JA-5_AF_Form_66.pdf

PDF 483 KB Posted

Attached to
DET 460 Roof Repair Federal contract opportunity
Solicitation number
FA5004-16-B-C002
Issued by
Department of the Air Force Pacific Air Forces

About this file

JA-5 AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to DET 460 Roof Repair, newest first.
File Type Posted
FA5004-16-B-C002-0003.pdf PDF
JA-9_Specifications.pdf PDF
Questions_ _Answers_17_May_2016.pdf PDF
JA-2_Statement_of_Work.pdf PDF
FA5004-16-B-C002-0002.pdf PDF
JA-9_Specifications.pdf PDF
Sign_In_Sheet_5_May_16.pdf PDF
FA5004-16-B-C002-0001.pdf PDF
JA-4_Wage_Determination.pdf PDF
JA-1_Other_Contract_Requirements.pdf PDF
JA-6_Site_Map _As_Built_Drawings _ _Pictures.pdf PDF
JA-3_Specifications.pdf PDF
FA5004-16-B-C002.pdf PDF
JA-8_-_AF_Forms.pdf PDF
JA-2_Statement_of_Work.pdf PDF
JA-7_Asbestos_Report.pdf PDF
JA-5_AF_Form_66.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT NO.

MATERIAL SUBMITTALS

KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION

PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TR

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROV

ED

DIS-

APPROV

ED

STATEMENT OF WORK

(SOW)

1 Work Plan, SOW 3.4.1 5 4 wks prior to work

01000 DESCRIPTION OF

WORK AND COORDINATION

2 AF Form 103 01010 1.8 A 3 2 wks prior to work start

3 Welding Permits 01000 - 8.1 (If applicable) 2 2 wks prior to work

01030 SAFETY,

ENVIRONMENTAL

PROTECTION,

REGULATIONS, AND CODES

4 Construction Operations and Safety Plan - 1.6 2 4 wks prior to work 5 Safety and Health Plan - 1.8

2 4 wks prior to work

6 Environmental Protection Plan (EPP) - 1.20 2 6 wks prior to work 7 Hazardous Materials Inventory -

1.21 2 2 wks prior to work

8 Hazardous Waste Accumulation Log - 1.22 2 As Applicable

NOI and asbestos abatement plan (if required) 1.26B 4

10 working days prior to work start

Submit only if applicable

Waste disposal/Borrow pit worksheet, 1.26C (if required) 2 w/in 3 days of material transfer Submit only if applicable

Asbestos waste manifests, 1.26D (if required) 2 w/in 3 days of material transfer Submit only if applicable

Abatement Drawings, 1.26F (if required) 2 with Closeout submittals Submit only if applicable

Final Asbestos report, 1.26G (if required) 3 with Closeout submittals Submit only if applicable

FTQW 14-2605 Repair Roof at Det 460 HQ (B1183)

TO BE COMPLETED BY PROJECT

ENGINEER

FA5004-16-B-C002

EIELSON AFB, AK

ATTACHMENT JA-5

AF FORM 66

KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION

PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TR

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROV

ED

DIS-

APPROV

ED

FTQW 14-2605 Repair Roof at Det 460 HQ (B1183)

TO BE COMPLETED BY PROJECT

ENGINEER

14 Schedule- 1.6 2 4 wks prior to work

06100 ROUGH CARPENTRY

15 Product Data - 3.1 2 2 wks prior to ordering materials

07530 SINGLE-PLY

MEMBRANE ROOFING

16 Product Data - 2.1 2 2 wks prior to ordering materials

17 Manufacturer's Warranty - 2.2 2 1 wk after complete

07650 - FLEXIBLE FLASHING

18 Product Data - 3.1 2 2 wks prior to ordering materials

19 Shop Drawings - 3.2 3 4 wks prior to work

087100 - Doors and Windows

Exterior Door, Frame and Hardware Product Data

For Approval

Prior to Ordering

07 53 23 - ETHYLENE

PROPYLENE DIENE

MONOMER ROOFING

20 Shop Drawings - SD-02 3 4 wks prior to work

21 Product Data - SD-03 2 4 wks prior to work

22 Design Data - SD-05 2 4 wks prior to work

FA5004-16-B-C002

EIELSON AFB, AK

KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION

PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TR

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROV

ED

DIS-

APPROV

ED

FTQW 14-2605 Repair Roof at Det 460 HQ (B1183)

TO BE COMPLETED BY PROJECT

ENGINEER

23 Certificates - SD-07 2 4 wks prior to work

24 Manufacturer's Instructions - SD- 08 2 4 wks prior to work

25 Closeout Submittals - SD-11 2 1 wk after complete

FA5004-16-B-C002

EIELSON AFB, AK

File details come from the government source that posted it. Updated .