A-14_Exhibit_A.pdf

PDF 84 KB Posted

Attached to
Natural Gas at Yokota Air Base
Solicitation number
FA5209-13-R-0032
Issued by

About this file

Exhibit A

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA5209‐13‐R‐0032

Exhibit A

Item No. Supply Point

A001 Supply Point 1 (West)

A001AA Testing Period 19,000 ¥ /m3 (1) ¥ Minimum Order

Amount Minimum Order Maximum Order

2,900,000 ~ 4,000,000 ¥ /m3 ¥ ~ (2) ¥

A001AC

Penalty Charge for Yearly

Load Factor (3) ¥

A002 Supply Point 2 (East)

A002AA Testing Period 35,400 ¥ /m3 (4) ¥ Minimum Order

Amount Minimum Order Maximum Order

4,500,000 ~ 6,100,000 ¥ /m3 ¥ ~ (5) ¥

A002AC

Penalty Charge for Yearly

Load Factor (6) ¥

A003 Supply Point 3 (Main 1)

A003AA Testing Period 46,200 ¥ /m3 (7) ¥ Minimum Order

Amount Minimum Order Maximum Order

10,100,000 ~ 13,800,000 ¥ /m3 ¥ ~ (8) ¥

A003AC

Penalty Charge for Yearly

Load Factor (9) ¥

A004 Supply Point 4 (Main 2)

A004AA Testing Period ¥ N/A /m3 ¥ N/A Minimum Order

Amount Minimum Order Maximum Order

57,000 ~ 62,000 ¥ /m3 ¥ ~ (10) ¥

A004AC

Penalty Charge for Yearly

Load Factor (11) ¥

**Normal Operation: Period: 5 years after Testing Period is completed.

***Unit price shall be the third decimal place.

(a) Total Maximum Estimate of CLIN A001 = (1) +(2) + (3)

(b) Total Maximum Estimate of CLIN A002 = (4) +(5) + (6)

(c) Total Maximum Estimate of CLIN A003 = (7) +(8) + (9)

(d) Total Maximum Estimate of CLIN A004 = (10) +(11)

Maximum Order

Amount

Penalty Accessed If…

Actual Yearly Load Factor < ________%

Maximum Order

Amount

Penalty Accessed If…

Actual Yearly Load Factor < ________%

A002AB Normal Operation

A003AB Normal Operation

*Testing Period: Period: From after installation of gas lines for approx four (4) weeks for tests conducted during the winter season, nine (9) weeks in other than winter season

Maximum Order

Amount

Penalty Accessed If…

Actual Yearly Load Factor < ________%

N/A

(e) Total Maximum Estimate of CLIN A001 through to A004 = Sum of (a) through (d)

(f) Grand Total Maximum Estimate for Normal Operation for 5 Years = (e) x 5 (years)

A004AB Normal Operation

Penalty Accessed If…

Actual Yearly Load Factor < ________%

Estimate Consumption Amount (m3) Unit Price

Pricing Schedule

Estimate Amount

Maximum Order

Amount A001AB Normal Operation

File details come from the government source that posted it. Updated .