4.Environmental Specifications.pdf

PDF 656 KB Posted

Attached to
Roof Repair Bldg 1363
Solicitation number
FA4897-17-T-0007
Issued by

About this file

Environmental Specs

View the file

Other files

File Type Posted
5.Certificate of Insurance.pdf PDF
FA4897-17-T-0007.pdf PDF
6.Warranty.pdf PDF
8.Submittal Schedule for Bldg 1363.pdf PDF
3.Drawings.pdf PDF
10.Wage Determination.pdf PDF
2.Specifications.pdf PDF
1.SOW for Bldg 1363 roof repair.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mountain Home AFB (MHAFB) Environmental Specifications 14 April 2016

Contents

1. PART 1 GENERAL

1.1. REFERENCES

1.2. GENERAL REQUIREMENTS

1.3. SUBCONTRACTORS

1.4. SUBMITTALS

1.5. ENVIRONMENTAL MANAGEMENT PLAN

1.6. NOTIFICATION

2. PART 2 PRODUCTS

3. PART 3 EXECUTION

3.1. RECYCLING AND SOLID WASTE

3.2. HAZARDOUS MATERIALS

3.3. HAZARDOUS WASTE

3.4. TOXIC SUBSTANCES

3.5. FUEL AND LUBRICANTS

3.6. SPILLS

3.7. WATER RESOURCES

3.8. AIR RESOURCES

3.9. NATURAL RESOURCES

3.10. PROTECTION OF CULTURAL RESOURCES

3.11. RADIOACTIVE MATERIALS

3.12. MISCELLANEOUS

NOTE: This specification covers the requirements for environmental protection during construction activities at Mountain Home AFB. This specification is intended to cover state regulations and permits issues to Mountain Home AFB. Edit this guide specification for project specific requirements by adding, deleting, or revising text.

Remove information and requirements not required in respective projects, whether or not brackets are present.

1. PART 1 GENERAL

NOTE: Industrial Hygiene Designers are required to edit this portion of the specification when an air pathway analysis indicated perimeter air monitoring and controls are warranted.

Designers need to ensure that the project design and proposed methods of construction comply with all applicable federal, state, and local laws, including: Clean

Air Act (CAA), Clean Water Act (CWA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), Emergency Planning and

Community Right-to-Know Act (EPCRA), Endangered Species Act (ESA), Fish and

Wildlife Coordination Act (FWCA), National Environmental Policy Act (NEPA), National

Historic Preservation Act (NHPA), National Pollutant Discharge Elimination System

(NPDS), Oil Pollution Act (OPA), Resource Conservation and Recovery Act (RCRA), Safe

Drinking Water Act (SDWA), Toxic Substance Control Act (TSCA), Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), and Subsequent Executive Orders.

This specification contain environmental requirements for many different types of projects. The Designer will delete, add, or modify requirements so only applicable environmental conditions are addressed.

1.1. REFERENCES

NOTE: This paragraph is used to list the publications cited in the text of the specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

10 CFR 150 Exemptions and Continued Regulatory Authority in Agreement

States and in Offshore Waters Under Section 274

40 CFR 68 Chemical Accident Prevention Provisions

40 CFR Part 82, Subpart F Protection of Stratospheric Ozone

40 CFR 204 Noise Emission Standards for Construction Equipment

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 273 Standards for Universal Waste Management

40 CFR 279 Standards for the Management of Used Oil

40 CFR 302 Designation, Reportable Quantities, and Notification

40 CFR 355 Emergency Planning and Notification

40 CFR 745 Toxic Substances Control Act – Lead-Based Paint Poisoning

Prevention in Certain Residential Structures

40 CFR 763 Toxic Substances Control Act – Asbestos

49 CFR 171 – 178 Hazardous Materials Regulations

AFI 32-7042 Waste Management (7 November 2014)

Idaho State Code 39-118 Review of Plans

IDAPA 58.01.01 Rules for Control of Air Pollution in Idaho

IDAPA 58.01.05 Rules and Standards for Hazardous Waste in Idaho

IDAPA 58.01.16 Wastewater Rules in Idaho

IDAPA 58.01.17 Recycled Water Rules in Idaho

IDAPA 58.01.24 Standards and Procedures for Application of Risk Based

Corrective Action at Petroleum Release Sites

Executive Order 13101 Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition

1.2. GENERAL REQUIREMENTS

Minimize environmental pollution and damage that may occur at Mountain Home AFB (MHAFB) as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. Comply with all applicable local, state, and federal laws and regulations regarding protection of the environmental and resources, including stipulations from agencies and offices, such as the

Environmental Protection Agency (EPA), Idaho Department of Environmental Quality, and State Historic

Preservation Office (SHPO). Any delays resulting from failure to comply with environmental laws and regulation swill be the Contractor’s responsibility. In the event of conflicting requirements, coordinate with the Contracting Officer for resolution.

1.3. SUBCONTRACTORS

Ensure compliance with this specification by subcontractors.

1.4. SUBMITTALS

NOTE: All submittals require Government approval. Provide submittals to Contracting

Officer as outlined in Contract with MHAFB.

Where applicable, submit the following to the Contracting Officer:

1.4.1. Environmental Management Plan

1.4.1.1. EPA Notice of Intent for Stormwater Discharges Associated with Construction Activity

1.4.1.2. Air Quality Permit to Construct (Idaho Department of Environmental Quality)

1.4.1.3. Air Quality Permit by Rule (Idaho Department of Environmental Quality)

1.4.1.4. Air Quality Form PERF (Idaho Department of Environmental Quality)

1.4.1.5. Analytical Data for soil brought onto MHAFB

1.4.1.6. Analytical Data for soil leaving MHAFB

1.4.1.7. Acceptance letter from landfill for contaminated waste which includes asbestos-containing materials and soils with pesticides NOT characterized as hazardous waste.

1.4.1.8. Certifications: Provide a copy of any required certifications, including but not limited to

Asbestos Building Inspector and Lead-Based Paint Inspector certifications.

1.4.1.9. Results of Asbestos Inspection conducted by an Asbestos Building Inspector, certified in accordance with 40 CFR 763, with copy of inspector’s certification.

1.4.1.10. Results of Lead-Based Paint Survey conducted by a Lead-Based Paint Inspector, certified in accordance with 40 CFR 745, with copy of inspector’s certification.

1.4.2. Request to bring radioactive materials or nuclear devices on MHAFB, to include Nuclear

Regulatory Commission (NRC) Form 241, Report of Proposed Activities in Non-Agreement States

1.4.3. EPA Notification of Demolition and Renovation

1.4.4. EPA Notification of LBP Abatement Activities Form

1.4.5. Toxicity Characteristic Leaching Procedures (TCLP) analytical data for waste characterization

1.4.6. MHAFB Contractor Hazardous Material Monthly Usage Reporting Form (Attachment 2)

1.4.7. Draft plans and specifications for public water system modifications

1.4.8. Final plans and specifications for public water system modifications

1.4.9. Draft plans and specifications for sanitary system modifications

1.4.10. Final plans and specifications for sanitary system modifications

1.4.11. Dust suppression records

1.4.12. Refrigerant Servicing Report

1.4.13. Weight tickets for solid waste and recycling, to include contaminated soils and asbestos-containing materials

1.4.14. EPA Notice of Termination for NPDES Stormwater Permit

1.5. ENVIRONMENTAL MANAGEMENT PLAN

NOTE: The Environmental Management Plan is to include any environmental concerns or plans that may be required for the construction Contractor to protect the environmental during execution of the project. The Contractor should coordinate the requirements with 366 CES/CEIE (MHAFB Environmental Management) in addition to the federal, state, and/or local governing agencies.

Develop an Environmental Management Plan and submit to Contracting Officer for 366 CES/CEIE

(Environmental Management) review and approval 14 calendar days prior to beginning work. The

Environmental Management Plan is to address all requirements outlined in this specification to the maximum extent practicable.

1.5.1. Compliance

No requirement in this Section will relieve the Contractor of any applicable federal, state, and local environmental protection laws and regulations. During Construction, the Contractor will be responsible for identifying, implementing, and submitting for approval any additional requirements to be included in the Environmental Management Plan.

1.5.2. Contents

NOTE: Any unnecessary or inapplicable plans or requirements are to be deleted. The

Environmental Management Plan is to include any environmental concerns or plans that may be required for the construction Contractor to protect the environmental during execution of the project. The Contractor should coordinate the requirements with 366 CES/CEIE (MHAFB Environmental Management) in addition to the federal, state, and/or local governing agencies.

Include in the Environmental Management Plan, but not limit it to, the following:

1.5.2.1. Name(s) of person(s) within the Contractor’s organization who is (are) responsible for ensuring adherence to the Environmental Management Plan.

1.5.2.2. Site Sketch showing locations of proposed temporary excavations or embankments for haul roads, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials including methods to control runoff and to contain materials on the site. The sketch of soil excavation areas include, if applicable, the width and depth of excavation under building slabs and outside and inside of the foundation walls of any structures being demolished. Indication, if applicable, location(s) of permitted equipment.

1.5.2.3. List of Hazardous Materials (Attachment 1) with manufacture-specific Safety Data Sheets.

1.5.2.4. Non-hazardous solid waste disposal and recycling procedures. The Contractor may coordinate with the MHAFB Recycle Center or Solid Waste Manager through the Contracting

Officer when preparing the plan for advice or suggestions to meet recycling requirements.

(1) Provide a brief description of work done under the contract, identification of the major waste streams (categories of waste, e.g. wood, fixtures, cardboard, etc) to be generated, and intended method and location of disposal or recycling for each waste stream and quantity.

(2) Identify subcontractors responsible for the transportation and disposal of solid waste.

Submit licenses or permits for solid waste disposal sites that are not a commercial operating facility.

(3) Evidence of the disposal facility’s acceptance of the solid waste must be attached to this plan.

1.5.2.5. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include monitoring and reporting requirement to assure that the control measures are in compliance with the erosion and sediment control plan, federal, state, and local laws and regulation. A Storm Water Pollution

Prevention Plan (SWPPP) which identifies the type and location of the erosion and sediment controls along with an EPA Stormwater Notice of Intent is required for project sites greater than or equal to one acre.

1.5.2.6. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Include measures to minimize the amount of mud transported onto paved roads by vehicles or runoff.

1.5.2.7. Site Specific Contingency Plan: Use the MHAFB Contractor Site Specific Contingency Plan

(Attachment 3) to provide procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, and 40 CFR 355.

1.5.2.8. Spill Response Plan: If planning to use or store on base any petroleum product or chemical substance regulated by 40 CFR 68, 40 CFR 302, and 40 CFR 355 in quantities of 55 gallons or more, use the MHAFB Contractor Site Specific Contingency Plan (SSCP) in Attachment 3 to provide procedures, instruction, and reports to be used in the event of an unforeseen spill of the petroleum product or chemical substance.

1.5.2.9. Contaminated Soil Plan: Details for excavation, handling, and transportation of contaminated soils being removed from MHAFB by construction and demolition activities. Include a copy of the analytical data or reference the study in which the soil analysis was conducted and a copy of the acceptance letter from the landfill where soils will be disposed.

1.5.2.10. Asbestos abatement procedures (containment/work area, clean rooms, load-out, clearance samples): Ensure procedures have been reviewed by a certified industrial hygienist and meet applicable OSHA and EPA regulations for asbestos abatement or removal projects.

1.5.2.11. Lead-based paint abatement procedures (containment/work area, clean rooms, load-out, and clearance samples), and handling and transportation of LBP material. Ensure procedures have been reviewed by a certified industrial hygienist and meet applicable OSHA and EPA regulations for lead-based paint abatement or removal projects.

1.5.2.12. Air Pollution Control Plan: Detail provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

1.5.2.13. Natural Resources Protection procedures: Include protection measures for all environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract during the entire period of the contract. Include procedures to be followed if biological resources and wetlands not previously known to be onsite or in the area are discovered during construction and identify lines of communication between Contractor personnel, Contracting Officer, and MHAFB Cultural Resources Manager.

1.5.2.14. Cultural Resources Protection procedures: Include methods to protect cultural resources at the project site and/or identify procedures to be followed if cultural resources and/or material not previously known to be onsite or in the area are inadvertently discovered during the project. Include methods to ensure the protection of known or discovered resources/material and identify lines of communication between Contractor personnel, Contracting Officer, and MHAFB Cultural Resources Manager.

1.5.3. Appendix

Attach to the Environmental Management Plan, as an appendix, copies of all environmental permits, permit application packages, notifications, certifications, and reports. Attachments, where applicable, include the following:

1.5.3.1. EPA Notice of Intent for Stormwater Discharges Associated with Construction Activity

1.5.3.2. Air Quality Permit to Construct (Idaho Department of Environmental Quality)

1.5.3.3. Air Quality Permit by Rule (Idaho Department of Environmental Quality)

1.5.3.4. Air Quality Form PERF (Idaho Department of Environmental Quality)

1.5.3.5. Analytical Data for soil brought onto MHAFB

1.5.3.6. Analytical Data for soil leaving MHAFB

1.5.3.7. Acceptance letter from landfill for contaminated waste which includes asbestos-containing materials and soils with pesticides NOT characterized as hazardous waste.

1.5.3.8. Certifications: Provide a copy of any required certifications, including but not limited to

Asbestos Building Inspector and Lead-Based Paint Inspector certifications.

1.5.3.9. Results of Asbestos Inspection conducted by an Asbestos Building Inspector, certified in accordance with 40 CFR 763, with copy of inspector’s certification.

1.5.3.10. Results of Lead-Based Paint Survey conducted by a Lead-Based Paint Inspector, certified in accordance with 40 CFR 745, with copy of inspector’s certification.

1.6. NOTIFICATION

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with federal, state or local environmental laws or regulations, permits, and other elements of the Contractor’s

Environmental Management Plan. After receipt of such notice, the Contractor will inform the

Contracting Officer of the proposed corrective action and take such action when approved by the

Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken.

2. PART 2 PRODUCTS

NOT USED

3. PART 3 EXECUTION

NOTE: Edit and/or delete the following paragraphs to reflect project requirements only.

3.1. RECYCLING AND SOLID WASTE

3.1.1. Non-hazardous solid waste stream diversion: Make every practical effort to maximize non-hazardous solid waste and C&D diversion from landfills or incinerators through reuse, donation, recycling, composting and mulching, or other waste diversion activities to optimize reduction in both the volume of solid waste disposed and overall cost of non-hazardous solid waste management. (AFI 32-7042)

3.1.2. Support MHAFB’s recycling policy in accordance with Executive Order 13101, whenever feasible.

Consistent with the demands of efficiency and cost effectiveness, incorporate waste prevention and recycling. It is the national policy to prefer pollution prevention. Disposal should be employed only as a last resort.

3.1.3. Do not deposit any refuse in existing containers or dumpsters. Refuse is defined as debris other than organic materials like trees, brush, leaves, grass, stumps, etc.

3.1.4. Dispose/manage limited waste streams to the MHAFB recycling program with the Government's approval only. The acceptance of these waste streams is dependent on the Government's ability to process the waste stream and the Contractor's ability to adequately prepare the waste stream to meet the Government's condition requirements. The Government currently recycles the following items on MHAFB: all scrap metal, corrugated cardboard, paper and PET #1 plastic.

Segregate all recyclable material prior to delivery to the MHAFB Recycling Center.

3.1.4.1. Contact the MHAFB recycling center through the Contracting Officer for the latest recycling information concerning what materials are currently accepted and to make arrangements for on-site bins.

3.1.4.2. Dispose of refuse off site in accordance with all local, state, and federal rules and regulations, following coordination with the 366 CES/CEIE through the Contracting Officer. Dispose of refuse in containers that are emptied on a regular schedule. Conduct all handling and disposal of refuse to prevent contamination of the environment.

3.1.5. Submit weight tickets to 366 CES/CEIE through Contracting Officer monthly, or at the end of the project if lasting less than one month, for all non-hazardous solid waste diversion and disposal of construction and demolition debris.

3.1.5.1. Scales available for use are located at LRC, building 1132.

3.2. HAZARDOUS MATERIALS

3.2.1. Hazardous materials are defined in 49 CFR 171-178.

3.2.2. Provide a list of hazardous materials using Attachment 1 with manufacturer-specific Safety Data

Sheets (SDSs) to the Contracting Officer who will provide it to the Installation Hazardous

Materials Manager (IHMM) for review and approval prior to bringing the materials onto base.

3.2.3. For contracts exceeding 30 days in duration, provide a completed MHAFB Contractor Hazardous

Material Monthly Usage Reporting Form (Attachment 2). Upon completion of the project, the

Contractor will provide the Contracting Officer with the final form to close out the project. The

Contracting Officer will provide these documents to the IHMM for processing and evaluation.

3.2.4. Provide proper storage and equipment (e.g. flammable materials lockers, corrosive materials lockers, secondary containment pallets, spill kits, etc.) and practice safe usage and handling of materials in accordance with OSHA and MHAFB requirements.

3.2.5. Remove all remaining full, partially full, or empty hazardous materials containers used during performance of the contract. These are the property of the Contractor and must be removed from MHAFB before final payment, unless specific prior arrangements have been made with the

Contracting Officer in coordination with the IHMM and 366 CES/CEIE.

3.3. HAZARDOUS WASTE

NOTE: MHAFB is a Large Quantity Generator of hazardous waste as defined in 40 CFR

262. All work done at MHAFB must be incompliance with Resource Conservation and

Recovery Act (RCRA) 40 CFR Parts 260-262 and Idaho Rules and Standards for

Hazardous Waste (IDAPA 58.01.05).

3.3.1. Coordination: Notify the Contracting Officer of any hazardous substance or waste, as defined in

40 CFR Part 261. The Contracting Officer will coordinate with 366 CES/CEIE Hazardous Waste

Program Manager to ensure that the Contractor properly identifies, segregates, samples, stores, transports, and disposes of all hazardous wastes in accordance with federal regulations.

3.3.1.1. Manifest: Hazardous wastes must be manifested for shipment off of MHAFB. The 366

CES/CEIE are the ONLY manifest signature authorities for hazardous waste transportation/disposal for MHAFB. Coordinate with the 366 CES/CEIE through the

Contracting Officer to arrange for manifesting hazardous waste off MHAFB.

3.3.2. Compliance with Regulations: Comply with the Resource Conservation and Recovery Act

(RCRA) 40 CFR Parts 260-262, and Idaho Rules and Standards for Hazardous Waste (IDAPA

58.01.05) at all times.

3.3.3. Accumulation Limits: Do not accumulate more than 55 gallons, total, of hazardous waste on site. Provide secondary containment for all hazardous liquids to include required labels and signage in accordance with RCRA requirements. Use containment compatible with the materials and capable of containing 110% of the volume of the largest container.

3.3.4. Universal Waste/Polychlorinated Biphenyls (PCBs): Provide a copy of all shipping and/or disposal documents to the Contracting Officer for universal wastes and PCBs. Universal waste consists of designated items required, in accordance with 40 CFR Part 273, to be collected, managed and disposed via special direction.

3.3.4.1. For tracking purposes, the shipping documents must include a document number and the total weight in US pounds for each class of items.

3.3.4.2. Universal Waste items consist of (1) batteries of all sizes and types (other than alkaline batteries of all sizes, or lead/acid vehicle batteries); (2) fluorescent or incandescent bulbs of all sizes and types; (3) pesticides and (4) mercury containing equipment such as thermostats and thermometers.

3.4. TOXIC SUBSTANCES

NOTE: There is the potential for many of the soils being removed from MHAFB by construction activities to contain hazardous constituents. Suspect soils, as determined by 366 CES/CEIE, require testing prior to disposal to determine the proper disposal method. Pesticides are a common major concern and can be expected in the soil under all building slabs, and outside and inside of the foundation walls of any structures built through 1989. All soil meeting this criterion should be returned to the originating excavation point to the maximum extent practicable. When working in an area where a building has been demolished and the foundation is not identifiable, the area suspected is considered for possible residual pesticide materials. Under no circumstances will the soil be transported off the project site unless prior approval has been obtained from 366 CES/CEIE through the Contracting Officer. The definition of “project site” is the immediate vicinity of the construction/demolition activities within the project boundaries.

During excavation, there is a potential to inadvertently encounter asbestos/cement

(transite) pipe. MHAFB has procedures in place that Contractors must follow in the event that transite is inadvertently encountered. Procedures will be covered during the Pre-Con meeting.

3.4.1. Soils

3.4.1.1. Do not transport soil off the project site unless prior approval has been obtained from 366

CES/CEIE through the Contracting Officer. The definition of “project site” is the immediate vicinity of the construction/demolition activities within the project boundaries.

3.4.1.2. Test soils coming on to MHAFB as fill material. Analytical analysis includes Method 8260 for

Volatile Organic Compounds (VOCs), Method 8270 for Semi-volatile Organic Compounds

(SVOCs), Methods 6010/7470 for RCRA (8) Metals, Method 8081 for Pesticides, and Method

8082 for PCBs to demonstrate non-contaminated before being accepted for use on the project site. Determination of the number of samples should be determined by an experienced environmental professional.

3.4.2. Asbestos Containing Materials (ACM)

3.4.2.1. In the event asbestos abatement or removal is required, include a copy of the Asbestos

Inspection as part of the Environmental Management Plan.

3.4.2.2. Where required, file an EPA Notification of Demolition and Renovation 10 business days prior to the start of the project. Due to the MHAFB’s Tier I Air Quality Permit, Idaho Department of

Environmental Quality(IDEQ) requires notification to be submitted to IDEQ, 1410 N. Hilton

Boise, ID 83706. Submit notification copies with IDEQ received stamp date to the Contracting

Officer prior to the start of work.

3.4.2.3. If asbestos/cement (transite) pipe or pipe fragments are encountered, stop work in the area immediately and contact the 366 CES/CEIE via the Contracting Officer to ensure the ACM is handled in accordance with federal regulations.

3.4.3. Lead-based Paint (LBP)

3.4.3.1. In the event LBP abatement is required, include a copy of the LBP Survey as part of the

Environmental Management Plan.

3.4.3.2. File an EPA Notification of LBP Abatement Activities Form to the EPA. Submit a copy of notification with EPA received stamp date to the Contracting Officer prior to the start of work.

3.4.3.3. For disposal of construction/demolition materials, characterize the waste using Toxicity

Characteristic Leaching Procedures (TCLP) to determine if the waste is hazardous or solid waste. Dispose of LBP material in accordance with state and federal regulations. In the event waste is characterized as hazardous, refer to section 3.3 for hazardous waste procedures.

3.5. FUEL AND LUBRICANTS

3.5.1. Fuel and Lubricant Usage: Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all federal, state, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279.

3.5.2. Petroleum-Contaminated Sites: For soil disturbance and/or removal on sites with known petroleum contamination, use Standards and Procedures for Application of Risk Based

Corrective Action at Petroleum Release Sites (IDAPA 58.01.24) and Idaho Department of

Environmental Quality Risk Evaluation Manual for Petroleum Releases to ensure compliance with state regulations.

3.6. SPILLS

3.6.1. Uncontrolled Spills: In the event of an uncontrolled spill, notify the MHAFB Fire Department by calling 911 if using a phone on the MHAFB system or 208-828-0911. (NOTE: Calling 911 from a cell phone or an off-base phone system will reach emergency services at the City of Mountain

Home and then will be rerouted to MHAFB, delaying response). MHAFB Fire Department will initiate the notification system.

3.6.2. All Spills: Notify the Contracting Officer of all spills regardless of substance or quantity using the

Environmental Hazardous Material Release Report in Attachment 3. The Contracting Officer will coordinate with 366 CES/CEIE to ensure that all spills have been properly contained, cleaned-up, and reported.

3.6.3. Training: Ensure each employee, including subcontractors working on the job, are familiar with the SSCP and are educated and trained in the prevention and response procedures that are tailored to the specific site and task to minimize risk of spills and response to spills can be dealt with in a manner to minimize impact to the environment.

3.6.4. Prevention: Establish methods and procedures to prevent spills from occurring. Examples include ensuring connections are tight, providing containment when drawing off chemicals from a container or transferring chemicals, closing containers when not in use, and using proper equipment for the job.

3.6.5. Control: Establish procedures to control the spread of a substance or chemical should spill, release or leak occur.

3.6.6. Supplies: Provide necessary supplies and equipment on hand to control any spills, leaks, or releases. These include pads and other absorbent material, trays, mats to cover manholes and drains, etc.

3.6.7. Procedure Outline: Use the procedures outlined in Attachment 3 for Spill Response Procedures.

The Contractor is ultimately responsible for ensuring spills do not occur and responding in a manner to prevent harm to people and minimize environmental contamination. The person discovering the spill or release is responsible for initiating the Spill Response Plan and providing initial defensive actions without undue risk of personal injury.

3.6.8. Spill Clean Up

Properly clean up the spill to EPA and Idaho Department of Environmental Quality standards.

The Contractor shall be responsible for all costs associated with cleanup and restoration of sites contaminated by chemicals from Contractor activities.

3.7. WATER RESOURCES

NOTE: MHAFB has a National Pollutant Discharge Elimination System (NPDES) permit issued by EPA and a Municipal Wastewater Reuse Permit issued by Idaho Department of Environmental Protection for authorization to discharge from the Wastewater

Treatment Plant at MHAFB. All work pertaining to the sanitary system, to include disposal of chemicals into sanitary system as part of project, must be coordinated with

366 CES/CEIE via the Contracting Officer.

3.7.1. Keep construction activities under surveillance, management, and control to avoid pollution of surface and ground waters.

3.7.2. If the project disturbs 1 or more acres of contiguous land, submit a Notice of Intent (NOI) to EPA for coverage under the National Pollutant Discharge Elimination System (NPDES) stormwater program.

3.7.2.1. Wait 14 calendar days after submitting the NOI prior to beginning any work, including staging and/or stockpiling materials.

3.7.2.2. Comply with all permit requirements, including developing a Stormwater Pollution

Prevention Plan (SWPPP). Use EPA’s SWPPP guidance and template and inspection and corrective action form templates in the development of the SWPPP.

3.7.2.3. For projects that do not disturb 1 or more acres, implement best management practices to minimize stormwater contaminates and protect environmental resources.

3.7.3. Ensure there are no unauthorized discharges to the stormwater or sanitary collection system.

3.7.3.1. Ensure all discharges to the sanitary sewer system are in accordance with the requirements of the wastewater treatment plant NPDES and wastewater land application permits (IDAPA

58.01.16 and 58.01.17).

3.7.3.2. Do not pour, drain, or wash cleaners and other solutions into plumbing fixtures, sanitary sewers, or storm sewers.

3.7.4. Use backflow protection devices if tapping into a hydrant to gain a water source for activities.

3.7.5. Drinking Water and Sanitary Construction

3.7.5.1. Comply with all state regulations, specifically Idaho State Code 39-118 for all work on public water and sanitary sewer systems.

3.7.5.2. Submit all plans and specifications to the Contracting Officer for review prior to submitting to

Idaho Department of Environmental Quality for review.

3.7.5.3. Submit Idaho Department of Environmental Quality approved plans, specifications, and letter to Contracting Officer prior to starting work.

3.8. AIR RESOURCES

NOTE: MHAFB has an Air Quality Tier I Operating Permit issued by Idaho Department of Environmental Quality. This is also known as a Title V permit by the federal government. Requirements below are in accordance with this permit which establishes facility-wide requirement and in accordance with the Rules for the Control of Air Pollution in Idaho.

3.8.1. Control of dust, aerosols and gaseous by-products from construction and demolition activities, processing, and preparation of materials at all times, including weekends, holidays, and hours when work is not in progress. Control emission of criteria pollutants and hazardous air pollutants from equipment to federal and state allowable limits at all times.

3.8.2. Compliance with Regulations: All work conducted at MHAFB must be accomplished in accordance with the Clean Air Act and Rules for Control of Air Pollution in Idaho (IDAPA

58.01.01).

3.8.3. Dust: MHAFB has an Air Quality Tier I Operating Permit issued by Idaho Department of

Environmental Quality which specifies requirements for control of fugitive dust emission.

3.8.3.1. Take all reasonable precautions to prevent particulate matter from becoming airborne in accordance with Rules for Control of Air Pollution in Idaho, IDAPA 58.01.01.650-651. In determining what is reasonable, consideration will be given to factors such as the proximity of dust emitting operations to human habitations and/or activities and atmospheric conditions which might affect the movement of particulate matter.

3.8.3.2. Monitor and maintain records of the frequency and the method(s) used (i.g., water, chemical dust suppressants) to reasonably control fugitive dust emissions. Submit dust suppression records to the Contracting Officer monthly or at the endo of the project if lasting less than one month.

3.8.3.3. MHAFB is required to maintain records of all fugitive dust complaints received. In the event of a complaint, notification will be provided to the Contractor in accordance with section 1.6 for notification.

3.8.4. Odors: MHAFB has an Air Quality Tier I Operating Permit which specifies requirements for control of odors. Do not allow, suffer, cause, or permit the emission of odorous gases, liquids, or solids to the atmosphere in such quantities as to cause air pollution.

3.8.4.1. MHAFB is required to maintain records of all odor complaints received. In the event of a complaint, notification will be provided to the Contractor in accordance with section 1.6 for notification.

3.8.5. Burning: Burning is prohibited on MHAFB.

3.8.6. Permit to Construct (PTC): An air quality PTC is required from Idaho Department of

Environmental Quality prior to construction or modification of stationary sources (buildings, structures, and installations) that emit, or may emit, pollutants into the air. Examples include boilers, generators, blast booths, and paint booths. PTCs are also required for certain portable equipment, such as generators, crushing equipment, asphalt plants, and concrete batch plants.

Portable rock crushers that meet certain criteria may operate under a permit by rule (PBR) instead of a PTC.

3.8.6.1. Coordinate with 366 CES/CEIE Air Quality Program Manager through the Contracting Officer to assist with determination of PTC requirements and/or exemptions for stationary sources.

3.8.6.2. Provide the Contracting Officer with a copy of the PTC or PBR with associated Form PERF for portable equipment prior to relocation of equipment to MHAFB.

3.8.6.3. Maintain all constructed facilities and portable pollution control devices for the duration of the contract or for that length of time construction activities create the particular pollutant.

3.8.7. Ozone Depleting Substances (ODS)

3.8.7.1. Products using Class I ODS are prohibited for use at MHAFB. Currently, the only Class I ODS waiver being approved for use on base is for aircraft fire suppression systems.

3.8.7.2. In order to comply with 40 CFR Part 82, Subpart F, coordinate the removal or replacement of all equipment containing ODS, such as refrigerants, with 366 CES/CEOIH (HVAC Shop) through the Contracting Officer during project planning.

3.8.7.3. Provide a copy of the EPA certification for Contractors servicing or disposing of air-condition and refrigeration equipment.

3.8.7.4. Provide a refrigerant Service Order Form (Attachment 4) with model and serial numbers to

366 CES/CEOIH through the Contracting Officer.

3.8.7.5. For equipment to be disposed of or recycled, remove in accordance with federal regulations.

For equipment where refrigerant is not purged due to reuse of the equipment, coordination with 366 CES/CEOIH (HVAC Shop) through the Contracting Officer is required in order to properly track certified equipment

3.9. NATURAL RESOURCES

3.9.1. Confine activities, equipment staging, and material staging within pre-approved site boundaries.

Any unapproved or unnecessary destruction of land resources shall be corrected at the

Contractor’s expense to the satisfaction of the Contracting Officer.

3.9.2. Minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat to protect threatened, endangered, species of concern, migratory birds, or otherwise protected animal and plant species, including their habitat in accordance with the

MHAFB Integrated Natural Resources Management Plan (INRMP), federal, state, regional, and local laws and regulations. Protection of migratory birds, particularly burrowing owls, is of particular concern on MHAFB.

3.9.3. Do not destroy any occupied bird nests. Burrowing owls may be present from March through

July and occupy abandoned badger holes. Coordinate with 366 CES/CEIE through the

Contracting Officer in February or March to perform site surveys for burrows in order to prevent conflicts during construction.

3.9.4. Coordinate with 366 CES/CEIE through the Contracting Officer prior to using any unpaved area for access, vehicular traffic, staging, stockpiling, or other Contractor activities.

3.9.5. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without special permission from the Contracting Officer except as otherwise specified or indicated. Do not cut or compact root zones.

3.9.6. Do not disturb, drive through, or fill areas designated as wetlands, for example playas.

3.9.7. Do not kill, drive on, burn, or otherwise destroy sagebrush.

3.10. PROTECTION OF CULTURAL RESOURCES

3.10.1. Definition: Cultural resources is defined as buildings, structures, objects, prehistoric and historical archaeological sites, human remains, and any other evidence of human activity, including but not limited to: old bottles, cans, whole or fractured tools, arrowheads, spear points, pictographs, historic graffiti, or pottery. Any man-made object may be a cultural resource, eligible for listing in the National Register of Historic Places. Identify all man-made objects discovered on the project site to the MHAFB Cultural Resource Manager (CRM) through the Contracting Officer.

3.10.2. Disturbance of Cultural Resources: Do not disturb any site that contains evidence of cultural resources. If evidence of cultural resources is discovered, stop work immediately and notify the

Contracting Officer. The Contracting Officer will then notify the CRM. The Contracting Officer will notify the Contractor when work may resume after consultation with the CRM is complete.

3.11. RADIOACTIVE MATERIALS

3.11.1. Request to bring radioactive materials or nuclear devices on MHAFB: Submit requests to bring radioactive materials or nuclear devices on MHAFB 30 calendar days prior to planned activities using the material or devices when applicable. Such devices include those required to test soil density by nuclear methods, lead paint meters, and any apparatus containing radioactive material. Submit all requests to the Contracting Officer for review by the MHAFB Installation

Radiation Safety Officer (IRSO) at the 366 AMDS/SGGB 208-828-7270. Include the following in the request:

3.11.1.1. A description of the proposed activities on Nuclear Regulatory Commission (NRC) Form 241, Report of Proposed Activities in Non-Agreement States. Include proposed activities, locations of use, and traffic routes to be used.

3.11.1.2. The procedures established to ensure the health and safety of personnel while the device is on MHAFB.

3.11.1.3. A current and valid copy of the applicable NRC or Agreement State license. The license must state MHAFB by name, or a copy of the NRC Form 241 must be an adjunct to the Agreement

State license for those areas of exclusive federal jurisdiction. In lieu of a license, submit a written certification of exemption from NRC licensing requirements, and cite the applicable exemption of 10 CFR 150.10 or 150.11.

3.11.1.4. The most current leak detection test results. Provide new results to the Contracting Officer if updating of the leak detection test is required during the project.

3.11.1.5. A copy of that part of the contract describing work to be done at MHAFB and the inclusive dates of the work.

3.11.1.6. Agreement State licensees using NRC regulated materials must supply a copy of the NRC

Form 241 (Attachment 5) approved by MHAFB’s NRC Region according to 10 CFR 150.20.

3.11.2. Prior Permission: Obtain written permission from the IRSO via Contracting Officer prior to bringing radioactive material onto MHAFB. Note: If overnight storage is required, written permission from the Government must explicitly allow storing the radioactive devices at MHAFB overnight.

3.11.3. Monitoring: The IRSO may make periodic checks to ensure proper radiation safety practices are being followed.

3.11.4. Suspension of unsafe operations: The IRSO is authorized to suspend unsafe operations involving the use of radioactive material on MHAFB.

3.12. MISCELLANEOUS

3.12.1. Exercise care when excavating/digging trenches. If unknown items (i.e. storage tanks, pipes, buried waste, etc.) are discovered during excavation or trenching activities, STOP WORK

IMMEDIATELY and contact the Contracting Officer. The Contracting Officer will coordinate with

366 CES/CEIE to ensure that proper procedures are followed for removal or abandonment.

3.12.2. Protection of Acoustic Environment: Use low noise emission equipment and products certified by the EPA to the maximum extent possible. Refer to 40 CFR 204 Noise Emission Standards for

Construction Equipment.

ATTACHMENTS:

Attachment 1 – MHAFB Contractors Hazardous Materials Reporting Form

Attachment 2 - MHAFB Contractor Hazardous Materials Monthly Usage Reporting Form

Attachment 3 - MHAFB Contractor Site Specific Contingency Plan

Attachment 4 - Service Order Form

Attachment 5 - NRC Form 241

(1) Page ___ of ____

ATTACHMENT 1

MHAFB Contractors Hazardous Materials Reporting Form

This form is a request to bring hazardous materials onto MHAFB. Please fill it out to the best of your knowledge and provide it to the Contracting Office. It will be evaluated by the Installation Hazardous Materials Manager. You will need to provide manufacturer specific Safety Data Sheets upon request if further evaluation is needed.

MHAFB CONTRACTORS HAZARDOUS MATERIALS REPORTING FORM

1. Company Name and Contact Information 2. Project Name 3. Arrival and est End Dates

4. Date of this Submission

5. On-site Company POC Name and Phone Number

6. Govt. CO/QAE Name and Phone Number

7. EESOH-MIS

Account # (if assigned)

8. Project Location

9. Manufacturer and Product Name and Description (ex: Sherwin Williams gloss white latex paint)

10. NSN / MSN /

Part Number / Product ID Number

11. Container Type (can, tube, drum, bag, etc)

12. Container Size (LB, OZ, GL, PT, QT )

13. Total Quantity Used

(1) Page ___ of ____

ATTACHMENT 2

MHAFB Contractor Hazardous Materials Monthly Usage Reporting Form

This form is for reporting usage of hazardous materials on MHAFB if the duration of the project exceeds 30 days.

Please fax it monthly to the Contracting Officer who will forward it to the Installation Hazardous Materials Manager for tracking input.

Contractor/Company Name:____________________________________ MTH Number:__________

Building number or project location: _____________________________________________________

HM POC Name/Number:____________________________________________ Date:____________

Manufacturer and Product

Name/Description

(ex: Sherwin Williams gloss white paint)

NSN or Part #

(if applicable)

Container Type

(can, tube, drum, bag, etc)

Container Size

(LB, OZ, GL,

PT, QT)

Number of

Containers Used

This Reporting

Period

Attachment 3

MHAFB CONTRACTOR SITE SPECIFIC CONTINGENCY PLAN

Company/Contractor Name: _____________________________________________________________ Contract or Project Number: _____________________________________________________________

General description of work:_______________________________________________________

1. RESPONSIBLE PERSONS

A. Primary Person Name: ___________________________________ Title: ______________________________________ Work Phone: ______________________________ Home Phone: _______________________________

B. Alternate Person Name: ___________________________________ Title: ______________________________________ Work Phone: ______________________________ Home Phone: _______________________________

2. SPECIAL PRECAUTIONARY MEASURES FOR BUILDING(S) AND ASSOCIATED AREAS

If more than one building, specify hazardous materials for those buildings.

Building(s) Number/location: _____________________________________________________________

A. Avoid contacts with spilled substances.

B. Refer to Safety Data Sheets (SDS) for particular hazards and precautionary measures for special handling and spill procedures. Flammable materials will be extinguished as to local fire regulations and the material safety data sheets. If needed, list any materials that need special handling, PPE or special precautionary measures.

3. EMERGENCY SPILL EQUIPMENT ON HAND

(For example, sweeping compound and absorbent material, brooms and plastic dust pans, emergency spill kits, non- sparking shovels, other items as needed and required)

4. HAZARDOUS MATERIAL AND QUANTITY NORMALLY ON HAND

Attach a listing of hazardous materials on hand along with SDS. Contact Hazardous Materials Program Manager as needed phone 208-828-1784/6351 Building 1297.

5. SPILL RESPONSE AND NOTIFICATION PROCEDURES

A. INITIAL SPILL RESPONSE ACTIONS.

If a spill occurs, the person discovering the spill will make every effort to take the following actions as soon as possible:

1. STOP THE PRODUCT FLOW – Stop transfers, secure pumps, close valves, etc;

2. WARN PERSONNEL – Sound alarms, enforce safety and security measures;

3. SHUT OFF IGNITION SOURCES (if possible) and LIMIT ACCESS to the affected area.

4. MAKE NOTIFICATIONS – If the spill is considered an emergency and there is a potential life health fire, or other safety hazard, the MHAFB will be notified immediately (208-828-1117). In addition, report the spill to the shift supervisor and the Environmental Office.

5. BEGIN CLEANUP

Safety First – Do not attempt to perform any life or health threatening acts.

B. REPORT THE SPILL.

If you observe a release of a hazardous material, report it to your supervisor and the MHAFB Fire

Department by calling 911 if using a phone on the MHAFB system or 208-828-1117. (*NOTE: Calling

911 from a cell phone or an off-base phone system will reach emergency services at the City of Mountain

Home and then will be rerouted to MHAFB delaying response). MHAFB Fire Department will initiate the notification system via the established MHAFB notification system. Notify the contracting officer (CO) of all spills regardless of substance or quantity. Contractor is responsible for completing and submitting the

‘Environmental Hazardous Material Release Report’. The CO will coordinate with 366 CES/CEIEC

(Environmental) 208-828-6351 to ensure that all spills have been properly contained, cleaned-up, and reported. Environmental does all the necessary and required reporting to Federal, State and local agencies.

When the contractor reports a spill, he must note if the spill falls into 1 of the 3 categories:

Class I Spill: Less than 2 lineal feet in any plane dimension Class II Spill: Not over 10 lineal feet in any plane; not over 50 square feet; and not of a continuous nature Class III Spill: Over 10 lineal feet in any one dimension; over 50 square feet; and/or of a continuous nature

CONTRACTOR SUPERVISOR (to notify in case of spill) Name: _________________________________ Title: ________________________________________ Work Phone: ____________________________ Cell Phone: __________________________________

FIRE DEPARTMENT: Phone/Landline: 911; Cell phone user call (208) 828-1117

ENVIRONMENTAL: (208) 828-6351

This plan must be turned in to the POL/Tanks Program Manager for review, prior to storage or start of work with hazardous materials via fax (208-828-2194) or email: Thomas.Kendall@us.af.mil.

Responsible Person Name Signature Date mailto:Thomas.Kendall@us.af.mil

ENVIRONMENTAL HAZARDOUS MATERIAL RELEASE REPORT

The following information is required on all-accidental releases or spills. Information shall be completed in full by applicable shift supervisor on duty at the time of the incident. The Fax completed form to (208-828-2194) or e-mailed to Thomas Kendall (Thomas.Kendall@us.af.mil) immediately. If you have any questions, please contact us at 208-828-6351.

A. SPILL INFORMATION.

Name/Phone/Unit of individual reporting the spill:_____________________________________________ Date and Time: _______________________________________________________________________ Spill Location (Building Number, etc.):______________________________________________________ Name of spilled material:________________________________________________________________ Amount spilled: _______________________________________________________________________ Rate currently spilling:__________________________________________________________________ Extent of spill. Did it enter any drains, soil or surface water? ____________________________________ Root cause of the release? ______________________________________________________________ Was the MHAFB Fire Department notified? _________________________________________________ Release Classification: □ Class I □ Class II □ Class III Corrective Action Taken:________________________________________________________________ Injuries, if any:________________________________________________________________________ Was the spill/release cleaned up within 24 hours?:____________________________________________

B. STOP OR CONTAIN THE SPILL.

Assess the situation before attempting to contain any hazardous material spilled and proceed only if it is safe to do so.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .