1.Q: Will the bollards need to be removed between the existing freezer and the new freezer?

A: Not Listed in the SOW-(Bollards will NOT be removed).

2.Q:Will new bollards need to be installed for the new walk-in freezer?
A:Not listed in the SOW-(No bollards will need to be installed).

3.Q: Is the compressor motor 1-1/2HP 208/230V single phase or three phase?

A: See SOW #3 (1-1/2 HP,208-230v/60/1) and Manufactures specifications page #1.

4.Q: Can the walk-in freezer manufacturer installation and specifications be provided for this RFP?

A: Manufacture specifications will be provided.

5.Q: Can the ramp for entry to the new walk-in freezer be concrete or steel?

A: SOW # 4 - The customers intent is to have a steel grated ramp for entry into the freezer. This will provide for a slip free surface during winter months.

6.Q: To meet the Technical Factor the contractors proposal will need to meet and provide for the Contract RFP SOW? Please clarify.

A: Comply with all areas of the Statement of Work

7.Q: Will the Freezer need to be placed on a mount/bracket so as not to sit on the concrete pad?

A: Yes, this would prevent damage to the floor over the life of the freezer (See below photo).