JA-5_AF_Form_66.pdf
PDF 483 KB Posted
- Attached to
- DET 460 Roof Repair Federal contract opportunity
- Solicitation number
- FA5004-16-B-C002
About this file
JA-5 AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5004-16-B-C002-0003.pdf | ||
| JA-9_Specifications.pdf | ||
| Questions_ _Answers_17_May_2016.pdf | ||
| JA-2_Statement_of_Work.pdf | ||
| FA5004-16-B-C002-0002.pdf | ||
| JA-9_Specifications.pdf | ||
| Sign_In_Sheet_5_May_16.pdf | ||
| FA5004-16-B-C002-0001.pdf | ||
| JA-4_Wage_Determination.pdf | ||
| JA-1_Other_Contract_Requirements.pdf | ||
| JA-6_Site_Map _As_Built_Drawings _ _Pictures.pdf | ||
| JA-3_Specifications.pdf | ||
| FA5004-16-B-C002.pdf | ||
| JA-8_-_AF_Forms.pdf | ||
| JA-2_Statement_of_Work.pdf | ||
| JA-7_Asbestos_Report.pdf | ||
| JA-5_AF_Form_66.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT NO.
MATERIAL SUBMITTALS
KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION
PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TR
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRAC-
TOR RE-
SUBMIT-
TAL
FINAL APPROVAL REMARKS
APPROV
ED
DIS-
APPROV
ED
STATEMENT OF WORK
(SOW)
1 Work Plan, SOW 3.4.1 5 4 wks prior to work
01000 DESCRIPTION OF
WORK AND COORDINATION
2 AF Form 103 01010 1.8 A 3 2 wks prior to work start
3 Welding Permits 01000 - 8.1 (If applicable) 2 2 wks prior to work
01030 SAFETY,
ENVIRONMENTAL
PROTECTION,
REGULATIONS, AND CODES
4 Construction Operations and Safety Plan - 1.6 2 4 wks prior to work 5 Safety and Health Plan - 1.8
2 4 wks prior to work
6 Environmental Protection Plan (EPP) - 1.20 2 6 wks prior to work 7 Hazardous Materials Inventory -
1.21 2 2 wks prior to work
8 Hazardous Waste Accumulation Log - 1.22 2 As Applicable
NOI and asbestos abatement plan (if required) 1.26B 4
10 working days prior to work start
Submit only if applicable
Waste disposal/Borrow pit worksheet, 1.26C (if required) 2 w/in 3 days of material transfer Submit only if applicable
Asbestos waste manifests, 1.26D (if required) 2 w/in 3 days of material transfer Submit only if applicable
Abatement Drawings, 1.26F (if required) 2 with Closeout submittals Submit only if applicable
Final Asbestos report, 1.26G (if required) 3 with Closeout submittals Submit only if applicable
FTQW 14-2605 Repair Roof at Det 460 HQ (B1183)
TO BE COMPLETED BY PROJECT
ENGINEER
FA5004-16-B-C002
EIELSON AFB, AK
ATTACHMENT JA-5
AF FORM 66
KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION
PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TR
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRAC-
TOR RE-
SUBMIT-
TAL
FINAL APPROVAL REMARKS
APPROV
ED
DIS-
APPROV
ED
FTQW 14-2605 Repair Roof at Det 460 HQ (B1183)
TO BE COMPLETED BY PROJECT
ENGINEER
14 Schedule- 1.6 2 4 wks prior to work
06100 ROUGH CARPENTRY
15 Product Data - 3.1 2 2 wks prior to ordering materials
07530 SINGLE-PLY
MEMBRANE ROOFING
16 Product Data - 2.1 2 2 wks prior to ordering materials
17 Manufacturer's Warranty - 2.2 2 1 wk after complete
07650 - FLEXIBLE FLASHING
18 Product Data - 3.1 2 2 wks prior to ordering materials
19 Shop Drawings - 3.2 3 4 wks prior to work
087100 - Doors and Windows
Exterior Door, Frame and Hardware Product Data
For Approval
Prior to Ordering
07 53 23 - ETHYLENE
PROPYLENE DIENE
MONOMER ROOFING
20 Shop Drawings - SD-02 3 4 wks prior to work
21 Product Data - SD-03 2 4 wks prior to work
22 Design Data - SD-05 2 4 wks prior to work
FA5004-16-B-C002
EIELSON AFB, AK
KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION
PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TR
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRAC-
TOR RE-
SUBMIT-
TAL
FINAL APPROVAL REMARKS
APPROV
ED
DIS-
APPROV
ED
FTQW 14-2605 Repair Roof at Det 460 HQ (B1183)
TO BE COMPLETED BY PROJECT
ENGINEER
23 Certificates - SD-07 2 4 wks prior to work
24 Manufacturer's Instructions - SD- 08 2 4 wks prior to work
25 Closeout Submittals - SD-11 2 1 wk after complete
FA5004-16-B-C002
EIELSON AFB, AK
File details come from the government source that posted it. Updated .