Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IDS_&_CCTV_COMBO_(KO_Signed).pdf | ||
| COMMAND_POST_CCTV_AND_IDS_RFI.pdf | ||
| IDS_&_CCTV_COMBO_(KO_Signed).pdf | ||
| RFI_CP_IDS.pdf | ||
| Building_Layout.pdf | ||
| CP_IDS_&_CCTV_Combo_Amend.pdf | ||
| PWS_Attachment_1_-_CCTV_Layout-Placement.pdf | ||
| PWS_-_Command_Post_IDS_&_CCTV_Upgrade.pdf | ||
| IDS_&_CCTV_COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP IDS - Performance Work Statement
PERFORMANCE BASED WORK STATEMENT
FOR
ALARM INSTALLATION SERVICES
Building 23028 COMMAND POST, ANDERSEN AIR
FORCE BASE
13 Aug 2019
Performance Work Statement Table of Contents
SECTION PAGE
Description of Services 3 Special Requirements 4 IBDSS Enclosure Standard Requirements 5 Installation Timelines 6 Services Summary 7 Authorized Working Hours 8 General Information 8-13 Appendices/Attachment 14-22
1. DESCRIPTION OF SERVICES
1.1.The contractor shall provide all management, tools, supplies, equipment, and labor (to include Standard Warranty) necessary to provide, install and ensure sustainment of a Vindicator
Intrusion Detection Systems (IDS) and swipe access in building 23028, Command Post, and a separate IDS (no swipe access) to the Command Post vault room. No IDS system (stand alone or swipe access) exists in the areas requiring install. Building 23028 (external/internal), Command Post/neighboring rooms, and high priority areas located around building 23028 require in place CCTV security camera replacement and new installs that permit uninhibited visual monitoring inside and outside of Building 23028 to include all attached rooms deemed as high priority, requiring security monitoring.
2. BASIC SERVICES
Contractor shall provide, install, establish maintenance requirements for long term sustainment of systems/equipment Integrated Base Defense Security Systems (IBDSS), as well as removal of debris/waste, replaced systems, and replaced equipment.
Procurement and installation includes sensors, control panels, Balanced Magnetic Switches, key pads, 8 hour-battery backup power and other associated equipment. See Appendix C for list of standards and requirements listed in paragraphs 2.1 – 6.
2.1. Vindicator Intrusion Detection System (IDS) permitting swipe access for Command
Post room (CAT) entry and exit. Swipe access is required for both doors located on the entrapment room that permit entry and exit into the Command Post (CAT) room. All doors must have a remote unlocking capability from the E.A. Room (console). The
Contractor shall install swipe access that also permits Controllers/Personnel inside the
E.A. Room to control entry/exit through both entrapment room doors. The contractor shall allow the configuration of the electronic locking doors to ensure only one door can open at any time (to include remote unlocking from the EA Room).
2.1.1. When entering the entrapment area from the office room through the main entry
“outer entrapment door” the swipe “keypad” shall be installed on the left side of the door 3 inches from door frame and 4 inches below the entry phone. Inside entrapment room exiting through the “outer entrapment door” swipe “keypad” shall be installed 3 inches from door frame and ending 3 inches above and level with the locking mechanism for the doorknob.
2.1.2. The “inner entrapment door” entering the Command Post room; the contractor shall install swipe “keypad” 3 inches from door frame on the left side of frame on inner wall piece to the right of the entry phone ending level with the top of the cypher lock. The “inner entrapment door” exiting the Command Post room, the contractor shall install the swipe “keypad” 9 inches from the door frame starting 3 inches below the exit phone.
2.1.3. All distances listed in paragraphs 2.1.1 and 2.1.2 are approximate. Distances can be altered in order to not affect other mechanicals, cords, or less than ideal wall construction (based on suitability for sustaining/supporting the swipe “keypad”.
2.2. Vault room DO-32/3250070, accessible through the E.A. Room and located next to
WWMCC room. The vault door is 4.5 inches thick 6 feet high solid steel. The vault door requires IDS system without swipe access. The contractor shall install an IDS system that signals/alarms when the vault door is open. The signal/alarm should tie into the current IDS system installed in the E.A. room. The IDS shall be able to be disabled prior to entry into the vault. The contractor shall install a security protocol that permits only authorized personnel access to the disablement “keypad” on the exterior of the vault, restricting entry and access to only authorized users (i.e. individuals on a locally developed access list).
2.3. CCTV System/Camera Replacement: The contractor shall provide all equipment necessary to replace and install CCTV system and cameras. Reference attached CCTV layout (Attachment 1 “CCTV layout/placement”). Briefer Notes specify location, equipment, labor and intended focal point of each camera.
3. SPECIAL REQUIREMENTS
3.1. Final testing will be the primary method the government uses to ensure contract compliance and quality assurance of IBDSS & supporting Physical Security Systems
(PSS). IBDSS Testing follows PACAF 32-1075 requirements which provides a logical order for the applicable testing requirements from AFI 31-101; ESE-TP-0023, Electronic
Security Equipment Installation Acceptance Test and Turnover Plan; UFGS 28 20 01.00
10, IC Tech Spec 705. PSS will be inspected to ensure compliance with applicable standards and to meet the more exacting performance standards that affect IBDSS from
ESE-SIT-0001.
4. STANDARD INSTALLATION CONFIGURATION:
4.1. The Vindicator equipment installed in building 23028 Vault Room and Entrapment
Room must be programmed as per manufacturer standards, communication must be established with the 36 SFS/ECC Vindicator end, IDS sensors must meet manufacture standards, tampers for the sensors will be installed, all sensors will be terminated at the
Vindicator SAP and functional test to be performed before a 72 hour test is initiated.
5. IBDSS ENCLOSURE STANDARD REQUIREMENTS:
5.1. All IBDSS enclosures including, Interior Distribution Boxes (IDB) s, cabinets, and racks shall contain the following:
5.1.1. An isolation breaker that allows all power to the enclosure to be secured and controlled while protecting against over current. Fault isolators that protect each internal device, an internal fuse panel meets this requirement. Surge suppressor that protects the equipment IAW UFC-520-01 and is UL 1449 listed. Backup power from batteries, requirements are covered in “IBDSS Tamper protection switches” on all doors and removable panels. Enclosures with large doors and removable panels that exceed 2.5 feet shall have two tamper switches. If the door hinge can be removed from the outside or the panel can be removed from all four corners, then two additional tamper switches are required. All internal enclosures to include; Junction boxes, Interior Field
Distribution boxes, and terminal boxes shall be of all-steel construction and meet
NEMA 12 standards. The boxes shall be mechanically secured to a flat, stable surface and shall not be capable of being dislodged with reasonable human force. For reused existing infrastructure that does not have NEMA 12 boxes, ensure all are of all-steel construction and free of open conduit knockouts. Unused knockouts shall be tack welded to the box. In areas where tack welding is not possible a reinforced sealing epoxy may be used to seal punch outs and easily removed covers.
6. IBDSS BACKUP POWER REQUIREMENTS:
6.1. The minimum power backup for all IDS is 8 hours and must be by internal batteries or UPS.
Generator backup power may be used to complete the 8 hour requirement with a minimum of 4 hours being provided by internal batteries. If no generator backup power is available then battery backup is required to meet the full requirement. Facility Uninterrupted Power
Source (UPS) is not available as a backup power source for the IDS.
7. INSTALLATION TIMELINES
7.1. EQUIPMENT. All equipment, tools, and materials needed for installation must be ordered by the contractor/vendor no later than 30 days after notification of award of this contract. The contractor/vendor will secure these items until such time as the building is ready for installation to begin.
7.2. MOBILIZATION. The contractor must mobilize all personnel required for the installation of this requirement and arrive within 72 hours of notification that the equipment has been accepted by the government and is ready for IDS installation.
7.2.1. Base Access Request: Updates must be submitted to the Contracting Office NLT 3 calendar days after award (as-required). If contractor does not need to make any changes an email submittal stating, “no changes required” must be submitted NLT 3 calendar days after award. The Government will not be responsible for contractor delays if contractor fails to provide information on time.
7.2.2. Entry Access List: Contractor shall submit the full name and Social Security number for all employees requiring access to the Contracting Office, NLT 3 calendar days after award. Government will not be responsible for contractor delays if contractor fails to provide information on time.
7.3. INSTALLATION. The contractor is required to install the requirement per the award document, this performance work statement, and any applicable/appropriate regulations within 20 duty days following the Governments written acceptance of all equipment.
Upon completion of the install, the contractor must remain in place (on island) and accessible while the first 72-hour burn-in period testing is conducted. The contractor shall remain accountable for all IDS equipment for the first 30 days directly after the 72-hour burn-in period has been completed, in case of faulty equipment or installation. After the final 30 day period has been completed, if there are no issues with the systems or equipment; the government will then accept the install.
7.4. AS-BUILT DOCUMENTS. As built documents are available from the 36 Civil
Engineer Customer Service desk DSN (315) 366-4314. The contractor shall provide the corrected and updated contract drawings in white paper and 2 copies of CD-ROM’s containing all drawings in electronic CADD and PDF, and all documents will be in
WORD, EXCEL, or PDF formats. Prior to the 72 hour burn-in- period test, the
Contractor shall provide all the approved material catalog cuts and maintenance manuals in binders for the government.
8. SERVICES SUMMARY
8.1. The Contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs.
For the Performance Objective to be met, service delivery must be in compliance with applicable performance standards. The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor Quality Control is unacceptable.
Performance Requirements Performance Threshold
Monitoring Method
IDS Installation (Vault) 100% alarm signal when vault door is opened without deactivating the IDS system.
No alarm signals resulting in audible/illumination alarm in the E.A. room.
Swipe Access Installation No more than 3 defaults/access errors when cleared individuals attempt to access/exit facility.
Monitor badging system that offers visual tracking of swipe card activation.
CCTV Installation 100% visual coverage 24 hours a day 7 days a week, 365 days a year.
Visual checks on camera display unit (computer/TV) a minimum of every 2 hours 24 hours a day 7 days a week, 365 days a year.
9. GENERAL INFORMATION
9.1. QUALITY CONTROL
The Contractor is required to control the quality of service delivery and offer to the Government for acceptance only services which conform to contract requirements. The overall control of quality must meet the specified performance thresholds for each requirement in the Services
Summary.
9.1.1 Quality Control Program. The contractor shall provide a complete Quality Control
Program (QCP) to ensure the requirements of the contract are provided as specified. The contractor shall provide a QCP describing the inspection system for the requested services listed in the PWS. The contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of unacceptable services. The contractor shall submit to the Contracting Officer for review no later than 20 days after award of the service contract.
The contractor shall update the plan as changes occur and changes shall be submitted for review by the Contracting Officer.
9.1.2. The contractor’s QCP shall contain, as a minimum, the following items:
9.2. A description of the inspection system to cover all services. Description shall include specifies as to the areas to be inspected on a scheduled and unscheduled basis, frequently of inspections, and the title and organizational placement of the inspector(s).
9.3. A description of the methods to be used for identifying and preventing defects in the quality of service performed.
9.4. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.
9.5. Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
10. AUTHORIZED WORKING HOURS
10.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: MON-FRI 0800-1700, except federal holidays.
The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the government.
10.2. Recognized Holidays. The contractor shall not provide service on the following days:
New Year's Day 1 January 2020 Martin Luther King's Birthday 20 January 2020 President's Day 17 February 2020 Memorial Day 27 May 2020 Independence Day 4 July 2020 Labor Day 2 September 2019 Columbus Day 14 October 2019 Veterans' Day 11 November 2019 Thanksgiving Day 28 November 2019 Christmas Day 25 December 2019 **If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.** All PACAF Down Days. The customer will notify contractor at beginning of performance of installation and remind contractor at least 48 hours prior.
11. CONSERVATION OF UTILITIES
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:
11.1. Lights shall be used only in areas where and when work is actually being performed.
11.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
11.3. Water faucets or valves shall be turned off after the required use has been accomplished.
11.4. Government telephones shall be used only for official government business.
12. RECORDS
12.1. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS. If requested by the
Government, the contractor shall provide the original record or a reproducible copy of any such record within five (5) working days of receipt of the request.
13. GOVERNMENT OBSERVATIONS
13.1. Government personnel, other than contracting officers (COs), may from time to time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.
14. SAFETY REQUIREMENTS
14.1. In performing work under this contract, the contractor shall:
14.1.2. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
14.1.3. Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910).
14.1.4. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.
14.1.5. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
14.1.6. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
14.1.7. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
14.1.8. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.
14.1.9. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
14.1.10. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
15. TRAINING
15.1. The Contractor shall provide training for the operations of the systems and equipment being installed. The training shall, in an effort to minimize mission degradation and impairment, include usage, troubleshooting, and special attributes associated with the systems and equipment. Operating instructions/training shall be provided by the contractor.
16. CONTRACTOR QUALIFICATIONS
16.1. Contractor shall have a comprehensive experience in design, development, integration, implementation and installation of Integrated Base Defense Security Systems (IBDSS) s with the manufacturer certifications listed and the following industry certifications:
16.1.2. Vindicator® certified to install and integrate the Vindicator® IDS line of products, Vindicator® Command & Control system. Capability to install all interior and exterior sensors on the HQ USAF/A7S, Non-Nuclear Intrusion
Detection System (IDS) Equipment Approval memorandum. Cisco certified as a
Cisco Certified Network Professional (CCNP).
16.1.3. Underwriters Laboratory (UL) Listed Alarm system installer and service provider.
16.2. The Contractor shall be Familiar with new Risk Management Framework (RMF) for DoD
Information Technology (IT) which replaces the Department of Defense Information
Assurance Certification and Accreditation Process (DIACAP). Meet all IBDSS Platform
Information Technology (PIT) accreditation requirements IAW RMF and the associated
National Institute of Standards and Technology (NIST) standards. Must be capable of installing the IBDSS IAW with applicable System Security Plans (SSP) for Vindicator®.
Capable of completing an Implementation Plan and providing accreditation paperwork.
Technicians must be US citizens to accomplish all IDE installation.
17. PUBLICATIONS
17.1. Compliance with all publications, regulations and operating instructions provided by the Government is required (Ref. appendix C) when:
17.1.2. They pertain to the procedures for materials expediting herein and where the contractor is authorized by the performance work statement to accomplish the work specified in the publication, regulation or operating instructions.
17.1.3. The publications prescribe USAF policies, use of materials, procedures and processes applicable to the work requirements.
17.1.4. The contractor is required to acquire and work on the latest version of the publication.
18. CONTRACTOR PERSONNEL
18.1. Contract Manager: the contractor shall provide a contract manager and alternate contract manager (responsible in the absence of the contract manager) who shall be responsible for the performance of the services. The names of the contract manager and alternate(s) shall be provided to the CO in writing prior to the beginning of the performance of installation.
The contract manager and alternate(s) must be able to read, write, speak, and understand
English.
18.1.2. The contract manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.
18.1.3. The contract manager or alternate shall be available during normal duty hours within two (2) hours to meet on the installation with government personnel
(designated by the CO) to discuss problems. During final testing (30 days), reference paragraph 3, after normal duty hours the manager or alternate shall be available within four (4) hours.
18.2. Contractor Employees: the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
18.2.2. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
18.2.3. The contractor shall not employ any person who is an employee of the U.S.
Government if employing that person would create a conflict of interest.
Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DOD 5500-7-R Joint Ethics Regulation.
The contractor shall not employ any person who is an employee of the
Department of the Air Force if such employment would be contrary to the policies in AFI 64-106.
18.2.4. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
19. APPENDICES
A. Acronyms & Abbreviations List
B. Estimated Workload Data
C. Publication/Instructions
D. Attachment 1
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
Acronym/Abbreviation Definition
AF Air Force
AFB Air Force Base
CFR Code Federal Regulation
CO Contracting Officer
COR Contracting Officer Representative
DEPT Department
DOD Department of Defense
FAR Federal Acquisition Regulation
GR Government Representative
GFP/M Government Furnished Property/Materials
IDS Intrusion Detection System
OSHA Occupational Safety and Health Act
PBSA Performance Base Service Acquisition
PIR Passive Infa-Red
PWS Performance Based Work Statement
QA Quality Assurance
QCP Quality Control Program
SS Services Summary
USAF United States Air Force
APPENDIX B
ESTIMATED WORKLOAD DATA
Vindicator® Command and Control Platform (VCCP) v5- Version 6.5 (Windows® 7, 32 bit only) or later are required in all PACAF IBDSS installations. To ensure compatibility with the
VCCP and ensure proper performance all IBDSS will use IDS equipment from the HQ
USAF/A7S, Non- Nuclear Intrusion Detection System (IDS) Equipment Approval, (Approved
IDS Equipment list).
BLDG. 23028, ROOM: Command Post
IDS Swipe access into the Command Post entry way through the entrapment room (main entrance) Vindicator install meeting HAF/PACAF security requirements
CCTV security camera system allowing visual monitoring inside/outside the Command Post facility.
BLDG 23028, ROOM: CP VAULT
Vindicator install meeting HAF/PACAF security requirements
BLDG 23028
Install CCTV and replace/add cameras at key points throughout the building (Ref attachment 1).
APPENDIX C
PUBLICATION/INSTRUCTIONS
2.1. DEPARTMENT OF DEFENSE SPECIFICATIONS
- UFGS Specifications are accessible to the public at http://www.wbdg.org
□ UFGS-28 20 01.00 10, Electronic Security System, Oct 2007
□ UFGS-28 16 00.00 20, Basic Intrusion Detection Systems (IDS), Apr 2006
□ UFGS-28 16 01.00 10, Small Intrusion Detection System, Nov 2008
□ UFGS-28 23 23.00 10, Closed Circuit Television Systems, Feb 2011
□ UFGS-28 26 23, Duress Signal System (For Brig Facilities), Apr 2006
□ UFGS-28 05 26.00 40, Grounding and Bonding for Electronic Safety and Security, Aug 2013
□ UFGS-31 23 00.00 20, Excavation and Fill, Feb 2011
□ UFGS-27 21 10.00 40, Fiber Optic Data Transmission System, May 2013
□ UFGS-08 11 13, Steel Doors and Frames, Feb 2014
□ UFGS-08 34 53, Security Doors and Frames, Aug 2008
□ UFGS-08 34 73, Sound Control Door Assemblies, May 2012
□ UFGS-02 41 00, Demolition and/or Deconstruction, May 2010
□ UFGS-32 31 13.53, High-Security Chain Link Fences and Gates, Apr 2008
□ UFGS-26 55 53.00 40, Security Lighting, May 2011
□ UFGS-26 56 13.00 40, Lighting Poles and Standards, Nov 2008
□ UFGS-08 56 63, Detention and Security Windows, Apr 2006
□ UFGS-08 81 00, Glazing, Aug 2011
□ UFGS-08 88 53, Detention and Security Glazing, May 2011
□ UFGS-01 45 00.10 20, Quality Control for Minor Construction, Feb 2010
2.2. DEPARTMENT OF DEFENSE STANDARDS
- Standards are accessible to the public at: http://www.wbdg.org. FOUO Standards are available at: https://pdc.usace.army.mil/, registration will be required.
□ UFC 4-021-02, Electronic Security Systems, 01 Oct 2013
□ UFC 4-010-05, Sensitive Compartmented Information Facilities Planning, Design, and Construction, 01 Feb 2013, with Change 1, 01 Oct 2013
□ UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points, 25 May 2005
□ UFC 3-520-01, Interior Electrical Systems, 03 Feb 2010, with Change 2, 01 Jul 2012
□ UFC 4-022-03, Security Fences and Gates, 01 Oct 2013
□ UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, 09 Feb 2012, change 1
Oct 2013
□ UFC 4-020-01, DoD, Security Engineering Facilities Planning Manual, 11 Nov 2008 http://www.wbdg.org/ http://www.wbdg.org/
□ UFC 4-020-02FA, Security Engineering: Concept Design (FOUO), 01 Mar 2005
□ UFC 4-020-03FA, Security Engineering: Final Design (FOUO), 01 Mar 2005
□ UFC 4-010-03, Security Engineering: Physical Security Measures for High-Risk Personnel, 02 Aug 2011
□ UFC 3-530-01, Design: Interior and Exterior Lighting and Controls, 22 Aug 2006, with Change 3, 01 Sep 2013
□ MIL-HDDK-1013/1A, Design Guidelines for Physical Security of Facilities, 15 Dec 1993
□ MIL-HDBK-1190, Facility Planning and Design Guides, 01 Sep 87
□ MIL-STD-188-124B, Grounding, Bonding and Shielding for Common Long Haul/Tactical Communication Systems Including Ground Based Communications- Electronics Facilities and Equipment’s, 01 Feb 1992, with change notice 4, 04 Apr 2013
□ MIL-HDBK-419A, Grounding, Bonding, and Shielding for Electronic Equipment’s and Facilities, Volume I, Basic Theory, 29 Dec 1987
□ MIL-HDBK-419B, Grounding, Bonding, and Shielding for Electronic Equipment’s and Facilities, Volume II, Applications, 29 Dec 1987
□ ETL 13-4, Engineering Technical Letter (ETL) 13-4: Standby Generator Design, Maintenance, and Testing Criteria, 18 Nov 2013
□ UFC 1-300-09N, Design Procedures, 25 May 2005, with Change 9, 01 Jul 2013
- Air Force publications are accessible at: http://www.e-publishing.af.mil. FOUO publications area available at: https://wmsweb.afncr.af.mil/wms/default.aspx (CAC will be required)
□ AFI 31-101 (FOUO), Integrated Defense, 08 Oct 2009, with change 2, 07 Mar 2013
□ HQ PACAF Supplement to AFI 31-101 (FOUO), Integrated Defense Supplement, 11 Feb
□ AFI 31-113 (FOUO), Installation Perimeter Access Control, 26 Jan 2012
□ AFI 10-207, Command Posts, 01 Feb 2012
□ AFI 32-1024, Standard Facility Requirements, 14 Jul 2011
□ AFM 32-1084, Facility Requirements, 20 Apr 2012
□ HQ PACAFI 32-1075, Integrated Base Defense Security System (IBDSS) Installation, Maintenance, Sustainment, Restoration and Modernization, 29 Oct
- DOD publications are accessible at: http://www.dtic.mil/whs/directives/index.html
□ DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, 24 Feb 2012, with change 2, 19 Mar 2013
□ DoDM 5100.76, Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives (AA&E), 17 Apr 2012
□ DoDI 8500.01, Cybersecurity, 14 Mar 2014
□ DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 12 Mar 2014
- Intelligence Community Publications are accessible at:
http://www.e-publishing.af.mil/ http://www.dtic.mil/whs/directives/index.html http://www.navfac.navy.mil/navfac_worldwide/specialty_centers/exwc/products_and_services/ capita l_improvements/dod_lock/Documents/DirectivesandGuidance.html
□ ICD 704, Intelligence Community Directive 704, Personnel Security Standards and Procedures Governing Eligibility for Access to Sensitive Compartmented Information and Other Controlled Access Program Information, 01 October 2008
□ ICD 705, Intelligence Community Directive 705, Sensitive Compartmented Information Facilities, 26 May 2010
□ ICS 705-1, Intelligence Community Standard Number 705-1, Physical and Technical Security Standards For Sensitive Compartmented Information Facilities, 17 Sep 2010
□ ICS 705-2, Intelligence Community Standard Number 705-2, Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information, 17 Sep 2010
□ IC Tech Spec-for ICD/ICS 705, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.2, , 23 Apr
- National Institute of Standards and Technology (NIST) Federal Information Processing Standards (FIPS) standards are accessible at: www.nist.gov
□ FIPS-197, Advanced Encryption Standard (AES), 26 Nov 2001
□ FIPS 140-2, Security Requirements for Cryptographic Modules, 25 May 2001, with changes up to 03 Dec 2002
□ HSPD-12, Homeland Security Presidential Directive 12, 27 Aug 2004
□ FIPS PUB 201-2, Personal Identity Verification (PIV) of Federal Employees and Contractors, Aug 2013
- Occupational Safety & Health Administration standards and publications are available at: www.osha.gov
□ OSHA Incorporation of General Industry Safety and Health Standards Applicable to Construction Work, Fed Register #58:35076-35306, 30 Jun 1993
- USFK instructions are available at: www.usfk.mil
□ USFK 700-19, The Invited Contractor and Technical Representative Program, 28 Aug 2012
- USFJ instructions are available at: www.usfj.mil, under the USFJ Portal, A CAC will be required.
□ USFJ 64-102, United States Official Contractors and Their Employees, 01 Jul 2010
- These standards are not accessible on the internet and will be provided.
□ CCD for IBDSS, Capabilities Development Document for Integrated Base Defense Security System (FOUO), Increment: 1, ACAT III, 17 Feb 05
□ ESE-SIT-0001, Standardized Electronic Security Equipment Siting and Design Guidance for Permanent Installations (FOUO), 01 Mar 2013
□ ESE-TP-0023, Electronic Security Equipment Installation Acceptance Test and Turnover Plan, 01 Mar 2013
□ HQ USAF/A7S, Non-Nuclear Intrusion Detection System (IDS) Equipment Approval, http://www.navfac.navy.mil/navfac_worldwide/specialty_centers/exwc/products_and_services/capita http://www.navfac.navy.mil/navfac_worldwide/specialty_centers/exwc/products_and_services/capita http://www.nist.gov/ http://www.osha.gov/ http://www.usfk.mil/ http://www.usfj.mil/
(Approved IDS Equipment list), 29 Jan 2014
□ Joint Air Force - Army – Navy (JFAN 6/9) Manual, Physical Security Standards for Special Access Program Facilities, 23 March 2004, with change 1 to Annex B, 09 Dec
□ TO 31-10-24, Installation Practices: Communications Systems Grounding, Bonding, and Shielding.28 Apr 2014
□ TO 31-10-34, Fiber Optic Communication Cables and Connectors, 01 Oct 1998, with change 1, 01 Jul 1999
□ BISS-SYS-14000B, System Specification for Alarm Set, Anti-Intrusion, Restricted Area AN/GSX-4 (Advanced Entry Control System (AECS)), 19 Aug 1996 Vindicator® Network SSP, Force Protection Branch, Electronic Systems Center (now Life Cycle Management Center (LCMC)), Honeywell Vindicator® V5 Command and Control Display Equipment (CCDE) System Security Plan (SSP), 20 Jun 2011
2.3. NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS
- National Fire Protection Association (NFPA) Codes are accessible at: www.nfpa.org
□ NFPA 70: National Electrical Code®, 2014
□ NFPA 101: Life Safety Code®, 2012
- Underwriters Laboratory® (UL®) Standards are accessible at: www.ul.com. UL® may charge for the purchase of its standards.
□ UL 2050, UL® Standard for Safety for National Industrial Security Systems, Fifth Edition, 05 Nov 2010
□ UL 634, UL® Standard for Safety for Connectors and Switches for Use with Burglar-Alarm Systems, Ninth Edition, 12 Oct 2007
□ UL 639, UL® Standard for Safety for Intrusion-Detection Units, Eighth Edition, 31 Aug
□ UL 681, UL® Standard for Safety for Installation and Classification of Burglar and Holdup Alarm Systems, Fifteenth Edition, 16 Jan 2014
□ UL 1076, UL® Standard for Safety for Proprietary Burglar Alarm Units and Systems, Fifth Edition, 29 Sep 1995
□ UL 1034, UL® Standard for Burglary-Resistant Electric Locking Mechanisms, Sixth Edition, 18 May 2011
□ UL 294, UL® Standard for Access Control System Units, Sixth Edition, 10 May 2013
□ UL 1449, UL® Standard for Surge Protective Devices, Third Edition, 29 Sep 2006
□ UL 497, UL® Standard for Protectors for Paired-Conductor Communications Circuits, Seventh Edition, 25 Apr 2001
□ UL 497A, UL® Standard for Secondary Protectors for Communications Circuits, Third Edition, 20 Mar 2001
□ UL 497B, UL® Standard for Protectors for Data Communications and Fire-Alarm Circuits, Fourth Edition, 14 Jun 2004
- American Society of Mechanical Engineers (ASME) Drawing specifications are available at www.asme.org: ASME may charge for the purchase of its documents.
http://www.nfpa.org/ http://www.ul.com/ http://www.asme.org/
□ ASME Y14.100-2014, Engineering Drawing Practices, dated 2014
□ ASME Y14.24-2012, Types and Applications of Engineering Drawings, dated 2012
□ ASME Y14.31-2014, Undimensioned Drawings, dated 2014
□ ASME Y14.34-2013, Associated Lists, dated 2013
□ ASME Y14.35M-1997, Revision of Engineering Drawings and Associated Documents, dated 1997.
ASME Y14.38-2007, Abbreviations and Acronyms for Use on Drawings and Related
Documents, dated 2007
ATTACHMENT 1
CCTV CAMERA LAYOUT/PLACEMENT PHOTOS
ATTACHMENT 2
BUILDING LAYOUT
| PERFORMANCE BASED WORK STATEMENT FOR |
| 8. SERVICES SUMMARY |
| 9. GENERAL INFORMATION |
| APPENDIX A |
| APPENDIX B |
| APPENDIX C |
| ATTACHMENT 1 |