Questions and Answers
1. SOW section 1.3 states abate PCB contaminated paint in bay area, utility room and room 6. Can the owner provide the analytical testing results? This is “Critical” for disposal.
A. SEE ATTACHED REPORT
2. Was the glue below the VCT in room #6 tested for ACM?
A. Samples in other parts of the building have tested positive for asbestos, it is 100% assumed there is asbestos present.
3. Do you have any target specifications for the finish hardness of the “sealer”?
A. Fill all expansion joints with RS 88 Polyurea or equal. Fill voids holes or other imperfections. Polish floor and seal with a material that will stand up to industrial vehicle traffic such as skid steers, motor vehicles, floor jack and other heavy equipment items. Floor must be resistant to fuel, oil, hydraulic fluid, and other petroleum materials.
4. Can you verify the depth of the concrete slab? Approximate...
A. 14+ Inches. This is based on what was seen when troughs were open.
5. Can we use the building power?
A. YES
6. Do you want the existing wood base replaced that is on the south wall of the work bay?
A. YES
7. Section 3 1.3 States remove concrete and metal trim from the channels in bay area and room 6 approximately 260’ x 16”. There was no “metal trim evident” in room 6. Is there metal trim known to be below the VCT?
A. Yes, the metal trim runs the length of the building. Tile needs removed to be certain. See photo.
8) Is the contractor responsible for moving equipment inside the shop?
(Lockers, air compressor, washer & dryer, water heaters, work benches ECT)
Answer: Items not permanently installed will be moved by occupant. Items must remain in warehouse so they can be moved to one side of the warehouse as project is completed.
9) Does the floor tile in room 6 need to be abated?
Answer: Samples in other parts of the building have tested positive for asbestos, it is 100% assumed there is asbestos present.
10) Is new wall base needed in room 6 if so what type?
Answer: Yes, standard baseboard.
11) Can a high strength non shrink grout be used to infill the channels after the metal trim is removed?
Answer: The contractor can use their best method as long as it is IAW the SOW.
12) Is new yellow warning paint required @ the eye washstand and electrical panel?
Answer: Yes
13) Has any testing been done for asbestos and PCB’s? if so, can a copy of analytics be produced for review?
Answer: Yes, data previously provided.