOVAL/CONTROL AND DISPOSAL OF

PAINT WITH LEAD 02 82 33.13 20-1.4

Sampling results

4 7 days after test

11 02 82 33.13 20-1.4 Qualifications of CP 4 45

12 02 82 33.13 20-1.4 Lead waste management plan 4 45

AF FORM 66, SEP 86 COPY 1 - CONTRACT FILES

ATTACHMENT 4 (23 March 2015) 2 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

13 02 82 33.13 20-1.4 Completed and signed hazardous waste manifest 4 after completion of submittals

14 CAST-IN-PLACE CONCRETE

03 30 00-1.3a1 Materials for curing materials 4 45

15 03 30 00-1.3a2 Joint sealants 4 45

16 03 30 00-1.3b1 Joint filler 4 45

17 30 00-1.3c1 Concrete mix design 4 7 days after test

18 30 00-1.3c2 Aggregates 4 7 days after test

19 30 00-1.3c3 Compressive strength tests 4 7 days after test

20 30 00-1.3d1 Form removal schedule 4 45

21 30 00-1.3d2 Reinforcing steel 4 45

PAINTS AND COATINGS

09 90 00-1.2a1 Manufacturer's Technical Data Sheets

4 45

23 09 90 00-1.2b1 Color 4 45

24 09 90 00-1.2c1 Manufacturer's material safety data sheets 4 45

ATTACHMENT 4 (23 March 2015) 3 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

25 INTERIOR DISTRIBUTION SYSTEM

26 20 00-1.3 Door motor control panels 4 after completion of site work

26 26 20 00-1.3 Door driving system 4 after completion of site work

27 26 20 00-1.3 Revolving lamp (beacon) 4 after completion of site work

28 26 20 00-1.3 Alarm bell 4 after completion of site work

29 26 20 00-1.3 Wires and cables 4 45

30 26 20 00-1.3 Conduit and fittings 4 45

31 26 20 00-1.3 Circuit breakers 4 45

32 26 20 00-1.3 Enclosed circuit breakers 4 45

33 26 20 00-1.3 600-volt wiring test 4 7 days after test

34 EARTHWORK

31 00 00-1.4 Testing 4 7 days after test

35 31 00 00-1.4 Borrow site testing 4 7 days after test

36 SUBBASES FOR FLEXIBLE PAVING

32 11 16-1.2 Sampling and testing 4 7 days after test

ATTACHMENT 4 (23 March 2015) 4 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

37 32 11 16-1.2 Field density tests 4 7 days after test

AGGREGATE AND/OR GRADED-CRUSHED

AGGREGATE BASE COURSE 32 11 23-1.3

Sampling and testing

4 7 days after test

39 32 11 23-1.3 Field density tests 4 7 days after test

40 BITUMINOUS TACK AND PRIME COATS 32

12 10-1.2 Sampling and testing 4 7 days after test

41 HOT-MIX ASPHALT (HMA) FOR ROADS 32

12 16-1.2 Mix design 4 45

42 32 12 16-1.2 Aggregates 4 7 days after test

43 CONCRETE SIDEWALKS AND CURBS AND

GUTTERS 32 16 13-1.3 Concrete 4 45

44 32 16 13-1.3 Field quality control 4 7 days after test

45 PAVEMENT MARKINGS

32 17 23.00 20-1.2 Paints for airfields 4 45

46 32 17 23.00 20-1.2 Paints for roads and streets 4 45

47 32 17 23.00 20-1.2 Paints for airfields 4 7 days after test

48 32 17 23.00 20-1.2 Paints for roads and streets 4 7 days after test

ATTACHMENT 4 (23 March 2015) 5 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

49 32 17 23.00 20-1.2 Paints for airfields 4 45

50 32 17 23.00 20-1.2 Paints for roads and streets 4 45

51 SODDING

32 92 23-1.3 Fertilizer 4 45

52 32 92 23-1.3 Topsoil composition tests 4 7 days after test

53 32 92 23-1.3 Nursery or sod farm certification 4 45

54 STORM DRAINAGE UTILITIES

33 40 00-1.2 Placing pipe 4 45

55 33 40 00-1.2 Pipeline testing 4 45

56 33 40 00-1.2 Frame and cover for gratings 4 45

57 Drawing S-503 Cyclo gear box 4 45

58 Drawing S-503 Cyclo gear box 4 7 days after final inspection

59 Plummer block 4 45

60 Plummer block 4 7 days after final inspection

ATTACHMENT 4 (23 March 2015) 6 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

61 Driving shaft and parallel 4 45

62 Motor base 4 45

63 Drive sprocket 4 45

64 Explosion proof limit switch 4 45

65 Drawing S-504 Safety cover 4 45

66 Latch and hinge 4 45

67 Drawing S-505 Roller 4 45

68 Neoprene plate 4 45

69 Sub and main roller 4 45

70 Sub and main roller 4 7 daysafter final inspection

71 Drawing S-506 Guide Roller: Roller 4 45

72 Bearing assembly 4 45

ATTACHMENT 4 (23 March 2015) 7 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

73 Grease nipple 4 45

74 Guide roller 4 45

75 Guide roller 4 7 daysafter final inspection

76 Rack and Pin: Rack pin 4 45

77 Rack 4 45

78 Pulley: Sheave 4 45

79 Pulley: Sheave 4 7 daysafter final inspection

80 Pin 4 45

81 Wire 4 45

82 Pulley 4 45

83 Drawing S-507 Guide plate 4 45

84 Scraper 4 45

ATTACHMENT 4 (23 March 2015) 8 OF 8

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 13-1059 REPAIR 14 HAS DOORS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E R

'S R

E C

O M

M E

N D

A

TI

O N

C A

TA

LO

G D

A

TA

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

O P

E R

A

TI

O N

A L

A N

D M

A

IN

TE

N

A N

C E

D A

T

TE

S

T R

E P

O R

TS

O

TH

E R

S

REQUIRED

SUBMISSION

DATE

(CALENDAR DAYS

AFTER N.T.P.)

DATE

RECEIVED

IN

CONTRAC

T ING

DATE TO

CIVIL

ENGINEER

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRAC

TOR

RESUBMIT

TAL

FINAL APPROVAL REMARKS

APPROVED DISAPPROVED

85 Jack block 4 45

86 Support block 4 45

87 Hydraulic jack 4 45

88 Hydraulic jack 4 7 daysafter final inspection

89 Portable battery pump 4 45

90 Portable battery pump 4 7 daysafter final inspection

91 Jack Up instruction 4 after final inspection

92 Drawing S-508 Rubber stopper 4 45