Statement of Work/Statement of Objectives/Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answers_to_Site_Visit_Questions.docx | DOCX document | |
| KaTom_Specs.pdf | ||
| FA500018Q0097.pdf | ||
| Wage_Rates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pour Concrete Pad and Install Freezer
Statement of Work
1. Demo asphalt area prep and Pour concrete pad to hold Walk in Freezer.
2. Assemble, Transport and install outdoor modular self-contained walk in freezer (6' x 12' x 7' - 711 H)
3. Make all necessary electrical connections to provide power to freezer unit
(1 - 1 /2 hp, 208 - 230v/60/I).
4. Provide and install a ramp to allow a pallet jack in/out of the freezer.
-5. Weight: 1907 lbs. total
APPLICABLE CODES:
All work in this contract shall be done in accordance with National Fire Protection Association (NFPA), Uniform Building Code (UBC), Uniform Mechanical Code (UMC), Uniform Plumbing Code (UPC), National
Electrical Safety Code (ANSI C2), OSHA-Occupational Safety and Health Act, ANSI B 20.11992, 40 CFR
EPA, Environmental Protection Agency, and all local safety, fire and security regulations. All codes listed here shall be the latest version and most recent or up-to-date publications in print.
1. Background:
Project Title: Pour Concrete Pad Install Freezer
Project Site: Bldg. 8088, JBER, Alaska
STATEMENT OF OBJECTIVES
06 JUN 2018
lditarod Dining Facility (Bldg 8088) work site, is an area where military personnel and the DoD civilian workforce eat and socialize at least three times a day. They are contracting to provide extra freezer space for their daily supply of rations.
2. Objective:
a. Contractor is to furnish all labor, materials, and equipment to accomplish the following work.
b. Contractor shall Pour Concrete Pad sized to Install a Walk in Freezer that extends Gin outside Freezer edges on three sides and to sidewalk on front side (6'x 12' x 7' - 7" H) . The user will provide walk in freezer to Contractor for installation.
c. Contractor will assemble freezer in accordance with manufacture specifications. Provided by the user.
d. The Contractor shall install freezer at Concrete pad location, connect to power panel in facility with all required electrical runs, breakers and outlets needed to power freezer Unit.
*Power to be connected to (SKC) Panel located in HVAC Utility room
e. Once work is completed the freezer must be a complete and usable unit.
f. Contractor will provide standard warranty for work performed.
g. All work will be accomplished in accordance with all applicable building, electrical, and fire codes in effect at the time of award of contract .
h. During the job, the contractor is responsible for compliance with all OSHA/AFOSH Standards.
3. Constraints:
a. The contractor's job site is to remain clean at all times. Debris will be collected and disposed of daily.
b. During the performance of this project the contractor is responsible for repairing any damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government, repair any damage caused by construction operations, and take all precautions necessary to safely protect the building and its occupants during the construction period .
c. Use of premises is limited to the indicated work area. Do not disturb adjacent areas beyond the work site.
Only the Government right to work may limit the Contractor's use of the premises.
d. The Government will occupy adjacent facility during the entire construction period. Coordinate with the
Government during construction operations to minimize conflicts and facilitate Government usage.
e. Keep driveways and entrances serving the premises clear and available to the Government's employee's customers and emergency vehicles at all time. Do not use these areas for parking or storage of materials.
SITE VISIT: It is required that the Contractor visit the work site to verify location and thoroughly familiarize himself with existing conditions prior to submission of bid.
APPLICABLE CODES:
All work in this contract shall be done in accordance with National Fire Protection Association (NFPA), Uniform Building Code (UBC), Uniform Mechanical Code (UMC), Uniform Plumbing Code (UPC), National
Electrical Safety Code (ANSI C2), OSHA-Occupational Safety and Health Act, ANSI B 20.11992, 40 CFR
EPA, Environmental Protection Agency, and all local safety, fire and security regulations. All codes listed here shall be the latest version and most recent or up-to-date publications in print.
CONTRACTING AUTHORITY: Only the Contracting Officer is authorized to make changes or additions to the contract.
COORDINATION OF WORK: Once the contractors' proposals have been received and reviewed, Contracting will notify the contractor awarded the contract.
A B C D
41 If/ /JJ/7 0
I I - "'-\\ \Ji' ,I
II I
- E-
11ll<il=C~t·1 :71 ~-:-: :::::
C()(tll.lClaft_of..c.mtLOOOa ~
E
I IT HE
- E-
F G H
'D ! Cumnt wo \~ e=-1, a D ~ =1 "" om E iJ OI E lf,--- - 11 I -I
IL_
E- T rrr 1 · -, ~ lllll L .--IDJ~I~"
· IL I
FL
AS.BUILT
RECORD
DRAWINGS -
E E· E
I DILE
H Taff
I - 1= II PROJECT TITLE ~Nm<"' ~ JOINT BASE ELMENDORF-RICHARDSON, AK
- ··-··-··· . . BUILDING OR FACIUTY:8088
IK~-iua I~ II FLOOR_1
'""' """""" -X-X _st«.n 1 c,. 1
Q'.
w <D z, =l u:, w l;1 0 z u: