JA-1_Synopsis_of_Work.pdf
PDF 12 KB Posted
- Attached to
- F-35 Renovate Permanent Party Dorm (B2662) Federal contract opportunity
- Solicitation number
- FA500419BA008
About this file
Synopsis of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MFR_for_FBO.pdf | ||
| Solicitation_Amendment_-_FA500419BA0080004.pdf | ||
| Solicitation_Amendment_FA500419BA0080004_SF_30.pdf | ||
| Perm_Party_Dorm_Q&As.pdf | ||
| Solicitation_Amendment_FA500419BA0080003_SF30.pdf | ||
| JA-6_Wage_Determination(14_June_2019).pdf | ||
| Solicitation_Amendment_FA500419BA0080002_SF30.pdf | ||
| FA500419BA0080001.pdf | ||
| FA500419BA0080001_SF_30.pdf | ||
| JA-3_Drawings_pt2.pdf | ||
| Solicitation_-_FA500419BA008.pdf | ||
| JA-2_Drawings_pt1.pdf | ||
| JA-7_Bid_Schedule.pdf | ||
| JA-5_Specifications.pdf | ||
| JA-4_Submittal_Register.pdf | ||
| JA-6_Wage_Determination_19_Apr_19.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS OF WORK
PROJECT TITLE: F-35 Renovate (B2262) Permanent Party Dorm
LOCATION: EIELSON AFB, ALASKA
PROJECT: FTQW 08-1036
DESCRIPTION OF WORK:
The purpose of this project is to renovate and repair Building 2262 to house permanent party airmen associated with the beddown of the F-35A fighter aircraft. Work shall include architectural, structural, mechanical, electrical, communications and security upgrades, as well as hazardous material abatement.
The architectural scope of this project is to repair and patch existing exterior paint, match existing, replace interior and exterior doors (also to include frames and hardware as indicated in the project drawings), replace windows (also to include jambs, insulation, surrounding vapor retarder, gypsum board, sills, and coverings as indicated in the project drawings), replace wall finishes, replace floor finishes, and replace amenities, all where indicated in the project drawings. Also, an appropriately fire-rated corridor shall be constructed from the fire pump room to the exit corridor, and a snowblower room shall be constructed where indicated in the project drawings.
The structural scope of work of this project is to construct an opening in the basement to allow for cooling of mechanical equipment, and to construct a ramp leading into what will be the snowblower room.
The electrical scope of work for this project is to install upgraded power, lighting, and lightning protection systems. Commissioning of said systems shall be required where indicated in the project specifications.
The communications scope of work for this project is to provide telecommunications hardware where indicated in the project drawings.
The security scope of work for this project is to upgrade door access to card readers as indicated in the project drawings and specifications.
Abatement of hazardous materials and selective demolition shall be performed per the project drawings and specifications.
Construction schedule shall be standard working hours as is authorized by the government:
Monday thru Friday, 7AM to 4:30PM.
END OF SYNOPSIS