JA-3_Drawings_pt2.pdf

PDF 41 MB Posted

Attached to
F-35 Renovate Permanent Party Dorm (B2662) Federal contract opportunity
Solicitation number
FA500419BA008
Issued by
Department of the Air Force Pacific Air Forces

About this file

Drawings pt2

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Renovate Permanent Party Dorm (B2662), newest first.
File Type Posted
MFR_for_FBO.pdf PDF
Perm_Party_Dorm_Q&As.pdf PDF
Solicitation_Amendment_FA500419BA0080004_SF_30.pdf PDF
Solicitation_Amendment_-_FA500419BA0080004.pdf PDF
Solicitation_Amendment_FA500419BA0080003_SF30.pdf PDF
JA-6_Wage_Determination(14_June_2019).pdf PDF
Solicitation_Amendment_FA500419BA0080002_SF30.pdf PDF
FA500419BA0080001_SF_30.pdf PDF
FA500419BA0080001.pdf PDF
JA-4_Submittal_Register.pdf PDF
JA-6_Wage_Determination_19_Apr_19.pdf PDF
JA-1_Synopsis_of_Work.pdf PDF
Solicitation_-_FA500419BA008.pdf PDF
JA-2_Drawings_pt1.pdf PDF
JA-7_Bid_Schedule.pdf PDF
JA-5_Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

A

B

C

D

E

F

G

H

J

K

L

M

MD401

(E) STORAGE

STAIR NO. 4

BULK STORAGE

STORAGE

CORRIDOR

BULK STORAGE

MAIL ROOM

BULK STORAGE

CORRIDOR

OFFICE

STAIR NO. 2

BULK STORAGE

010 MECHANICAL

ROOM

HOT WATER

BOILER ROOM

FIRE PROTECTION

ROOM

UTILIDOR

ENTRANCE

LOUNGE

0 13 STAIR NO. 3

FAN ROOM

JANITOR CLOSET

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

MD110

B A

S E

M E

N T

P

L U

M B

IN

G

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD110

1 BASEMENT - PLUMBING PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMO 6" WASTE MAIN LOWER THAN 36" BELOW

STRUCTURE ABOVE. PROVIDE ADEQUATE CONNECTION FOR

NEW VERTICAL RISER TO EXISTING PENETRATION THRU

SLAB.

DEMO WATER HEATER AND APPURTENANCES.

DEMO 4" WASTE MAIN, 2" RISER, AND INSULATION AT

DAMAGED SECTION.

No. Date Item

B

C

D

E

F

G

H

J

K

L

M

MEETING

ROOM/LOUNGE

LAUNDROMAT

STAIR

DRESSING ROOM

LAUNDRY

MEN

WOMEN

101 103 109 111 113 115

114112

STAIR

LOUNGE

CORRIDOR

VENDING

JAN.

STAIR

1 1

2 3

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

MD111

L E

V E

L

P

L U

M B

IN

G

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD111

1 LEVEL 1 - PLUMBING PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH THE FOLLOWING PLUMBING FIXTURES PER SUITE: (1) WATER CLOSET, (1) SHOWERHEAD,

(1) BATHTUB SPOUT, (1) SHOWER/BATHTUB COMBINATION VALVE, (1) COUNTER MOUNT KITCHEN SINK,

(2) COUNTER MOUNT LAVATORIES.

DEMOLISH WATER CLOSET & WALL MOUNT LAVATORY.

DEMOLISH LAUNDRY SINK WITH FAUCET.

DEMOLISH WATER FOUNTAINS (2). NOTE HEIGHTS FOR REPLACEMENT

REMOVE ICE MAKER FOR REINSTALLATION. DEMOLISH SUPPLY HOSE AND WASTE PIPING TO FLOOR

FUNNEL.

EXISTING SINK TO REMAIN.

DEMOLISH PLUMBING FIXTURES, PIPING, AND APPURTENANCES SERVING THIS ROOM. CAP PIPING.

CAP AND SEAL FLOOR DRAIN.

B

C

D

E

F

G

H

J

K

L

M

STORAGE

STAIR

LAUNDRY

STAIR

CORRIDOR

ELEC

QUIET LOUNGE

JAN

LOUNGE

STAIR

201 203 209 211 213 215

214212

1 1 1

11111

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD112

L E

V E

L

P

L U

M B

IN

G

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD112

1 LEVEL 2 - PLUMBING PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH THE FOLLOWING PLUMBING FIXTURES PER SUITE:

(1) WATER CLOSET, (1) SHOWERHEAD, (1) BATHTUB SPOUT,

(1) SHOWER/BATHTUB COMBINATION VALVE, (1) COUNTER

MOUNT KITCHEN SINK, (2) COUNTER MOUNT LAVATORIES.

DEMOLISH LAUNDRY SINK WITH FAUCET.

DEMOLISH WATER FOUNTAIN.

B

C

D

E

F

G

H

J

K

L

M

STORAGE

LAUNDRY

STAIR

CORRIDOR

ELEC

QUIET LOUNGE

JAN

LOUNGE

STAIR

301 303 309 311 313

312310

1 1 1

11111

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD113

L E

V E

L

P

L U

M B

IN

G

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD113

1 LEVEL 3 - PLUMBING PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH THE FOLLOWING PLUMBING FIXTURES PER SUITE:

(1) WATER CLOSET, (1) SHOWERHEAD, (1) BATHTUB SPOUT,

(1) SHOWER/BATHTUB COMBINATION VALVE, (1) COUNTER

MOUNT KITCHEN SINK, (2) COUNTER MOUNT LAVATORIES.

DEMOLISH LAUNDRY SINK WITH FAUCET.

DEMOLISH WATER FOUNTAIN.

B

C

D

E

F

G

H

J

K

L

M

STAIR

MECHANICAL

PENTHOUSE FAN

ROOM

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD114

R O

O F

P

L U

M B

IN

G

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD114

1 ROOF - PLUMBING PLAN - DEMOLITION

SHEET NOTES

1. NO WORK ON THIS SHEET.

SHEET KEYNOTES

NOT USED1

1 2 3 4 5 6 7 8 9 10 11 12 13 16 17 18 19

B

C

D

E

F

G

H

J

K

L

M

MD401

(E) STORAGE

STAIR NO. 4

BULK STORAGE

STORAGE

CORRIDOR

BULK STORAGE

MAIL ROOM

BULK STORAGE

CORRIDOR

OFFICE

BULK STORAGE

MECHANICAL

ROOM

HOT WATER

BOILER ROOM

FIRE PROTECTION

ROOM

UTILIDOR

ENTRANCE

LOUNGE

0 13

STAIR NO. 3

FAN ROOM

JANITOR CLOSET

2 2

3 4 3

34 3

STAIR

NO. 2

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD120

B A

S E

M E

N T

H

Y D

R O

N

IC

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD120

1 BASEMENT - HYDRONIC PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH ALL HYDRONIC, STEAM, AND CONDENSATE

PIPING AND ASSOCIATED EQUIPMENT IN THIS AREA,

CONTRACTOR TO VERIFY DEMOLITION OF PIPING WILL NOT

IMPACT FUNCTION OF EQUIPMENT IN OTHER PARTS OF THE

BUILDING.

DEMOLISH TERMINAL HEATING UNIT, TERMINAL UNIT PIPING

AND APPURTENANCES TO REMAIN INTACT FOR REUSE.

DEMOLISH TERMINAL HEATING UNIT, DEMOLISH TERMINAL

UNIT PIPING BACK TO CEILING.

DEMOLISH TERMINAL HEATING UNITS AND ASSOCIATED

PIPING, CAP PIPING AT CEILING.

B

C

D

E

F

G

H

J

K

L

M

MEETING

ROOM/LOUNGE

LAUNDROMAT

STAIR

DRESSING ROOM

LAUNDRY

MEN

WOMEN

101 103 109 111 113 115

116114112106

STAIR

LOUNGE

CORRIDOR

VENDING

JAN.

STAIR

2 2 2 2

2 2 2 2 2 2 2

2222222222222

(D) CUH

(D) FTR

(D) CUH

(D) RADIATOR

(D) FTR

ENTRANCE

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD121

L E

V E

L

H

Y D

R O

N

IC

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD121

1 LEVEL 1 - HYDRONIC PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH ALL HYDRONIC, STEAM, AND CONDENSATE

PIPING AND ASSOCIATED EQUIPMENT IN THIS AREA,

CONTRACTOR TO VERIFY DEMOLITION OF PIPING WILL NOT

IMPACT FUNCTION OF EQUIPMENT IN OTHER PARTS OF THE

BUILDING.

DEMOLISH TERMINAL HEATING UNIT, TERMINAL UNIT PIPING

AND APPURTENANCES TO REMAIN INTACT FOR REUSE.

(D) UH

B

C

D

E

F

G

H

J

K

L

M

STORAGE

LAUNDRY

STAIR

CORRIDOR

ELEC

QUIET LOUNGE

205 JAN

LOUNGE

STAIR

201 203 209 211 213 215

214212210204

1 1 1

1 1 1 1 1 1 1 1

1111111111111

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD122

L E

V E

L

H

Y D

R O

N

IC

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD122

1 LEVEL 2 - HYDRONIC PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH TERMINAL HEATING UNIT, TERMINAL UNIT PIPING

AND APPURTENANCES TO REMAIN INTACT FOR REUSE.

B

C

D

E

F

G

H

J

K

L

M

STORAGE

LAUNDRY

STAIR

CORRIDOR

ELEC

QUIET LOUNGE

JAN

LOUNGE

STAIR

301 303 309 311

314312310304

1 1 1

1 1 1 1 1 1 1 1

1111111111111

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD123

L E

V E

L

H

Y D

R O

N

IC

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD123

1 LEVEL 3 - HYDRONIC PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH TERMINAL HEATING UNIT, TERMINAL UNIT PIPING

AND APPURTENANCES TO REMAIN INTACT FOR REUSE.

B

C

D

E

F

G

H

J

K

L

M

STAIR

MECHANICAL

PENTHOUSE FAN

ROOM

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :0

P

M

MD124

R O

O F

H

Y D

R O

N

IC

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD124

1 ROOF - HYDRONIC PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH TERMINAL HEATING UNIT, TERMINAL UNIT PIPING

AND APPURTENANCES TO REMAIN INTACT FOR REUSE.

B

C

D

E

F

G

H

J

K

L

M

MD401

(E) STORAGE

STAIR NO. 4

BULK STORAGE

STORAGE

CORRIDOR

BULK STORAGE

MAIL ROOM

BULK STORAGE

CORRIDOR

OFFICE

STAIR NO. 2

BULK STORAGE

010 MECHANICAL

ROOM

HOT WATER

BOILER ROOM

FIRE PROTECTION

ROOM

UTILIDOR

ENTRANCE

LOUNGE

0 13 STAIR NO. 3

FAN ROOM

JANITOR CLOSET

STORAGE

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :1

P

M

MD130

B A

S E

M E

N T

V

E N

T

IL

A T

IO

N

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD130

1 BASEMENT - VENTILATION PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH PACKAGED AIR HANDLING UNIT AND ASSOCIATED

DUCTWORK.

DEMOLISH VENTILATION FAN, DUCTWORK, AND

APPURTENANCES.

B

C

D

E

F

G

H

J

K

L

M

MEETING

ROOM/LOUNGE

LAUNDROMAT

STAIR

DRESSING ROOM

LAUNDRY

MEN

WOMEN

101 103 109 111 113 115

116114112106

STAIR

LOUNGE

CORRIDOR

VENDING

JAN.

STAIR

1 1 1

ENTRANCE

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :1

P

M

MD131

L E

V E

L

V

E N

T

IL

A T

IO

N

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD131

1 LEVEL 1 - VENTILATION PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH KITCHEN HOOD.

DEMOLISH ALL EXISTING DUCTWORK, FANS, KITCHEN

HOODS, AND DIFFUSERS IN THIS AREA.

B

C

D

E

F

G

H

J

K

L

M

STORAGE

LAUNDRY

STAIR

CORRIDOR

ELEC

QUIET LOUNGE

JAN

LOUNGE

STAIR

201 203 209 211 213 215

214212210204

1 1

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :1

P

M

MD132

L E

V E

L

V

E N

T

IL

A T

IO

N

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD132

1 LEVEL 2 - VENTILATION PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH KITCHEN HOOD.1

B

C

D

E

F

G

H

J

K

L

M

STORAGE

LAUNDRY

STAIR

CORRIDOR

ELEC

QUIET LOUNGE

JAN

LOUNGE

STAIR

301 303 309 311 313 315

314312310304

1 1

1 1

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :1

P

M

MD133

L E

V E

L

V

E N

T

IL

A T

IO

N

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD133

1 LEVEL 3 - VENTILATION PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMOLISH KITCHEN HOOD.1

B

C

D

E

F

G

H

J

K

L

M

STAIR

MECHANICAL

PENTHOUSE FAN

ROOM

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :1

P

M

MD134

R O

O F

V

E N

T

IL

A T

IO

N

P L

A N

D

E M

O L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"MD134

1 ROOF - VENTILATION PLAN - DEMOLITION

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

DEMO SUPPLY AND EXHAUST FANS.1

14 15 16

H

MECHANICAL

ROOM

(D) DDC PANELS

(D) MOTOR STARTERS

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

PLAN NORTH

REVISIONS

2' 4'

1/2" = 1' - 0"

2' 4'

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :1

P

M

MD401

B A

S E

M E

N T

L A

R G

E S

C A

L E

P L

A N

M

E C

H A

N

IC

A L

R O

O M

D E

M O

L

IT

IO

N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

1/2" = 1'-0"MD401

1 BASEMENT LARGE SCALE PLAN - MECHANICAL ROOM 012 - DEMOLITION

SHEET NOTES

1. DEMOLISH MECHANICAL EQUIPMENT TO INCLUDE BUT NOT

LIMITED TO: (1) HEAT EXCHANGER, (10) CIRCULATOR PUMPS,

(1) GLYCOL MAKE UP TANK, (1) EXPANSION TANK, (1) AIR

SEPARATOR, (1) UNIT HEATER, STEAM PRDV VALVES, STEAM

CONTROL VALVES, AND PIPING AS REQUIRED TO FACILITATE

THE WORK SHOWN ON M401.

SHEET KEYNOTES

NOT USED1

B

C

D

E

F

G

H

J

K

L

M

M-401

WH-1

SNOW

BLOWER

STORAGE

STORAGE

BULK

STORAGE

BULK

STORAGE

STORAGE

ELECT.

BULK

STORAGE

JANITOR

CLOSET

OFFICE

FIRE

PROTECTION

BULK

STORAGE

H/W BOILER

ROOM

MECHANICAL

ROOM

STORAGE

NEW

CORRIDOR

STORAGE

CORRIDOR

HALL

6" W

STAIR

NO. 2

STAIR

NO. 3

STAIR

NO. 1

STORAGE

STORAGE

005A3 ET-2

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-110

B A

S E

M E

N T

P

L U

M B

IN

G

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-110

1 BASEMENT - PLUMBING PLAN

SHEET NOTES

1. EXISTING PLUMBING MAINS TO REMAIN. REUSE ANGLE

STOPS. PROVIDE NEW PLUMBING FIXTURES AND PIPING

DOWNSTREAM OF ANGLE STOPS.

SHEET KEYNOTES

RELOCATE 6" WASTE MAIN TO WITHIN 36" OF STRUCTURE

ABOVE. PROVIDE VERTICAL RISER TO EXISTING

PENETRATION THRU SLAB.

PROVIDE NEW WATER HEATER AND EXPANSION TANK.

PROVIDE NEW 4" WASTE MAIN, 2" RISER, AND INSULATION AT

DAMAGED SECTION.

B

C

D

E

F

G

H

J

K

L

M

1 1 1 1

111111

M-402

MEN

WOMEN

LAUNDRY

STAIR

NO. 1

LOUNGE

QUIET ROOM

JAN

109 111 113 115

114112

STAIR

NO. 3

STAIR

NO. 2

CORRIDOR

ELEC

MAIL

COMPUTER

LOUNGE

STORAGE

HALL

STOR

OFFICE

ENTRANCE

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-111

L E

V E

L

P

L U

M B

IN

G

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-111

1 LEVEL 1 - PLUMBING PLAN

SHEET NOTES

1. EXISTING PLUMBING MAINS TO REMAIN. REUSE ANGLE

STOPS. PROVIDE NEW PLUMBING FIXTURES AND PIPING

DOWNSTREAM OF ANGLE STOPS.

SHEET KEYNOTES

PROVIDE THE FOLLOWING NEW PLUMBING FIXTURES PER

SUITE: (1) WATER CLOSET, (1) SHOWERHEAD, (1) BATHTUB

SPOUT, (1) SHOWER/BATHTUB COMBINATION VALVE, (1)

COUNTER MOUNT KITCHEN SINK, (2) COUNTER MOUNT

LAVATORIES, SEE M402 FOR TYPICAL LAYOUT.

PROVIDE NEW WATER CLOSET (P-1), & WALL MOUNT

LAVATORY (P-7).

PROVIDE NEW LAUNDRY SINK WITH FAUCET. (P-5)

PROVIDE A SHOWER SPRAY UNIT WITH A HOSE MINIMUM 59

INCHES LONG THAT CAN BE USED BOTH AS A FIXED-POSITION

SHOWER HEAD AND AS A HAND-HELD SHOWER. THIS SHOWER

SPRAY UNIT SHALL BE PROVIDED IN ACCORDANCE WITH

SECTION 607.6 ABA STDS 2015 ADOPTED BY DOD. COORDINATE

WASTE PIPING WITH STRUCTURAL BEAM BELOW.

PROVIDE NEW SIDE BY SIDE DRINKING FOUNTAINS WITH

BOTTLE FILLERS (P-6). OFFSET HEIGHTS TO MATCH EXISTING.

6 RECONNECT EXISTING ICE MACHINE TO ANGLE STOP. PROVIDE

NEW SUPPLY HOSE. PIPE DRAINAGE FROM ICE MACHINE TO

FLOOR FUNNEL, LEAVING AN AIR GAP.

EXISTING SINK TO REMAIN.7

B

C

D

E

F

G

H

J

K

L

M

1 1 1 1

111111

STORAGE

LAUNDRY

201 203

QUIET

LOUNGE

JAN

LOUNGE

STAIR

NO. 2

STAIR

NO. 3

CORRIDOR

ELEC

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-112

L E

V E

L

P

L U

M B

IN

G

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-112

1 LEVEL 2 - PLUMBING PLAN

SHEET NOTES

1. EXISTING PLUMBING MAINS TO REMAIN. REUSE ANGLE

STOPS. PROVIDE NEW PLUMBING FIXTURES AND PIPING

DOWNSTREAM OF ANGLE STOPS. EXISTING PLUMBING

MAINS TO REMAIN. REUSE ANGLE STOPS. PROVIDE NEW

PLUMBING FIXTURES AND PIPING DOWNSTREAM OF ANGLE

STOPS.

SHEET KEYNOTES

PROVIDE THE FOLLOWING NEW PLUMBING FIXTURES PER

SUITE: (1) WATER CLOSET, (1) SHOWERHEAD, (1) BATHTUB

SPOUT, (1) SHOWER/BATHTUB COMBINATION VALVE, (1)

COUNTER MOUNT KITCHEN SINK, (2) COUNTER MOUNT

LAVATORIES, SEE M402 FOR TYPICAL LAYOUT.

PROVIDE NEW LAUNDRY SINK WITH FAUCET (P-5).

PROVIDE NEW WATER FOUNTAIN WITH BOTTLE FILLER (P-6).

B

C

D

E

F

G

H

J

K

L

M

1 1 1 1

111111

STAIR

NO. 2STORAGE

LAUNDRY

301 303

QUIET

LOUNGE

JAN

LOUNGE

CORRIDOR

316 STAIR

NO. 3

ELEC

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-113

L E

V E

L

P

L U

M B

IN

G

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-113

1 LEVEL 3 - PLUMBING PLAN

SHEET NOTES

1. EXISTING PLUMBING MAINS TO REMAIN. REUSE ANGLE

STOPS. PROVIDE NEW PLUMBING FIXTURES AND PIPING

DOWNSTREAM OF ANGLE STOPS.

SHEET KEYNOTES

PROVIDE THE FOLLOWING NEW PLUMBING FIXTURES PER

SUITE: (1) WATER CLOSET, (1) SHOWERHEAD, (1) BATHTUB

SPOUT, (1) SHOWER/BATHTUB COMBINATION VALVE, (1)

COUNTER MOUNT KITCHEN SINK, (2) COUNTER MOUNT

LAVATORIES, SEE M402 FOR TYPICAL LAYOUT.

PROVIDE NEW LAUNDRY SINK WITH FAUCET (P-5).

PROVIDE NEW WATER FOUNTAIN WITH BOTTLE FILLER (P-6).

B

C

D

E

F

G

H

J

K

L

M

MECH

PENTHOUSE

FAN ROOM

STAIR

NO. 2

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-114

R O

O F

P

L U

M B

IN

G

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-114

1 ROOF - PLUMBING PLAN

SHEET NOTES

1. NO WORK ON THIS SHEET.

B

C

D

E

F

G

H

J

K

L

M

M-401

UH-4

1.05.4

UH-2

1.05.4

UH-3

1.05.4

UH-7

1.05.4

UH-8

7.081

UH-5

7.081

FT-1

0.52.5'

UH-9

1.514

UH-10

1.514

UH-12

1.514

UH-14

0.54.0

UH-15

0.54.0

CUH-2

1.07.0

UH-13

0.54.0

UH-16

0.54.0

UH-17

0.54.0

UH-19

0.54.0

CUH-3

1.07.0

CUH-1

1.07.0

UH-11

1.514

UH-1

1.05.4

UH-6

1.03.0

3/4" GHS

2 1/2" GHS

2 1/2" GHS

2" GHR

2" GHR

2 1/2" GHS

1" GHR

3/4" GHR

3/4" GHS

3/4" GHR

1 1/2" GHR

2 1/2" GHS

2 1/2" GHS

3" GHS

3" GHS

3" GHR

3" GHS

3" GHR

1 1/2" GHS

3" GHR

1" GHS

SEISMIC

LOOPS

HARD PIPE EXPANSION

Z BEND IN VERTICAL

2" GHR

3/4" GHR

1 1/2" GHR

1 1/4" GHR

1 1/4" GHS

1" GHS

1" GHR

SNOW

BLOWER

STORAGE

STORAGE

BULK

STORAGE

BULK

STORAGE

STORAGE

ELECT.

BULK

STORAGE

JANITOR

CLOSET

OFFICE

FIRE

PROTECTION

BULK

STORAGE

H/W BOILER

ROOM

MECHANICAL

ROOM

STORAGE

NEW

CORRIDOR

STORAGE

CORRIDOR

HALL

STAIR

NO. 2

STAIR

NO. 3

STAIR

NO. 1

UH-25

1.06.9

UH-26

1.06.9

UH-28

1.06.9UH-27

1.06.9

5 5

5 5

PHC-01 HC-01

3 3

3 3 3

4 4

6 6

STORAGE

STORAGE

005A

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-120

B A

S E

M E

N T

H

Y D

R O

N

IC

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-120

1 BASEMENT - HYDRONIC PLAN

SHEET NOTES

1. WHERE PENETRATIONS THROUGH BLAST WINDOW JAMS

ARE REQUIRED SEE 4/M602 FOR DETAIL.

2. COORDINATE UNIT HEATER LOCATIONS WITH EXISTING

PIPING AND DUCTWORK.

SHEET KEYNOTES

PROVIDE FINNED TUBE WITH WALL-TO-WALL ENCLOSURE.

PROVIDE CABINET UNIT HEATER. SEE 2/M603 FOR DETAIL.

PROVIDE UNIT HEATER. SEE 3/M603 FOR DETAIL

PROVIDE UNIT HEATER. SEE 3/M602 FOR DETAIL.

CONNECT UNIT HEATER PIPING TO TERMINAL HEATING UNIT

CONNECTIONS DEMOLISHED BACK TO CEILING ON MD-120.

TO TERMINAL ABOVE.

B

C

D

E

F

G

H

J

K

L

M

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1111

UH-21

1.06.1

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.52'

FT-1

0.52.5'

FT-1

0.755.5'

FT-1

0.755.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.57'

FT-1

0.57'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.754.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

CUH-5

1.07.0

CUH-6

1.07.0

CUH-7

1.07.0

FT-1

0.52.5'

FT-1

1.05.5'

FT-1

1.06.5' 4

FT-1

1.58'

CUH-4

1.04.8

FT-1

18'

UH-20

1.06.1

FT-1

1.58.5'

MEN

WOMEN

LAUNDRY

STAIR

NO. 1

LOUNGE

QUIET ROOM

JAN

111 113 115

114112

STAIR

NO. 3

STAIR

NO. 2

CORRIDOR

ELEC

MAIL

COMPUTER

LOUNGE

STORAGE

HALL

STOR

OFFICE

FT-1

1.510.5'

FT-1

1.510.5'

FT-1

1.510.5' 4

ENTRANCE

Room

NO. 7

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-121

L E

V E

L

H

Y D

R O

N

IC

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-121

1 LEVEL 1 - HYDRONIC PLAN

SHEET NOTES

1. WHERE PENETRATIONS THROUGH BLAST WINDOW JAMS

ARE REQUIRED SEE 4/M602 FOR DETAIL.

SHEET KEYNOTES

PROVIDE FINNED TUBE WITH WALL-TO-WALL ENCLOSURE,

AND REPLACEMENT COVER FOR UNIT CONVECTOR. SEE

1/M603 FOR DETAIL.

PROVIDE CABINET UNIT HEATER. SEE 2/M603 FOR DETAIL.

PROVIDE UNIT HEATER. SEE 3/M603 FOR DETAIL.

PROVIDE FINNED TUBE WITH WALL-TO-WALL ENCLOSURE.

SEE 1/M602 FOR DETAIL.

PROVIDE CABINET UNIT HEATER. SEE 2/M602 FOR DETAIL.

PROVIDE UNIT HEATER. SEE 3/M602 FOR DETAIL.

B

C

D

E

F

G

H

J

K

L

M

1 1 11 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1111

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.754.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.57'

FT-1

0.57'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.754.5'

FT-1

0.54.5'

FT-1

0.54.5'

FT-1

0.52.5'

UH-22

0.54.0

CUH-8

1.07.0

CUH-9

1.07.0

STORAGE

LAUNDRY

201 203

QUIET

LOUNGE

JAN

LOUNGE

STAIR

NO. 2

STAIR

NO. 3

CORRIDOR

ELEC

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :3

P

M

M-122

L E

V E

L

H

Y D

R O

N

IC

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-122

1 LEVEL 2 - HYDRONIC PLAN

SHEET NOTES

1. WHERE PENETRATIONS THROUGH BLAST WINDOW JAMS

ARE REQUIRED SEE 4/M602 FOR DETAIL.

SHEET KEYNOTES

PROVIDE FINNED TUBE WITH WALL-TO-WALL ENCLOSURE,

AND REPLACEMENT COVER FOR UNIT CONVECTOR. SEE

1/M603 FOR DETAIL.

PROVIDE CABINET UNIT HEATER. SEE 2/M603 FOR DETAIL.

PROVIDE UNIT HEATER. SEE 3/M603 FOR DETAIL.

B

C

D

E

F

G

H

J

K

L

M

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1111

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.57'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.57'

FT-1

0.57'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.755.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.754.5'

FT-1

0.57'

UH-23

0.54.0

CUH-10

1.07.0

CUH-11

1.07.0

STAIR

NO. 2

STORAGE

LAUNDRY

QUIET

LOUNGE

JAN

LOUNGE

CORRIDOR

STAIR

NO. 3

ELEC

FT-1

0.52.5'

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-123

L E

V E

L

H

Y D

R O

N

IC

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-123

1 LEVEL 3 - HYDRONIC PLAN

SHEET NOTES

1. WHERE PENETRATIONS THROUGH BLAST WINDOW JAMS

ARE REQUIRED SEE 4/M602 FOR DETAIL.

SHEET KEYNOTES

PROVIDE FINNED TUBE WITH WALL-TO-WALL ENCLOSURE,

AND REPLACEMENT COVER FOR UNIT CONVECTOR. SEE

1/M603 FOR DETAIL.

PROVIDE CABINET UNIT HEATER. SEE 2/M603 FOR DETAIL.

PROVIDE UNIT HEATER. SEE 3/M603 FOR DETAIL.

B

C

D

E

F

G

H

J

K

L

M

UH-24

1.514

MECH

PENTHOUSE

FAN ROOM

STAIR

NO. 2

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-124

R O

O F

H

Y D

R O

N

IC

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-124

1 ROOF - HYDRONIC PLAN

SHEET NOTES

1. NOT USED

SHEET KEYNOTES

PROVIDE UNIT HEATER. SEE 3/M603 FOR DETAIL.1

C

C

C

C

C F

F F

F

F

F

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

A

B

C

D

E

F

G

H

J

K

L

M

M-401

VF-01

LV-01

9000 CFM

48"x30" EARG-01

1550 CFM

RG-01

2775 CFM

SG-01

2775 CFM

SG-01

1550 CFM

SG-01

4650 CFM

RG-01

4650 CFM

EG-01

300 CFM

SG-01

150 CFM

SG-01

120 CFM

SG-01

2775 CFM

SG-01

4325 CFM

EF-02

12"x8" SA

22"x22" SA

22"x22" EA

22"x22" SA 22"x22" EA

6"x6" SA

35"x30" RA

30"x20" SA

36"x28" SA

16"x16" SA

30"x25" RA

20"x20" SA

3/1 M-131

FOR DUCT

CONTINUATION

SEE

/1 M-131

FOR DUCT

CONTINUATION

SEE

2SNOW

BLOWER

STORAGE

STORAGE

BULK

STORAGE

BULK

STORAGE

STORAGE

ELECT.

BULK

STORAGE

JANITOR

CLOSET

OFFICE

FIRE

PROTECTION

BULK

STORAGE

H/W BOILER

ROOM

MECHANICAL

ROOM

STORAGE

NEW

CORRIDOR

STORAGE

CORRIDOR

HALL

36"x28" SA

M-301

STAIR

NO. 2

SG-01

150 CFM

12"x6" SA

HRV-01

STAIR

NO. 1

STAIR

NO. 3

MAINTENANCE

CLEARANCE

12"x16" EA

STORAGE

STORAGE

005A

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-130

B A

S E

M E

N T

V

E N

T

IL

A T

IO

N

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-130

1 BASEMENT - VENTILATION PLAN

SHEET NOTES

1. CLEAN DUCTWORK

2. PROVIDE TURNING VANES FOR ALL RECTANGULAR DUCT

CORNERS. NOT SHOWN FOR CLARITY.

SHEET KEYNOTES

PROVIDE 14" X 14" LOUVERED OPENING.

INTAKE AIR OPENING SHALL TERMINATE MIN 10 FT ABOVE

GRADE, SEE 2/M604 FOR DETAIL.

COORDINATE DUCT PENETRATION WITH EXISTING WINDOW

PENETRATION, SEE 2/M604 FOR DETAIL.

VF-01 INCLUDES MIXING BOX WITH RETURN AIR INLET ON

BOTTOM, NOT SHOWN IN PLAN VIEW.

COORDINATE DUCT PENETRATIONS THROUGH CEILING WITH

STRUCTURAL OPENING. SEAL PENETRATION WITH

INTUMESCENT CAULK AS PART OF A UL LISTED THROUGH-

PENETRATION ASSEMBLY FOR THE PARTICULAR

PENETRATION ELEMENT.

B

C

D

E

F

G

H

J

K

L

M

KF-01 KF-01 KF-01 KF-01 KF-01 KF-01KF-01KF-01KF-01

FOR DUCT

CONTINUATION

SEE /1 M-130

FOR DUCT

CONTINUATION

SEE /1 M-130

1 1

FOR DUCT

CONTINUATION

SEE /1 M-130

MEN

WOMEN

LAUNDRY

STAIR

NO. 1

LOUNGE

QUIET ROOM

JAN

111 113 115

114112

STAIR

NO. 3

STAIR

NO. 2

CORRIDOR

ELEC

MAIL

COMPUTER

LOUNGE

STORAGE

HALL

STOR

OFFICE

36"x28" SA1

M-301

ENTRANCE

24"x12"

22"x22" SA

22"x22" EA

22"x22" EA 22"x22" SA

RD-01

950 CFM

SD-01

475 CFM

SD-01

475 CFM

RD-01

290 CFM

SD-01

290 CFM

SD-01

475 CFM

SD-01

190 CFM

SD-01

475 CFM

RD-01

950 CFM

RD-01

950 CFM

RD-01

490 CFM

SD-01

245 CFM

SD-01

245 CFM

SD-01

245 CFM

RD-01

490 CFM

SD-01

245 CFM

10"ø EA

16"ø EA

18"ø EA

15"ø EA

12"ø EA

23"ø EA

12"ø EA 9"ø SA

9"ø SA 24"ø SA

22"ø SA

21"ø SA

19"ø SA

16"ø SA

14"ø SA

10"ø SA 12"ø SA

12"ø SA

8"ø SA

8"ø EA

8"ø EA

8"ø SA

9"ø SA

9"ø SA

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-131

L E

V E

L

V

E N

T

IL

A T

IO

N

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-131

1 LEVEL 1 - VENTILATION PLAN

SHEET NOTES

1. CLEAN DUCTWORK.

2. PROVIDE TURNING VANES FOR ALL RECTANGULAR DUCT

CORNERS. NOT SHOWN FOR CLARITY.

3. REMOVE, CLEAN AND REINSTALL ALL DIFFUSERS IN UNITS.

COORDINATE REMOVAL AND REINSTALLATION WITH

MODIFICATIONS TO CEILINGS AND WALLS.

SHEET KEYNOTES

COORDINATE DUCT PENETRATION WITH EXISTING WINDOW

PENETRATION.

TERMINATE DUCT WITH GOOSENECK 10FT ABOVE GRADE.

PROVIDE OFFSET FITTINGS AS NECESSARY TO PREVENT

BLOCKING LEVEL 1 WINDOWS.

PROVIDE ABA ROCKER SWITCH TO OPERATE RANGE HOOD.

B

C

D

E

F

G

H

J

K

L

M

KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01

STORAGE

LAUNDRY

201 203

QUIET

LOUNGE

JAN

LOUNGE

STAIR

NO. 2

STAIR

NO. 3

ELEC

CORRIDOR

24"x12"

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-132

L E

V E

L

V

E N

T

IL

A T

IO

N

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-132

1 LEVEL 2 - VENTILATION PLAN

SHEET NOTES

1. CLEAN DUCTWORK.

2. REMOVE, CLEAN AND REINSTALL ALL DIFFUSERS IN UNITS.

COORDINATE REINSTALLATION WITH MODIFICATIONS TO

CEILINGS AND WALLS.

B

C

D

E

F

G

H

J

K

L

M

KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01 KF-01

STAIR

NO. 2

STORAGE

LAUNDRY

301 303

QUIET

LOUNGE

JAN

LOUNGE

CORRIDOR

316 STAIR

NO. 3

ELEC

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-133

L E

V E

L

V

E N

T

IL

A T

IO

N

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-133

1 LEVEL 3 - VENTILATION PLAN

SHEET NOTES

1. CLEAN DUCTWORK.

2. REMOVE, CLEAN AND REINSTALL ALL DIFFUSERS IN UNITS.

COORDINATE REMOVAL AND REINSTALLATION WITH

MODIFICATIONS TO CEILINGS AND WALLS.

B

C

D

E

F

G

H

J

K

L

M

EF-01

SF-01

MECH

PENTHOUSE

FAN ROOM

STAIR

NO. 2

SCALE:

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

3/32" = 1' - 0"

8' 8' 16' 24'

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-134

R O

O F

V

E N

T

IL

A T

IO

N

P L

A N

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

3/32" = 1'-0"M-134

1 ROOF - VENTILATION PLAN

SHEET NOTES

1. CLEAN DUCTWORK

SHEET KEYNOTES

PROVIDE NEW SUPPLY AND EXHAUST FANS. CLEAN UNIT

AND APPURTENANCES. ADD CARBON MONOXIDE

DETECTION.

28"x36" SA

(E) WINDOW

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

REVISIONS

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :4

P

M

M-301

M E

C H

A N

IC

A

L S

E C

T

IO

N S

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

1/2" = 1'-0"M-301

1 VF-1 OSA HOOD

14 15 16

H

HX-1

ET-1

UH-18

0.54.0

CP-6B

CP-6A CP-5B

CP-5A

CP-4B

CP-4A

CP-3B

CP-3A

CP-2B

CP-2A

CP-1B

CP-1A

AS-1

3" GHS

3" GHR

MECHANICAL

ROOM

GMT-1

30"x20" SA

3" GHR

SG-01

4650 CFM

1/2" = 1'-0"M-401

1 BASEMENT LARGE SCALE PLAN - MECHANICAL ROOM 012

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

REVISIONS

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

M-401

B A

S E

M E

N T

L A

R G

E S

C A

L E

P L

A N

M

E C

H A

N

IC

A L

R O

O M

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

No. Date Item

SHEET NOTES

1. CIRCULATOR PUMPS LAID OUT AS SHOWN FOR CLAIRITY,

CONTRACTOR TO FIELD COORDINATE ACTUAL PUMP

LOCATIONS FOR MECHANICAL ROOM ACCESS AND PUMP

MAINTENANCE.

15 16 17

B

D

P-2 P-2

P-3

P-1

P-4

KF-01

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

PLAN NORTH

REVISIONS

1 2 4 19

B

H

M

A

A B

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

M-402

T Y

P

IC

A L

F L

O O

R P

L A

N

R O

O M

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

1/2" = 1'-0"M-402

1 TYPICAL FLOOR PLAN - ROOM 113

SHEET NOTES

1. WHERE PENETRATIONS THROUGH BLAST WINDOW JAMS

ARE REQUIRED SEE 4M602 FOR DETAIL.

SHEET KEYNOTES

FINNED TUBE, FT-1, SEE FLOOR HEATING PLANS FOR

LENGTH AND FLOW.

M

SPECIFIC NOTES:

14" MIN

15MOISTURE SEPARATOR

BOD SPIRAX SARCO 4" S4A

THERMODYNAMIC STEAM TRAP ASSEMBLY

50 LBS/HR

FLASH TANK BOD SPIRAX SARCO

PMO 8

PRDV BYPASS VALVE

4,140 LBS/HR, 80 PSIG INLET, 15 PSIG OUTLET

1/3 STEAM PRDV VALVE

1,380 LBS/HR @ 15 PSIG

Cv = 9.37

CONTROL VALVE BYPASS

2,686 LBS/HR, 15 PSIG INLET, 2 PSIG OUTLET

F&T STEAM TRAP ASSMEBLY

5,372 LBS/HR @ 1/2 PSIG

CONDENSATE RECEIVER

8" DIAMETER, 36" LENGTH, 3" VENT

PRESSURE POWERED CONDENSATE PUMP

5,466 LBS/HR @ 30 PSI BACK PRESSURE

40 PSIG MOTIVE FORCE BOD SPIRAX SARCO PTC 3X2

4" ST (15#) TO WH-01

STEAM VENT TO OUTSIDE, CONNECT TO

EXISTING

STEAM PRESSURE RELIEF

10,000 LBS/HR @ 25 PSIG

16 STEAM VENT TO OUTSIDE, CONNECT TO EXISTING

2/3 STEAM PRDV VALVE

2,760 LBS/HR @ 15 PSIG

Cv = 18.74

1/3 STEAM CONTROL VALVE

895 LBS/HR @ 2 PSIG

Cv = 19.38

2/3 STEAM CONTROL VALVE

1,791 LBS/HR @ 2 PSIG

Cv = 38.76

17 STEAM PRDV VALVE

40 LBS/HR @ 40 PSIG

18 F&T STEAM TRAP ASSEMBLY

50 LBS/HR

TO UTILIDOR

UTILITY PIT

EXTERIOR

(E) 4" ST (80#)

3/4" CR

3" CR

3/4" CR(E) 6" ST (80#)

DRIP LEG, TYP.

4" ST (80#) 6" ST (15#)

6" ST (2#)

HX-01

4" ST (15#)

3" ST (80#)

2 1/2" ST

(80#)

6" ST (15#)

4" ST (15#)

4" ST (15#)

3" ST (15

6" ST (2#)

6" ST (15#)

4" ST (80#)

6" ST (2#)

6" ST (15#)

6" ST (2#)

2" CR

2" CR

3/4" CR

2" CR

1" CR

M

IN

3" CR

WH-01

OVERFLOW

TRAP, ROUTE

TO DRAIN

1-1/2 INCH DIAMETER CONDENSATE METER

BADGER METER INDUSTRIAL TURBO METER OR EQUAL,

STAINLESS STEEL ONLY

NC

NC NC

SIGHT GAUGE

20 3/4" ST (40#) TO PRESSURE POWERED

CONDENSATE PUMP IN H/W BOILER ROOM 011

M-601

TYP.

M-601

3" CR

1" ST

DRIP PAN ELBOW, TYP.

SPECIFIC NOTES:

PRESSURE POWERED CONDENSATE PUMP

1,414 LBS/HR @ 30 PSI BACK PRESSURE 40

PSIG MOTIVE FORCE BOD SPIRAX SARCO

PTC 2X2

F&T STEAM TRAP ASSEMBLY

50 LBS/HR

CONDENSATE RECEIVER TANK 4"

DIAMETER, 36" LENGTH

PROVIDE DRIP PAN ELBOW, ROUTE

DRAIN TO WASTE

VENT TO OUTSIDE. CONNECT TO

EXISTING VENT THROUGH ROOF

ROUTE PIPE BETWEEN CONTROL VALVE

AND WATER HEATER CONNECTION TO

BE AS SHORT AS POSSIBLE

3/4" CR

SIGHT GAUGE

1-1/12" VENT

43/4" ST (40#)

FROM MECH.

ROOM

TO MECH. ROOM

UNION ORIFICE AS

REQUIRED PER

MANUFACTURER

4" ST (15#)

1-1/2" MIN PRV DISCHARGE

ROUTE TO NEAREST FLOOR DRAIN

TS

TO BUILDING

HOT WATER

FROM BUILDING COLD

WATER/HOT WATER RECIRC.

M

IN

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

REVISIONS

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

M-601

S T

E A

M P

L A

N T

D

IA

G R

A M

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

NO SCALEM-601

1 STEAM PLANT PIPING DIAGRAM

1. INSTALL ALL STEAM AND CONDENSATE PIPING AND ACCESSORIES IN

ACCORDANCE WITH EIELSON AIR FORCE BASE STANDARDS.

2. INSTALL DRAIN COCK AT ALL LOW POINTS.

3. DRIP LEGS TO BE 6" MINIMUM.

4. SLOPE CONDENSATE PIPING IN DIRECTION OF FLOW.

5. PROVIDE PIG TAIL AND ISOLATION VALVE FOR ALL PRESSURE GAUGES

ON STEAM PIPING.

6. PROVIDE LIQUID FILLED PRESSURE GAUGE ON CONDENSATE PUMP

DISCHARGE.

7. ORIENT BLOWDOWN DISCHARGE TO BE AWAY FROM OPERATOR WHILE

OPENING VALVE.

8. SUPPORT HEAT EXCHANGER FROM FLOOR MOUNTED STAND.

9. ROTATE CONTROL VALVES SUCH THAT THE ACTUATORS ARE TILTED

45 DEGREES FROM VERTICAL AWAY FROM WALL PLANE.

10. ORIENT PRESSURE GAUGE DISPLAY SUCH THAT READING CAN BE

OBSERVED FROM GROUND LEVEL.

11. ALL CONDENSATE RETURN PIPING 3/4 INCH UNLESS OTHERWISE

NOTED.

12. ALL STEAM STRAINER BASKETS TO BE INSTALLED IN HORIZONTAL

POSITION.

13. ALL STEAM PIPING TO USE ECCENTRIC REDUCERS.

14. ROUTE SENSING LINE FROM PRDV TO COMMON LINE WITH ASSOCIATED

PRESSURE GAUGE.

15. INSULATE ALL STEAM/CONDENSATE PIPING, EQUIPMENT, AND

ACCESSORIES WITHIN MECHANICAL ROOM. PROVIDE ABRASION

RESISTANT JACKETING OVER INSULATION.

16. ALL STEAM PIPING TO BE SCHEDULE 40 BLACK STEEL.

17. ALL CONDENSATE PIPING TO BE SCHEDULE 80 BLACK STEEL.

18. GALVANIZED, COPPER, OR BRASS PIPE/ FITTINGS/ ACCESSORIES

SPECIFICALLY NOT ALLOWED IN STEAM/CONDENSATE SYSTEMS.

19. INSTALL TRAP ASSEMBLY FOR PRESSURE PUMP AS LOW AS POSSIBLE.

20. ROUTE CONDENSATE RECEIVER OVERFLOW TO NEAREST FLOOR

DRAIN.

21. INSTALL DRIP PAN ELBOWS IN STEAM VENT PIPES WHEREVER PIPE

CHANGES FROM HORIZONTAL TO VERTICAL. INSTALL PER

MANUFACTURER'S RECOMMENDATIONS AND ROUTE DRAIN TO WASTE.

GENERAL NOTES

No. Date Item

NOT TO SCALEM-601

2 TYPICAL F&T STEAM TRAP ASSEMBLY

1/4" = 1'-0"M-601

3 WATER HEATER STEAM PIPING DIAGRAM

FINNED TUBE HEATING ELEMENT

UNION, TYP.

2-WAY CONTROL VALVE

BALANCE VALVE

VALVED LOW POINT DRAIN

WITH CAPPED HOSE ADAPTOR

RETURN TO MAIN

SUPPLY FROM MAIN

VALVED HIGH POINT AIR VENT

ON SUPPLY BRANCH

ENCLOSURE

ACCESS PANEL, TYP.

ISOLATION VALVE, TYP.

NOTE: ALL VALVES

AND OTHER PIPING

ACCESSORIES SHALL

BE CONTAINED WITHIN

THE ENCLOSURE AND

SHALL BE ACCESSIBLE

OR PROVIDED WITH

ACCESS PANELS.

RETURN UNDER ENCLOSURE

VALVED HIGH POINT AIR

VENT

SUPPLY FROM

MAIN

RETURN TO

MAIN

FILTER

BALANCE

VALVE

ISOLATION VALVE,

TYP

2-WAY CONTROL

VALVE

FAN

HEATING COIL

UNION,

TYP

VALVED LOW POINT

DRAIN WITH CAPPED

HOSE ADAPTOR

FLOOR

NOTE: ALL VALVES AND OTHER

PIPING ACCESSORIES SHALL BE

CONTAINED WITHIN THE

CABINET AND SHALL BE

ACCESSIBLE OR PROVIDED

WITH ACCESS PANELS.

2-WAY 2-POSITION CONTROL VALVE

FLEXIBLE CONNECTION, TYP

UNION, TYP

UNIT HEATER HEATING COIL

VALVED HIGH POINT MANUAL

AIR VENT

VALVED LOW POINT DRAIN

WITH CAPPED HOSE ADAPTOR

BALANCE VALVE, TYP

ISOLATION VALVE, TYP

SUPPLY FROM MAIN

RETURN TO MAIN

TUBING INSULATOR

SHEET METAL SCREW

GLYCOL SUPPLY OR RETURN PIPE

BLAST WINDOW JAM

REINFORCEMENT C-CHANNEL,

SEE STRUCTURAL

1-3/8" HOLE MAXIMUM,

CENTERED ON CHANNEL,

NOTE: IF MORE THAN ONE

PENETRATION IS REQUIRED

ENSURE MINIMUM SEPARATION

OF 5 HOLE DIAMETERS.

SEISMIC JOINT

ANCHOR

MAX 24"

NOTES:

1. LOCATE EXPANSION LOOP AS CLOSE AS POSSIBLE TO SEISMIC JOINT.

2. PROVIDE NESTED EXPANSION LOOPS FOR ADJACENT PIPING RUNS, MAINTAIN

MAINTENANCE CLEARANCES.

3. ANCHORS ARE DESIGNED TO SUPPORT THE ENTIRE PIPE LOAD INCLUDING FLUID.

4. PROVIDE 60% ETHYLENE GLYCOL RATED FLEX LOOP FOR HYDRONIC PIPING.

5. PROVIDE NSF 61 APPENDIX G/371 AND NSF 372 CERTIFIED FLEX LOOP FOR POTABLE

WATER PIPING.

6. ALL FLEX LOOPS SHALL BE LISTED FOR PRESSURE, TEMPERATURE, SERVICE FLUID,

AND MOVEMENT FOR EACH APPLICATION. LOOP MOVEMENT RATINGS PER

STRUCTURAL DRAWINGS.

7. LOOP SHOWN VERTICAL FOR CLARITY. ORIENT LOOP IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS.

ANCHOR

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

REVISIONS

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

M-602

H Y

D R

O N

IC

D

E T

A

IL

S

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

NO SCALEM-602

1 FINNED TUBE DETAIL

NO SCALEM-602

2 CABINET UNIT HEATER PIPING DIAGRAM

NO SCALEM-602

3 UNIT HEATER PIPING DETAIL

NO SCALEM-602

4 BLAST WINDOW JAM REINFORCEMENT DETAIL

NOT TO SCALEM-602

5 SEISMIC EXPANSION JOINT PIPING DIAGRAM

FINNED TUBE HEATING ELEMENT

UNION, TYP.

VALVED LOW POINT DRAIN

WITH CAPPED HOSE ADAPTOR

VALVED HIGH POINT AIR VENT

ON SUPPLY BRANCH

ENCLOSURE

ACCESS PANEL, TYP.

ISOLATION VALVE, TYP.

NOTE: ALL VALVES

AND OTHER PIPING

ACCESSORIES SHALL

BE CONTAINED WITHIN

THE CABINET AND

SHALL BE ACCESSIBLE

OR PROVIDED WITH

ACCESS PANELS.

GHS/ GHR THROUGH HOUSING

INTO SPACE CREATED BY

DEMOLITION OF CONVECTOR,

CONNECT TO EXISTING PIPING

VALVED HIGH POINT AIR

VENT

SUPPLY FROM

MAIN

RETURN TO

MAIN

WALL

FILTER

BALANCE

VALVE

ISOLATION VALVE,

TYP

2-WAY CONTROL

VALVE

FAN

HEATING COIL

UNION,

TYP

VALVED LOW POINT

DRAIN WITH CAPPED

HOSE ADAPTOR

FLOOR

NOTE: ALL VALVES AND OTHER

PIPING ACCESSORIES SHALL BE

CONTAINED WITHIN THE

CABINET AND SHALL BE

ACCESSIBLE OR PROVIDED

WITH ACCESS PANELS.

2-WAY 2-POSITION CONTROL VALVE

FLEXIBLE CONNECTION, TYP

UNION, TYP

UNIT HEATER HEATING COIL

VALVED HIGH POINT MANUAL

AIR VENT

VALVED LOW POINT DRAIN

WITH CAPPED HOSE ADAPTOR

BALANCE VALVE, TYP

ISOLATION VALVE, TYP

SUPPLY FROM MAIN

RETURN TO MAIN

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

REVISIONS

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

M-603

E X

IS

T

IN

G

H Y

D R

O N

IC

D

E T

A

IL

S

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

NO SCALEM-603

1 EXISTING FINNED TUBE DETAIL

NO SCALEM-603

2 EXISTING CABINET UNIT HEATER PIPING DIAGRAM

NO SCALEM-603

3 EXISTING UNIT HEATER PIPING DETAIL

INSULATION

1" x 1" BIRDSCREEN

EXTERIOR WALL

SEAL VAPOR

BARRIER

PENETRATION

SEAL EXTERIOR

WALL

PENETRATION

WEATHER TIGHT

SLOPED TO DRAIN

NOTE: PROVIDE HINGES ON BIRDSCREEN TO

FACILITATE CLEANING.

SEE FLOOR PLANS FOR DUCT SIZE

16 GA GALVANIZED STEEL

DUCT. ETCH, PRIME

AND PAINT CUSTOM

COLOR PER ARCH

1" BIRD SCREEN

1" MESH SCREEN. ANGLE

IRON TO REINFORCE HOOD

AS NECESSARY

R=W/2

PROVIDE SUPPORTS PER

SMACNA STANDARDS

16 GA GALVANIZED STEEL

DUCT. ETCH, PRIME

AND PAINT CUSTOM

COLOR PER ARCH

W

.4

.1

A

E C

C

A u ro ra D ri v e

F a ir b a n k s A la s k a

P R

O J

E C

T

S H

E E

T T

IT

L

E

DESIGN

DRAWN

CHECKED

DATE

PROJECT No.

SHEET NUMBER

C O

N S

U L

T A

N T

REVISIONS

C

U s e rs

\m ic h a e lb a rt e ll \D o c u m e n ts \P

D C

-M E

C H

-1 F

B R

V M ic h a e lB a rt e ll .r v t

/1

/2

:5 :5

P

M

M-604

M E

C H

A N

IC

A

L D

E T

A

IL

S

FTQW 08-1036

F -3

R

E N

O V

A T

E P

E R

M A

N E

N T

P A

R T

Y D

O R

M

IT

O R

Y B

U

IL

D

IN

G

C

IV

IL

E N

G

IN

E E

R S

Q U

A D

R O

N

E

IE

L S

O N

A F

B A

L A

S K

A

CPF

MEB

MAF

NOVEMBER 16, 2018

FINAL (100%) DESIGN, FOR CONSTRUCTION NOVEMBER 16, 2018

NO SCALEM-604

1 INTAKE HOOD DETAIL

NO SCALEM-604

2 GOOSENECK DETAIIL

SEQUENCE OF OPERATIONS

1.1 GENERAL

A. ALL WORK OUTLINED HERE SHALL BE CONTROLLED BY THE BAS AND

CONNECTED TO THE BAS UNLESS OTHERWISE NOTED. THE

GRAPHICS AND THE MONITORING AND CONTROL TAGS SHALL BE

FULLY INTEGRATED INTO THE HOST SYSTEM.

B. ALL POINTS AND ALARMS NOTED HERE SHALL BE DISPLAYED ON THE

NEW LOCAL WORK STATION AND THE EXISTING GRAPHICAL USER

INTERFACE FOR MONITORING AND CONTROLLING THE BUILDING. ALL

SAFETY SHUTDOWNS SHALL BE HARDWIRED AND SHALL NOT BE

DEPENDENT ON THE BUILDING AUTOMATION SYSTEM (BAS) FOR

OPERATION.

C. EAFB STANDARD PROGRAMMING ABBREVIATIONS SHALL BE UTILIZED.

IF PACKAGED CONTROL PANELS ARE USED, PROVIDE ADDITIONAL

SENSORS IN THE FIELD FOR BAS MONITORING OF POINTS NOTED

UNDER EACH SECTION. PROVIDE 10 PERCENT SPARE CAPACITY FOR

FUTURE USE AT EACH PANEL.

D. ALL ALARMS BASED ON A DEVIATION FROM SETPOINT (I.E. 2 DEGREES

F ABOVE SETPOINT) THAT EXPERIENCES AN OFFSET, SUCH AS AN

OUTSIDE AIR RESET SCHEDULE, SHALL NOT BE FIXED BUT RATHER

MOVE WITH THE SETPOINT.

E. TERMINAL CONTROLLERS, ACTUATORS, SENSORS, AND ASSOCIATED

COMPONENTS ARE TO BE NAMED/ADDRESSED BASED ON THE ROOM

THEY ARE IN.

1.2 GRAPHICAL USER INTERFACE

A. ALL VALUES AND SETPOINTS NOTED WITHIN THE SEQUENCE OF

OPERATION ARE TO BE PROVIDED ON THE GRAPHICAL USER

INTERFACE FOR MONITORING AND CONTROLLING THE BUILDING.

ADDITIONAL POINTS SHALL BE PROVIDED AS REQUIRED TO

TROUBLESHOOT SYSTEM OPERATION.

B. FOR EACH POINT, PROVIDE THE POINT DESCRIPTION, ADDRESS, AND

VALUE.

C. ALL POINTS OUTLINED SHALL BE ADDRESSABLE THROUGH THE SAME

MEANS. ALL POINTS SHALL BE PROGRAMMABLE FROM THE HOST

COMPUTER AND GRAPHICS SHALL BE PREPARED FOR ALL POINTS.

ALL SETPOINTS SHALL BE ADJUSTABLE THROUGH THE GRAPHICS.

D. A GENERAL SYSTEM ALARM NOTIFICATION SHALL BE VISIBLE ON ALL

GRAPHICS. ALARMS SHALL BE COLLECTED ON A CENTRAL ALARM

PAGE. ALARMS GENERATED SHALL BE DOCUMENTED AND NOT

ERASED EVEN IF THE SYSTEMS HAVE AN AUTOMATIC RESET

FUNCTION.

E. FAIL POSITION FOR SPRING-WOUND ACTUATED VALVES AND

DAMPERS ARE TO BE NOTED ON THE GRAPHICS. A DESCRIPTOR

RELATING THE VOLTAGE PROVIDED TO THE ACTUATOR AND THE

DEVICES FIELD POSITION SHALL BE SHOWN ON THE GRAPHICS (I.E. "0

IS CLOSED, 10 IS OPEN").

1.3 ALARMS

A. AN ALARM SHALL INDICATE THE POINT, POINT NAME, AND STATUS.

THERE SHALL BE TWO LEVELS OF ALARMS: CRITICAL AND

MAINTENANCE. ALARM LEVELS SHALL BE IMPLEMENTED AS PER THE

INPUT/OUTPUT/ALARM SUMMARY.

B. CRITICAL ALARMS: WHENEVER A CRITICAL ALARM IS ANNUNCIATED,

ANNUNCIATE THE ALARM AT THE REMOTE WORKSTATIONS AND AT

THE LOCAL WORKSTATIONS. UTILIZE TCP/IP NETWORK

COMMUNICATIONS TO ANNUNCIATE ALARMS AT THE REMOTE

WORKSTATIONS. ALL CRITICAL ALARMS SHALL BE LATCHING. EACH

ALARM SHALL REQUIRE OPERATOR ACKNOWLEDGEMENT BEFORE

CLEARING. DO NOT REPEAT ALARM UNLESS PREVIOUSLY CLEARED.

PROVIDE CAPABILITY TO CLEAR CRITICAL ALARMS AT THE REMOTE

WORKSTATIONS AND THE LOCAL WORKSTATIONS.

C. MAINTENANCE ALARMS: LOG WARNING ALARMS IN THE CONTROLLER

MEMORY. MAINTAIN WARNING ALARM LOGS FOR THE PREVIOUS

THREE (3) DAYS BEFORE OVERWRITING, SEGREGATED INTO 24-HOUR

PERIODS.

D. ALARM SHALL ANNUNCIATE ONCE AFTER LATCHING. ONCE CLEARED,

IT SHALL REPEAT IF ALARM RETURNS.

1.4 EQUIPMENT STARTUP

START MECHANICAL EQUIPMENT IN SEQUENCE WITH TIME DELAY

BETWEEN STARTS TO…