JA-2_Specifications.pdf

PDF 967 KB Posted

Attached to
Lightning and Surge Protection Federal contract opportunity
Solicitation number
FA5004-17-B-C001
Issued by
Department of the Air Force Pacific Air Forces

About this file

JA-2 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Lightning and Surge Protection, newest first.
File Type Posted
Questions_and_Answers__2.pdf PDF
Bldg_4371_photos.pdf PDF
Questions_and_Answers.pdf PDF
Bldg_1227_photos.pdf PDF
Bldg_1228_photos.pdf PDF
Bldg_1338_photos.pdf PDF
Site_Visit_Sign_In.pdf PDF
Bldg_1338_Extension_photos.pdf PDF
FA5004-17-B-C001-0002.pdf PDF
JA-5_Site_Map_and_Drawings.pdf PDF
FA5004-17-B-C001-0001.pdf PDF
JA-4_AF_Form_66.pdf PDF
JA-2_Specifications.pdf PDF
JA-6_Asbestos_Surveys.pdf PDF
JA-1_Other_Contract_Requirements.pdf PDF
JA-3_Wage_Determination.pdf PDF
JA-5_Site_Map_and_Drawings.pdf PDF
FA5004-17-B-C001.pdf PDF
JA-6_Asbestos_Surveys.pdf PDF
JA-3_Wage_Determination.pdf PDF
JA-5_Site_Map_and_Drawings.pdf PDF
JA-4_AF_Form_66.pdf PDF
JA-1_Other_Contract_Requirements.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIGHTNING AND SURGE PROTECTION

SYSTEMS IMPROVEMENTS

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SPECIFICATION INDEX

Design Alaska, Inc. Index ‐ 1

DIVISION 01 GENERAL REQUIREMENTS

01010 Description of Work and Coordination

01030 Safety Environmental Protection, Regulations, and Codes

01045 Cutting and Patching

01073 Explanations: Drawings and Specifications

01080 Existing Utilities

01120 Alteration Project Procedures

01300 Submittals

01400 Quality Control

01500 Construction Facilities and Temporary Controls

01580 Project Identification Sign

01600 Products and Substitutions

01700 Contract Closeout

DIVISION 26 ELECTRICAL

26 05 01 General Provisions

26 05 05 Codes, Permits and Fees

26 05 08 Tests and Inspections

26 05 09 Manuals and Record Documents

26 05 19 Wire Conductors and Cable

26 05 26 Grounding and Bonding

26 05 33 Raceways

26 05 34 Outlet Boxes

26 05 35 Pull and Junction Boxes

26 05 53 Identification

26 05 90 Fastening Hardware

26 41 00 Lightning Protection System

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 01

GENERAL PROVISIONS

Design Alaska, Inc. 26 05 01 ‐ 1

PART 1 GENERAL

1.1 SCOPE: SECTION 26 05 01 ‐ GENERAL PROVISIONS

A. This Section covers general electrical requirements for Work covered under Divisions 26 and 28.

B. All Work and Services specifically covered under this Division is supplementary to that covered under other Divisions of these Contract Documents. The requirements of this Division, which are more stringent than that covered under other parts of these Contract Documents, apply to Work covered under this Division.

C. All incidental Work required but not specified under this Division shall comply with the Division in which it is specified.

D. Review the Drawings and Specifications of all other Divisions for additional Work under Division 26.

1.2 DEFINITIONS

A. Furnish:Shall mean deliver to the project site.

B. Install: Shall mean build into the work, including connections and any parts commonly considered as incidental to a complete installation.

C. Provide: Shall mean furnish and install complete.

D. Work or Project: Shall mean all work required by the Contract Agreement.

1.3 ABBREVIATIONS AND INITIALS

A. Any or all of the following may appear in the Contract Documents, and shall be applied per the following explanations:

a.c. or AC Alternating Current (60 Hz. unless otherwise noted) AFF Above Finished Floor AFG Above Finished Grade AIC Amperes Interrupting Capacity (RMS Symmetrical) ANSI American National Standards Institute ASTM American Society for Testing and Materials AWG American Wire Gauge Size

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 2 d.c. or DC Direct Current

EMT Electrical Metallic Tubing

GND Ground GFCI Ground Fault Circuit Interrupter

Hertz or Hz Frequency in Cycles per Second HP Horsepower

ICEA Insulated Cable Engineers Association IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society IMC Intermediate Metal Conduit

LTG Lighting

MSS Motor Starting Switch MCC Motor Control Center

NEC National Electrical Code NESC National Electrical Safety Code NECA National Electrical Contractors Association, Inc.

NEMA National Electrical Manufacturers Association NIC Not in Contract NIE Not in Electrical

O.L. Motor Overload Devices OSHA Occupational Safety and Health Administration

RSC Rigid Steel Conduit

UL Underwriter's Laboratories

VAC or VDC Volts, AC or DC, respectively

B. Other abbreviations and initials, which may appear in the Contract Documents, are intended to have the meanings commonly accepted in the electrical construction industry, and the Contracting Officer shall be contacted for definition if any question arises concerning them.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 3

1.4 DRAWINGS

A. Unless otherwise indicated, drawing symbols conform to the applicable standards of ANSI. The Drawings (or Contract Drawings) rely heavily upon symbolic representation of the features shown, and represent exact details only so far as indicated. The following should also be kept in mind:

1. The Drawings are, to some extent, diagrammatic and are not intended to show exact details.

2. Dimensions scaled from the Drawings may vary due to tracing tolerances, printing distortion, field conditions, field changes, and other factors. For these reasons, it shall be the Contractor's responsibility to field‐verify dimensions that pertain to his work. The Contractor shall make minor relocations where necessary to resolve conflicts or present a uniform appearance. The Drawings show exact location of electrical features only where specifically dimensioned.

3. The Electrical Contractor shall review the Contract Documents of the other trades on the Project, and shall coordinate the installation of electrical features with the work of all other trades. In areas such as mechanical rooms where conflicts are likely with structural, mechanical, or other features, the electrical installation shall be performed after the other trades, and arranged to eliminate conflicts.

4. The Drawings and Specifications are complementary to each other and what is called for by one shall be as binding as if called for by all. Discrepancies between any combination of Drawings, specification, and/or field conditions shall be promptly brought to the attention of the Owner for a decision. Failure to obtain such decision before proceeding shall automatically leave the Contractor liable for all expenses necessary to correct the situation to the satisfaction of the Owner.

5. Provide fixtures, devices, equipment, conduit, conductors and accessories indicated on the drawings unless it is specifically indicated that the fixture, device, equipment, conduit, conductor, or accessory is existing.

1.5 GENERAL REQUIREMENTS

A. Provide all work as shown on the Drawings and in these Specifications for a complete, safe, and functional installation.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 4

B. The Contractor is responsible for providing a complete and operating facility. The intention of the Contract Documents is to include all labor and materials, equipment, and transportation necessary or reasonably inferable as being necessary for the execution of the work. Where minor adjustments of the work are necessary for purposes of fabrication or installation of items or resolution of conflicts between items within the intent of the Contract Documents, the Contractor shall make such adjustments at no added expense to the Owner. Where such adjustments affect functional or aesthetic design of the work, they shall first be submitted to the Contracting Officer for review and approval.

C. Unless otherwise noted, all materials shall be of new manufacture and installed before expiration of their shelf life, if applicable.

D. Materials and equipment are to be those of major and reputable manufacturers with ability to render competent and thorough service through local and regional organizations capable of expeditiously providing service, parts, and assistance.

E. Materials of similar nature, style, function, purpose and/or appearance shall be like products from the standard product line of the same manufacturer.

F. All products shall be listed and labeled by an approved national testing laboratory for their intended use and location in all cases where such products are listed and labeled. Where no product listed by an approved national testing laboratory for the application is available, provide certification of performance, function and rating from an independent testing agency or laboratory approved by the Contracting Officer.

G. The omission of express reference to any parts, supplies, services, or facilities necessary for, or incidental to, a complete installation shall not be construed as a release from furnishing such items at no additional cost to the Government.

H. Any deviations from the installation shown in these Contract Documents, due to a particular manufacturer's requirements, shall be made without additional cost to the Government.

I. Verification is required of all equipment sizes and locations prior to the ordering or installation of connection materials and disconnecting equipment to ensure that the power connections are of the proper size and type, and in the proper location. Verify all electrical loads (voltage, phase, full load amperes, number and point of connections, minimum circuit ampacity, etc.) for equipment furnished under all divisions of this specification, by reviewing respective shop drawings furnished under each division. Meet with each subcontractor furnishing equipment requiring electrical service and review electrical characteristics. Report any variances from electrical characteristics noted on the drawings with the Contracting Officer before proceeding with rough work. Obtain and review the equipment shop drawings to determine particular final connection requirements before rough‐in begins for each equipment item.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 5

J. All materials shall be installed in a neat, orderly, and secure fashion, as required by these specifications and commonly recognized standards of good workmanship. The norms for execution of the work shall be in conformity with NEC Chapter 3 and the National Electrical Contractors’ Association “National Electrical Installation Standards”, for which the Contracting Officer's judgment shall be final.

K. Electrical equipment shall be installed in spaces that are accessible and in a manner that allows for maintenance and replacement. Entries into spaces shall allow for the passage of equipment. Coordinate the final locations with piping, ducts and equipment of other trades to insure proper access for all trades. Coordinate location of concealed equipment, disconnects and boxes with access panels and doors.

1.6 WIRING OF MECHANICAL EQUIPMENT, MOTORS, AND OTHER UTILIZATION EQUIPMENT

A. Where equipment arrangement varies from that shown on the Drawings, making necessary additional disconnect switches in order to comply with the NEC, such disconnects shall be provided at no additional cost to the Owner.

B. The Electrical Contractor shall provide connection of each motor to its respective controller. The final 18 inches to 36 inches of each connection to a motor shall be made through flexible metal conduit, per Section 26 05 33 “Raceways”.

C. Where disconnects or controllers are furnished as part of the mechanical or other utilization equipment, such as in package units, the Electrical Contractor shall provide all power wiring to the equipment and associated disconnects and controllers.

1.7 REPAIR OF EXISTING FEATURES

A. Where existing or previously‐completed building surfaces or other features must be cut, penetrated, or otherwise altered for the installation of electrical features, such work shall be carefully laid out and performed, and any subsequent patching or repairs that it necessitates shall be performed by skilled mechanics of the trades involved, at no additional cost to the Owner.

1.8 WORK INCIDENTAL TO SUBSTITUTIONS

A. When substitutions for specified Methods or materials alter the relationship between the Work actually required and that called for by the Contract Documents, the Contractor shall bear responsibility for all expenses incurred by any necessary revisions, including the Work of other trades.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 6

1.9 REMOVAL OF ELECTRICAL WORK IN EXISTING FACILITIES

A. Where connected to or serving fixtures or equipment being removed, or incidental to the required removal of walls, ceilings, or other features, existing electrical features shall be removed as follows:

1. All abandoned wiring shall be removed back to its source of supply.

2. Exposed items shall be removed in their entirety.

a. All abandoned exposed conduit, including all abandoned conduit above accessible ceiling finishes shall be removed back to the source of supply, or back to the connection to a still active branch. Cap and properly close all openings in remaining conduits, boxes and enclosures.

3. Concealed items may be abandoned in place if they are completely concealed by the existing construction.

a. Conduits concealed in areas not accessible or that are not being made accessible shall be removed into areas of non‐accessibility. Patch to match existing, openings in walls, ceilings, or floors left or created as a result of conduit removal.

b. Conduits that are being removed and that extend below slab on grade shall be ground flush with the top of the slab, plugged with concrete, and the slab patched to match existing.

4. Where other electrical items are fed through, supported by or attached to a removed item, reroute raceways and/or cut back building surfaces as necessary to rejoin raceways, provide new conductors as necessary, and patch and finish all damaged construction to match surrounding surfaces.

5. Salvage or disposal of removed items shall be as noted on the drawings, or as directed by the Owner.

B. All existing equipment left remaining shall be maintained in service. When encountered in work, whether shown on the drawings or not, protect, brace and support existing items.

If existing active electrical services are encountered that require relocation in order to execute general, electrical or mechanical work, relocate services as required and as directed without additional cost to the Owner. Any equipment which is not specifically indicated for removal or is not shown or noted shall remain in service.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 7

1.10 VAPOR BARRIER PENETRATIONS

A. Penetrations of the building vapor barrier caused by the electrical installation shall be minimized, and where they do occur they shall be sealed as elsewhere described in these Specifications.

1.11 FIRESTOPPING

A. Where electrical raceways or other features penetrate fire‐rated building surfaces, they shall be securely sealed to the surrounding surface with 3M Fire Barrier Caulk No. CP25, intumescent coatings as elsewhere described in these Specifications for the general construction, or other equal.

1.12 ELECTRICAL WORK EXPOSED TO WEATHER

A. Provide corrosion protection for all ferrous metal portions of electrical work items exposed to weather including conduit, clamps, supports, disconnect switches and other items.

B. All ferrous metal shall be hot‐dip galvanized after fabrication, painted or cadmium plated, or similarly protected against corrosion. Approval of painting material and methods is required.

C. All enclosures and equipment shall be weathertight and shall be NEMA rated for the environment.

D. Arrange all equipment in such a fashion as to prevent a buildup of water or other weather related issues that may result in premature failure of the device, damage of materials or other potential public safety hazards.

1.13 PROTECTION AND CLEANING

A. All electrical equipment shall, during the entire duration of construction work, be protected against water, dust, debris, overspray or any other contamination, whether environmental in origin or as a result of construction work.

B. All construction dust, debris, overspray, scrap and surplus materials, etc., resulting from this Work shall be cleared away, leaving the installation in completely clean condition.

C. Clean up all equipment to factory condition. Use touch‐up paint where required. All cleaning shall be in accordance with the manufacturer’s recommendations.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 01 ‐ 8

D. These cleaning requirements apply not only to exterior surfaces, but also interiors of accessible enclosures. In particular, the interiors of equipment having contacts or heat dissipating components shall be thoroughly vacuum‐cleaned prior to energizing.

1.14 SERVICE INTERRUPTIONS

A. All Work covered by this Contract shall be performed on de‐energized circuits. Where such de‐energization would deprive the Owner of existing service, the Contractor shall give him at least 24 hours advance notice of the outage, or more if the Owner requires.

The Contractor will not necessarily be entitled to any extra compensation or time extension for the Owner’s inability to grant an outage at a time convenient to the Contractor.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 05

CODES, PERMITS AND FEES

Design Alaska, Inc. 26 05 05 ‐ 1

1.1 SCOPE: SECTION 26 05 05 ‐ CODES, PERMITS AND FEES

A. This Section covers general electrical code requirements for work covered under this Division.

1.2 CODES

A. All work shall comply with the latest adopted editions of:

1. The National Electrical Code.

2. The National Electrical Safety Code.

3. The NFPA Codes.

4. OSHA Regulations.

5. Applicable standards of NEMA, and ANSI.

6. The National Electrical Installation Standards (NEIS) by the National Electrical Contractors Association (NECA).

7. Previous editions of the above, where required by Federal, State or Local laws and regulations.

8. All applicable Federal, State and Local laws and regulations.

1.3 WAIVERS & INTERPRETATIONS

A. Where the authority having jurisdiction grants waivers or less stringent interpretations of the foregoing, they shall not constitute a release from strict application of these requirements, unless specifically accepted by the Government.

1.4 PERMITS AND FEES

A. Obtain and pay for all permits required for the work covered by this Division of the Specifications.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 05

CODES, PERMITS AND FEES

Design Alaska, Inc. 26 05 05 ‐ 2

PART 2 PRODUCTS (NOT USED)

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 08

TESTS AND INSPECTIONS

Design Alaska, Inc. 26 05 08 ‐ 1

1.1 SCOPE: SECTION 26 05 08 ‐ TESTS AND INSPECTIONS

A. This Section covers the requirements for contractor provided testing of the work and other inspections as required by the contract documents and/or the Government.

1.2 TESTS AND INSPECTIONS

A. In addition to any tests required elsewhere in these Specifications, the Owner may require appropriate tests and/or uncovering of any electrical features whose integrity they have reason to doubt. Such tests may include, but are not limited to, continuity, circuit resistance, and insulation resistance of circuits and equipment, including wires, cables, and grounding. Where such tests or uncovering are required, the Contractor shall furnish all personnel, equipment, and services necessary to conduct the tests, and/or uncovering and subsequent reconstruction.

B. In addition to any inspections required elsewhere in these specifications or requested by the Owner, the Owner may conduct periodic inspections of the work, as they deem appropriate. For all inspections, the Contractor shall make available qualified electrical personnel to answer questions, demonstrate operation of completed features of the work, provide safe access to enclosures, and the like.

C. Upon completion of the testing, the Contractor shall prepare a written statement for the Owner's signature, attesting to the fact that the tests were successfully completed and all equipment performed properly. A signed copy of this statement shall be bound into each copy of the Operation and Maintenance Manuals.

PART 2 PRODUCTS (NOT USED)

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 09

MANUALS AND RECORD DOCUMENTS

Design Alaska, Inc. 26 05 09 ‐ 1

1.1 SCOPE: SECTION 26 05 09 ‐ MANUALS AND RECORD DOCUMENTS

A. This Section covers general electrical record document requirements for work covered under this Division along with any Manuals or documentation required by these specifications.

1.2 OPERATION AND MAINTENANCE MANUALS

A. Operation and Maintenance Manuals (O&M) shall be submitted for acceptance under the provisions of Section 01700. Included in these Operation and Maintenance Manuals shall be the following:

1. All information included in the final accepted submittals, modified as necessary to reflect the final as‐built condition. Catalog information shall include data on each item installed and not the complete “line” of the manufacturer.

2. Complete listings of repair and replacement parts for all equipment, and names and addresses of the suppliers from which the equipment was obtained.

3. Complete listing of all equipment which may require periodic servicing, with recommended schedules and complete instructions for performing said servicing.

Service instructions shall include complete English‐language narrative descriptions and illustrations as necessary to thoroughly describe all service operations. Illustrations with just multi‐language skeleton instructions are not acceptable.

4. Riser diagrams and Shop Drawings of all signaling systems and/or fire alarm related systems.

5. Minimum character size shall be 1/16‐inch on all diagrams. Drawings shall be 11 inches x 17 inches in size, and shall be generated using CAD software such as AutoCAD. Drawings may be scaled to fit the 11 inch x 17 inch format, as device placement and identification are of more importance than scaled floor plans.

6. Group the O&M data sequentially in an orderly arrangement in CSI format by specification section.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 09

MANUALS AND RECORD DOCUMENTS

Design Alaska, Inc. 26 05 09 ‐ 2

1.3 RECORD DOCUMENTS

A. The Electrical Contractor shall at all times keep a current set of Contract Drawings on the project site. This set shall be kept in good condition, and shall be neatly and accurately marked to show the as‐built condition of the electrical installation. Of particular importance are the precise locations of buried or otherwise concealed features such as conductors, raceways, and junction boxes.

B. The field‐marked set of drawings described in (A.) shall be made available to the Project Manager or by an authorized representative for spot‐checking at every inspection.

C. Upon completion of the project, the field‐marked set of drawings described in (A.) shall be forwarded to the Project Manager, along with any supplementary drawings, sketches, notes, or other materials necessary to completely describe the as‐built condition of the electrical installation.

PART 2 PRODUCTS (NOT USED)

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 19

WIRE CONDUCTORS AND CABLE

Design Alaska, Inc. 26 05 19 ‐ 1

1.1 SCOPE: SECTION 26 05 19 ‐ WIRE CONDUCTORS AND CABLE

A. Provide 600 volt building wire and cable as shown on the drawings and further specified herein. All wire and cable shall conform to the latest specifications of the NEC and/or the ICEA. Acceptable manufacturers include, but are not limited to, the following: American Insulated Wire, BICC General, Carol Cable, Excel Wire & Cable, Okonite, Southwire, Superior Essex, or equal.

B. All wire and cable sizes noted on the drawings are for copper conductors, and copper conductors only shall be used for building wire throughout the entire installation.

PART 2 PRODUCTS

2.1 CONDUCTORS

A. All conductors shall be copper, except as otherwise noted. Conductors No. 10 AWG and smaller shall be stranded or solid. Conductors No. 8 AWG or larger shall be stranded.

2.2 INSULATION TYPES

A. Branch circuit conductors shall be 600 volt insulated, and unless otherwise noted on the drawings, shall have the following insulation types:

1. Heated indoor spaces ‐ THHN/THWN or XHHW.

2. Outdoors or other cold locations where exposed to temperatures less than 32 degrees F ‐ XHHW.

B. Feeder conductors shall have type XHHW insulation.

C. Nylon‐jacketed conductors such as types THHN or THWN shall not be used in any location subjected to ambient temperatures below 32 degrees F.

D. Special applications: Conductors in fluorescent fixture wiring channels shall have 90 degrees C insulation rating, types THHN, XHHW, or equal. Conductors in high temperature locations shall have one of the high temperature insulation types suitable for the use and as permitted by the NEC.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 19 ‐ 2

PART 3 EXECUTION

3.1 COLOR CODING

A. Conductors No. 6 AWG and smaller shall be color‐coded by factory pigmentation of the insulation. Larger conductors may be color‐coded by wrapping the ends with colored tape in all enclosures, except that white (or gray) and green conductors may never be phase‐taped for any use other than neutral and ground, respectively. Color‐coding throughout the entire installation shall be as follows:

Conductor 208Y/120 480Y/277 Phase A Black Brown Phase B Red Orange Phase C Blue Yellow Neutral White Gray Ground Green Green

3.2 INSTALLATION

A. Install cable in accordance with NECA Standards of Installation.

B. Branch circuit conductors shall be No. 12 AWG copper, except for the following:

1. On 120 volt, 20 amp circuits over 70 feet (actual measured one‐way distance) from panel to the last receptacle or middle of the lighting string (as appropriate), use No. 10 conductors for the entire circuit.

2. Where branch circuit conductor sizes are indicated on the drawings, they shall take precedence over the foregoing. Where field conditions dictate circuit routings that increase conductor lengths beyond what would be expected from the layout shown on the drawings, they shall be submitted to the Owner for acceptance.

C. All conductor connections shall be made up securely with solderless pressure connectors such as setscrew lugs, wirenuts, "wingnuts", insulated tap connectors, insulation piercing tap connectors, or suitable crimp fittings. Split bolt connector shall not be used. Where the connector manufacturer does not require twisting together of conductors, conductors shall be left untwisted.

D. Use compression type connectors for copper wire splices and taps, #6 AWG and larger.

Utilize heat shrink tubing of the proper voltage rating for uninsulated conductors and connectors.

E. Thoroughly clean wires before installing lugs and connectors.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 19 ‐ 3

F. Make splices, taps and terminations to carry full ampacity of conductors without perceptible temperature rise.

G. Terminate spare conductors with wire nuts.

H. Where stranded conductors are used, their ends shall be terminated with crimp‐on connectors (T & B Sta‐Kon, or equal), set screw lugs, box lugs, or self‐lifting pressure terminals.

I. Flexible cords shall be connected to equipment, fixtures, boxes, or other enclosures only by means of cord‐grip bodies or other strain‐relief fittings specifically designed for the purpose.

J. Where conductors or their connectors are to be connected to metal surfaces, the surface shall first be scraped free of any paint, oxide, or other non‐conductive substances. Where there is a possibility of corrosion due to moisture or other cause, a conductive corrosion inhibitor shall be used between the conductor and the metal surface.

K. Where compression fittings are used to terminate conductors operating under 600 volts, the fitting shall have a viewport, or other approved method, so that it can be verified that the conductor is properly seated in the connector.

L. Conductor terminations shall use the manufacturer’s recommended methods and hardware unless specifically noted otherwise.

M. Conductors shall be pulled into raceways only by constant‐tension pulling methods.

Where necessary, wire‐pulling lubricants of a type that is not harmful to conductor insulation and will not harden shall be used.

N. Completely and thoroughly swab raceway system before installing conductors.

O. Neatly train and lace wiring inside boxes, equipment and panelboards.

P. All conductors shall be protected from damage. Where the conductor or insulation is damaged, the Owner may require, at no cost to the Owner, the replacement of the entire conductor, or the implementation of an approved repair method approved by the Owner.

Q. Provide dedicated neutral conductors to branch circuits where neutral conductors are required. Multi‐wire branch circuits are not permitted. Use of handle tied breakers to provide simultaneous disconnection of ungrounded conductors for multi‐wire branch circuits is not permitted unless specifically called out elsewhere in these contract documents.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 19 ‐ 4

3.3 SEPARATION OF SYSTEMS

A. Wiring of different voltage levels, frequency, current characteristics (AC & DC) or functions (normal vs. emergency) shall not share the same raceway or enclosures unless specifically shown on the drawings or permitted by the Owner, or inherently necessary for correct system function (i.e., at transfer switches, transformers, etc.).

B. For A.C. Variable Frequency Drives and Inverters of any kind, conductors for supply, load, and control functions shall not share the same raceway.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 26

GROUNDING AND BONDING

Design Alaska, Inc. 26 05 26 ‐ 1

1.1 SCOPE: SECTION 26 05 26 ‐ GROUNDING AND BONDING

A. All metal raceways, enclosures, and other electrical equipment, as well as non‐electrical equipment that may pick up harmful potentials from the electrical system, shall be securely bonded and grounded as required by the NEC, the Drawings, and this Specification.

B. Provide communication system grounding conductor at point of service entrance and connect to building service ground.

C. Provide a separate, insulated equipment grounding conductor inside all feeder and branch circuit conduits.

PART 2 PRODUCTS

2.1 CONDUCTORS

A. All grounding conductors and bonding jumpers shall be copper (absolutely no aluminum substitution permitted), sized according to the NEC. Where separate equipment grounding conductors are called for, they shall be green insulated where run with branch circuits and feeders.

2.2 GROUND RODS

A. Ground rods shall be 3/4‐inch by 10 feet‐0 inches, except where longer rods are called for on the Drawings, in which case they shall be 3/4‐inch diameter sectional type, length as indicated. All ground rods shall be copper‐coated steel, "Copperweld" or equal.

2.3 HARDWARE

A. Clamps, lugs, connectors, bonding bushings, and all other such grounding and bonding hardware shall be approved for the purpose; shall be made of hot‐dip galvanized steel, or bronze or other corrosion‐resistant alloy. Acceptable manufacturers include, but are not limited to, the following: O.Z. Gedney, T & B, 89, or any other manufacturer meeting the requirements of the contract documents. No split bolt connectors allowed.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 26 ‐ 2

2.4 BURIED OR EMBEDDED GROUNDING CONNECTIONS

A. All buried or embedded grounding connections shall be made only by means of exothermic welds, copper "Ampact" taps, or irreversible hydraulically‐crimped fittings specifically designed for the purpose.

PART 3 EXECUTION

3.1 CONCEALED CONNECTIONS

A. Permanent grounding connections, where permitted by the NEC to be concealed, shall not be so concealed until inspected and accepted by the Owner or their authorized representative. Failure to comply with this requirement will make the contractor liable for any expenses incurred in the process of re‐exposing the connections for inspection, and subsequent repair and patching of the concealing construction, including the work of other trades. The Contractor shall schedule inspection of such connections at least one week in advance of concealment, and will not be entitled to any additional compensation or time extension for delays caused by inability of the Owner or their representative to be available at the desired time.

3.2 GROUNDING CONDUCTOR RACEWAY BONDING

A. All grounding electrode conductors run in metal raceways shall be bonded to the raceway at both ends. At grounding electrodes, compliance with NEC requirements for conduit connection to the electrode will satisfy this requirement.

3.3 CONCENTRIC AND ECCENTRIC KNOCKOUTS

A. In addition to the NEC requirements for service equipment, metal raceways throughout the project shall be provided with bonding bushings and NEC‐sized bonding jumpers where they enter enclosures through concentric or eccentric knockouts, reducing washers, or other arrangements that may be disturbed by relative movement between raceway and enclosure.

3.4 EXTERNAL BONDING JUMPERS

A. Where the NEC permits grounding conductors external to, but routed with, a raceway, such routing shall be accomplished by spiraling the conductor around the raceway no more than two revolutions.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 26 ‐ 3

3.5 FIELD QUALITY CONTROL

A. Inspect grounding and bonding system conductors and connections for tightness and proper installation.

B. Grounding and bonding conductors shall be terminated using a separate terminal for each conductor.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 33

RACEWAYS

Design Alaska, Inc. 26 05 33 ‐ 1

1.1 SCOPE: SECTION 26 05 33 ‐ RACEWAYS

A. All conductors shall be run in metal raceways as follows unless of a Metal Clad (MC) type cable assembly or otherwise noted on the Drawings.

1.2 APPLICATIONS

A. Feeder Raceways ‐ Rigid Steel Conduit (RSC). Electrical Metallic Tubing (EMT) may be used for indoor feeder raceways where not subject to physical damage.

B. Raceways Buried in Ground or Under Slab or Encased in Concrete ‐ Rigid Steel Conduit

(RSC).

C. Branch Raceways ‐ Unless otherwise shown, raceways concealed in non‐concrete walls or above suspended ceilings shall be Electrical Metallic Tubing (EMT); exposed raceways shall be EMT in mechanical and electrical spaces, shops and other similar unfinished type areas with exposed devices and features, and shall be surface metal raceway in finished areas.

D. The substitution of Intermediate Metal Conduit for Rigid Steel Conduit where permitted by the NEC is permitted by this Specification, except for the following applications:

1. Buried raceways.

2. RSC and IMC shall not be intermixed in any conduit run unless a pullbox or conduit body is provided between them.

E. The final connection to any motor or other rotating or vibrating equipment, or equipment which may require position adjustment after installation shall be made through a slack section of flexible metal conduit 18 inches to 36 inches long. For such connections to pump motors, and to equipment in damp, wet, or exterior locations or in Mechanical Rooms, the flex shall be of the oil‐resistant liquid‐tight type.

F. Other raceways shall be as noted on the Drawings or further specified herein.

G. Nonferrous metal conduit is not permitted unless specifically noted.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 33 ‐ 2

PART 2 PRODUCTS

2.1 TYPE

A. Minimum size for all raceways shall be 1/2‐inch diameter. Minimum size of conduit for home‐runs shall be 3/4‐inch diameter.

B. Raceways shall be of types and characteristics recognized by the NEC.

2.2 QUALITY ASSURANCE

A. Conduit and fittings shall be standard types and sizes as manufactured by a nationally recognized manufacturer of this type of materials and be in conformity with applicable standards and UL listings.

2.3 CONDUIT AND TUBING

A. Rigid Steel Conduit shall be hot‐dip galvanized, Schedule 40 Dimensions with smooth interior. Acceptable manufacturers include, but are not limited to the following: Allied Tube & Conduit, J & L, Triangle, Western Tube & Conduit, Youngstown, or equal.

B. Rigid Steel Conduit shall be made up with threaded fittings only.

C. Electrical Metallic Tubing shall be hot‐dip galvanized, with smooth interior. Acceptable manufacturers include, but are not limited to the following: Allied Tube & Conduit, J & L, Triangle, Western Tube & Conduit, Youngstown, or equal.

1. EMT shall be made up with concrete‐tight compression fittings. Provide rain‐tight compression EMT fittings for exterior locations. Connectors shall have insulated throats.

D. Intermediate Metal Conduit shall be hot‐dip galvanized steel, with smooth interior.

Acceptable manufacturers include, but are not limited to the following: Allied Tube & Conduit, Cyprus, Western Tube & Conduit, or equal.

1. IMC shall be made up with threaded fittings only.

E. Flexible Metal Conduit ("flex") shall be Greenfield type, made of interlocking galvanized steel armor. Acceptable manufacturers include, but are not limited to the following:

Alflex, American Metal, Carol Cable Co., Electri‐flex, National Electric, Thomas & Betts, Triangle, or equal.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 33 ‐ 3

F. Liquid‐tight Flexible Metal Conduit ("sealtite" flex or "LT flex") shall have a flexible galvanized steel spiral core with a flexible outer jacket of PVC, resistant to water, oil, grease, corrosive agents, and abrasion. Acceptable manufacturers include, but are not limited to the following: Carol, Anaconda, or equal.

1. Fittings for liquid‐tight flexible conduit shall be steel or malleable iron of a type incorporating a threaded grounding cone, nylon or plastic compression ring, and a tightening gland, providing a low resistance ground connection. All throats shall be insulated.

2. Exterior or other extreme temperature applications of Liquid Flexible Metal Conduit shall have temperature rating of minus 67 degrees Fahrenheit to plus 220 degrees F, Liquatite “ATLA”, or equal.

3. If used without a separate equipment grounding conductor, liquid‐tight flex shall have a continuous copper ground wire integral with its construction, and shall be made up with fittings approved for grounding.

G. Surface Metal Raceways shall be installed complete with the manufacturer's standard hardware appropriate to the installation. Surface metal raceways shall be steel, one piece design with a base and cover factory assembled. The raceway shall have minimum dimensions of 0.50‐inch wide by 0.34‐inch deep unless other sizes and styles are noted on the Drawings or specified in other sections of these Specifications.

2.4 WIREWAYS AND GUTTERS

A. Unless otherwise noted, wireways and gutters shall be similar to pull and junction boxes in construction, with screw covers.

B. Wireways and gutters shall be used only where shown on the drawings or specifically accepted by the Owner. Auxiliary gutters which are used at distribution panelboards and other service equipment is not subject to this owner acceptance requirement.

PART 3 EXECUTION

3.1 LAYOUT

A. Raceways shall be concealed, except in mechanical and electrical rooms and as otherwise noted on the drawings. Exposed raceways shall be run square with the building lines.

Concealed raceways shall be run perpendicular or parallel to walls, and shall be grouped together to minimize congestion where practical.

B. Unless otherwise noted on the Drawings or directed by the Government, branch circuit raceways shall be sized per the NEC tables.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 33 ‐ 4

C. Structural members shall not be cut, drilled, or notched for raceways or other electrical features unless specifically accepted by the Government.

D. Underfloor raceways for slab‐on‐grade construction shall be embedded in the fill under the slab, not in the slab itself. Where raceways are required or permitted to be embedded in concrete, the thickness of concrete on all sides of each raceway shall not be less than 2 inches.

E. Metal raceways crossing expansion joints, and in other required places, shall make provision for 3‐way movement at such points. Such fittings shall be installed so that they are initially in the center of all 3 axes of movement (i.e.: not deflected to make part of a conduit bend, or compressed or extended to compensate for incorrect conduit length).

F. At all raceway penetrations of the vapor barrier provide a double splice patch (one on each side of vapor barrier) by cutting a square piece of vapor barrier 12 inches larger on all sides than the pipe. Cut a round hole in the center of the square splice patch, smaller than the pipe, to form a stretched fit. Force the pipe through the splice patch and tape all sides to the vapor barrier and seal the vapor barrier to the pipe at the penetration with an adhesive compatible with the vapor barrier material.

G. Provide solid blocking installed flat at all vapor barrier penetrations. On the interior face of the exterior stud wall, flat blocking installed at each penetration shall be a minimum of four inches larger than the penetration. Locate the penetration at the centerline of the flat blocking.

H. All raceways running from a warm area to a cold area, and all raceways passing through penetrations in vapor barriers, shall be securely sealed inside the warm end with ductseal, a silicone compound not harmful to the wire insulation, or equal.

I. Maintain a minimum 6‐inch clearance between conduit and piping. Maintain 12‐inch clearance between conduit and heat sources such as flues, steam pipes, heating pipes, and heating appliances.

J. Pull wires shall be provided in all spare and unused conduits. (Nylon “jet‐line” or equal).

K. Where electrical raceways must penetrate roofing membranes, such penetrations shall be flashed and sealed as required for mechanical piping penetrations of roof.

L. Raceways shall be installed in switchboards, panelboards, gutters, pull boxes and the like from the back of the enclosure closest to the mounting surface, to the front in a manner that will not obstruct the future installation of raceways.

M. The ceiling grid and ceiling support wire shall not be used for raceway support. Support all wiring from the structural ceiling. Fixture wire support may be used for flexible wiring but shall not be used for supporting other raceway types.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 33 ‐ 5

N. Panelboard, switchgear and motor control center enclosures, and enclosures for other similar equipment shall not be used for through wiring. Only manufacturer installed wiring shall be allowed to run between such enclosures which have multiple sections.

O. Do not route raceways on floor unless specifically shown on drawings.

3.2 ASSEMBLY

A. Raceways shall be physically and electrically continuous from enclosure to enclosure.

Electrical continuity for nonmetallic conduits shall be assured by inclusion of an NEC‐sized grounding conductor. For metallic conduits, it shall be assured by making up all joints wrench‐tight and free of foreign materials. Threaded conduits shall enter enclosures by means of threaded hubs or double‐locknut‐and bushing connections. For conduits of one inch trade size and larger, bushings shall be of the insulated type.

B. Conduit joints shall be cut square, reamed smooth, and cleaned of burrs, cutting oil, cuttings, and other foreign materials prior to assembly. Ends shall be capped to prevent entrance of foreign materials during construction.

C. Bends, offsets, and saddles shall be made with factory elbows and fittings, or field‐made with approved benders, to not less than NEC‐required radii.

D. Raceways shall be securely fastened in place at NEC‐required intervals and at each elbow by means of malleable one‐hole straps, clamp‐backs where necessary, two‐hole sheetmetal straps, or other approved devices; all with fastening hardware per Section 26 05 90 “Fastening Hardware”. Wire shall not be used for fastening raceways. The use of adjustable "trapeze" hangers made of U‐channel strut suspended by threaded rods is encouraged for the support of groups of parallel conduits. Conduits shall be secured to each such trapeze by means of the strut manufacturer's standard conduit clamps or by J‐ bolts, with U‐bolts at elbows and ends of runs.

E. Use a junction box at transitions between different types of raceway. Exception: Use one piece manufactured transition fittings between rigid and flexible conduit. Use manufactured transition fitting between conduit and multi‐outlet assembly.

F. Where connecting HDPE conduits is required, the conduit shall be joined by fusion splicing or with other products listed specifically and designed for this purpose.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 34

OUTLET BOXES

Design Alaska, Inc. 26 05 34 ‐ 1

1.1 SCOPE: SECTION 26 05 34 ‐ OUTLET BOXES

A. Provide outlet boxes for connection of branch circuits to fixtures and devices as shown on the plans and further specified herein.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Boxes shall be the products of Raco, Steel City, Appleton, Crouse‐Hinds, or equal.

2.2 TYPES AND SIZES

A. Boxes shall be deep‐type (2‐1/8 inches nominal) unless space limitations or drawing notes require shallower boxes. Boxes shall be as follows:

1. Fixture outlet boxes for use with concealed raceway systems shall be 4 inches octagonal or square, galvanized sheet steel.

2. Boxes for wall‐mounted devices with concealed raceways shall be galvanized sheet steel, 4 inches square for up to two devices, and solid ganged boxes for more than two devices.

3. Ceiling‐mounted boxes for use with exposed raceways shall be galvanized sheet steel.

4. Cast boxes with threaded hubs, external mounting brackets or holes, and gasketed covers shall be used in the following locations:

a. Exterior locations.

b. Wet or Damp locations.

c. Mechanical and other areas where subject to physical damage.

d. Adjacent to water or steam connections.

a. Hazardous Classified areas; Class II Div 1 and Div 2. Boxes in these locations shall be rated for the environment as shown on the drawings.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 34 ‐ 2

5. Exposed interior locations below 8 feet above finished floor, for use with exposed raceway systems, shall be of the threaded‐hub cast metal type, with matching cover suitable for the device being installed.

PART 3 EXECUTION

3.1 COORDINATION OF LOCATIONS

A. Provide electrical boxes as shown on the drawings, and as required for splices, taps, wire pulling, equipment connections and code compliance.

B. Electrical box locations shown on the drawings are approximate unless dimensioned.

Verify location of floor boxes prior to rough‐in.

C. Locate and install boxes to allow access. Where installation is inaccessible, coordinate locations and sizes of required access doors.

D. Locate and install to maintain headroom and to present a neat appearance.

3.2 INSTALLATION

A. Outlet boxes shall be installed plumb with, and securely fastened to the structural framing of, the surrounding construction.

B. Recessed boxes shall have the correct plaster rings and recess distances so that the device cover plates are tight to the wall or ceiling finish.

C. No through‐wall boxes will be permitted. Where outlets are shown mounted back‐to‐ back on a common wall, they shall be offset horizontally a minimum of 12 inches, to minimize sound transmission.

D. Install boxes in walls without damaging wall insulation.

E. Coordinate mounting heights and locations of outlets mounted above counters, benches, and backsplashes.

F. Where sheetmetal boxes penetrate the building vapor barrier, their exterior surfaces shall be completely covered with overlapped application of vapor‐barrier tape to effectively seal all unused knockouts and other holes against vapor migration. The edges of the hole in the vapor barrier shall be securely sealed to the lip of the box with vapor barrier tape and/or an adhesive compatible with the vapor barrier material.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

Design Alaska, Inc. 26 05 34 ‐ 3

G. Provide the best suitable box for each outlet requirement. Extension rings should not be used on new construction except where needed to bring an outlet box to 1/8‐inch of the finished wall or ceiling, or where required by specific device requirements. No more than one extension ring should be used for each outlet box.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 35

PULL AND JUNCTION BOXES

Design Alaska, Inc. 26 05 35 ‐ 1

1.1 SCOPE: SECTION 26 05 35 ‐ PULL AND JUNCTION BOXES

A. This Section covers general electrical requirements for work covered under this Division.

1.2 PULL BOXES

A. Where necessary in raceway systems to facilitate conductor installation, provide pull boxes as further specified herein. At the minimum, raceway runs shall have a pullbox every 100 feet or after every 360 degrees of bends.

1.3 JUNCTION BOXES

A. Where shown on the plans or where otherwise necessary to tap, terminate, or redirect raceway runs, provide junction boxes as specified herein.

1.4 SUBMITTALS

A. Submit manufacturer's product data and specifications.

B. Submit product data showing configurations, finishes, dimensions, and manufacturer's instructions.

PART 2 PRODUCTS

2.1 SIZES

A. Unless otherwise noted on the Drawings, pull and junction boxes shall be sized according to NEC requirements for the number, size, and entry configuration of the conduits and conductors entering them.

2.2 BRANCH CIRCUITS

A. Unless otherwise noted on the Drawings, pull and junction boxes for branch circuit raceways shall be outlet boxes as specified in Section 26 05 34 “Outlet Boxes”, with matching blank covers.

EIELSON AFB, ALASKA

PROJECT NO.: FTQW 06‐1002A

SECTION 26 05 35

PULL AND JUNCTION BOXES

Design Alaska, Inc. 26 05 35 ‐ 2

2.3 FEEDER AND OTHER PULL AND JUNCTION BOXES

A. For larger than branch circuit raceways and conductors, and where noted on the drawings, pull and junction boxes shall be made of Code‐gauge sheet steel with baked enamel or galvanized finish. Surface‐mounted boxes shall have removable screw covers.

Flush‐mounted boxes shall have flush trim and hinged door with lockable latch, keyed same as panelboards.

PART 3 EXECUTION

3.1 INSTALLATION

A. Pull and junction boxes shall not be installed in visible locations in finished areas unless specifically called for on the Drawings or accepted by the Owner.

B. Pull and junction boxes shall be securely fastened to the building structure by means independent of the raceways entering them.

3.2 AS‐BUILT DRAWINGS

A. Pull and junction box locations shall be accurately shown on the As‐built Drawings. Where pull and junction boxes are not readily visible, their indicated locations shall be accurate to within plus or minus 2 feet of the actual location on…