Aerial_Targets_PWS_App_I_(Illustrations)_02_Sept_14_(Final).pdf

PDF 2 MB Posted

Attached to
Aerial Targets Federal contract opportunity
Solicitation number
FA4890-14-R-0012
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Targets, newest first.
File Type Posted
Amendment_0001.pdf PDF
Final_RFP_Ques__Govt_Resp_(FBO_30Dec14).pdf PDF
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).docx DOCX document
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).pdf PDF
AT_PPC_Safety_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
AT_PPC_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
CBA_Aerial_Tgts_Holloman_ _DS2_7May12-1May15.pdf PDF
CBA_Aerial_Tgts_Tyndall_ _DS2_5Aug13-31Jul16.pdf PDF
Aerial_Targets_PWS_App_G_(Quality_Managment_System)_02_Sept_14_(Final)_Updated_14Nov14.pdf PDF
CDRL_A010_DD1423_GFE_Inventory.pdf PDF
CDRL_A002_DD1423_Cost_Performance_Report.pdf PDF
CDRL_A007_DD1423_Property_Control_Plan.pdf PDF
CDRL_A008_DID_DI-IPSC-81427A_Software_Development_Plan_(SDP).pdf PDF
CDRL_A014_DID_DI-IPSC-81488_Computer_Software_Product.pdf PDF
CDRL_A005_DID_DI-ENVR-81378_Environ_Operation_ _Maint_(O M)_Plan.pdf PDF
CDRL_A007_DID_DI-MISC-81420_Property_Control_Report.pdf PDF
CDRL_A014_DD1423_RIS_SW_Code_Doc.pdf PDF
CDRL_A006_DD1423_Safety_ _Health_Program.pdf PDF
CDRL_A001_DD1423_Monthly_Summary_Report.pdf PDF
CDRL_A013_DD1423_CSIR.pdf PDF
CDRL_A012_DID_DI-SAFT-81563_Accident-Incident_Report.pdf PDF
CDRL_A003_DD1423_Management_Plan.pdf PDF
CDRL_A012_DD1423_Incident_Report.pdf PDF
CDRL_A020_DD1423_SW_Improvement_Report.pdf PDF
CDRL_A008_DD1423_Software_Development_Plan_(SDP).pdf PDF
CDRL_A015_DD1423_Recomp_Info_for_Bidder_Library.pdf PDF
CDRL_A004_DID_DI-MISC-80392_Operating_Instructions.pdf PDF
CDRL_A001-01_TAB_FSAT_O M.docx DOCX document
CDRL_A004_DD1423_Operating_Instructions.pdf PDF
CDRL_A005_DD1423_Environmental_Protection_Program.pdf PDF
CDRL_A011_TAB_Spill_Report_Form.doc DOC document
CDRL_A013_DID_DI-DRPR-80151A_Comm-Computer_Systems_Install_Records_(CSIRs).pdf PDF
CDRL_A011_DID_DI-SAFT-80494A_Pollution_Incident_Report.pdf PDF
CDRL_A010_DID_DI-ILSS-81251_Equip_Inventory_Records_(EIRs).pdf PDF
CDRL_A017_DID_DI-IPSC-81442A_Software_Version_Descrip_(SVD).pdf PDF
CDRL_A002_DID_DI-MGMT-80227_Contractor's_Progress-Status-Mgmt_Report.pdf PDF
CDRL_A009_DID_DI-MISC-80393A_Master_Document_List_(MDL).pdf PDF
CDRL_A001_DID_DI-ADMN-80447A_Contract_Summary_Report.pdf PDF
CDRL_A019_DD1423_SW_Test_Report.pdf PDF
CDRL_A016_DD1423_Technical_Reports.pdf PDF
Aerial_Targets_PWS_App_K_(Wkld_Data)_02_Sept_14_(Final).doc DOC document
Aerial_Targets_PWS_App_J_(Proposal_Inc)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_H_(GFV)_02_Sept_14_(Final).docx DOCX document
Aerial_Targets_PWS_App_G_(Quality_Mgmt_System)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_F_(Incentive-Awd_Fee_Plan)_2_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_E_(GFF)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_D_(GFE)_02_Sept_14_(Final).docx DOCX document
Aerial_Targets_PWS_App_C_(Pubs_ _Forms)_02_Sept_14_(Final).docx DOCX document
Aerial_Targets_PWS_App_A_(Definitions)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_02Sep14_(Final).pdf PDF
Show all 50

Aerial Targets has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AERIAL TARGETS PWS

Solicitation No. FA4890-14-R-0012

APPENDIX I- LIST OF FIGURES

I-1 02 Sept 14

Figure 1. Typical SSAT Maintenance Flow

Figure 2. Typical FSAT Maintenance Flow

Figure 3. FSAT F110 Engine CONOPS

Figure 4. FSAT F100 Engine CONOPS

Figure 5. Range Instrumentation Overview

Figure 6. GRDCS/DLS/DLS-r Sites

Figure 7. Radio Systems Distribution

Figure 8. Radio Sites

Figure 9. Command Destruct System (Drone)

Figure 10. Command Destruct System (Missile)

Figure 11. APTM Data System

Figure 12. RICS TPS-75 Data to GRDCS

Figure 13. JTIDS Data Link

Figure 14. GRDCS Data Link to Eglin

Figure 15. Mission Video Distribution

Figure 16. Wind Site Data System

I-2 02 Sept 14

Figure 1. Typical SSAT Maintenance Flow (Sheet 1 of 3)

PERFORM

RECEIPT/ACCEPTANCE

INSPECTION

STORE

TARGET

INTEGRATED

CHECKOUT

ENGINE RUN

INSTALL

MUNITIONS

INSTALL

RECOVERY

SYSTEM

TRANSPORT TO

LAUNCHPAD

DETERMINE

CONFIGURATION IR?

SLICK

WING?

EA?

INSTALL

APC-4 PODS

RECEIVE TARGET THROUGH

NORMAL SUPPLY CHANNELS

FUEL

TARGET

PERFORM PREFLIGHT

INSPECTION

CONT’D

ON

SHEET 2

I-3 02 Sept 14

Figure 1. Typical SSAT Maintenance Flow (Sheet 2 of 3)

PERFORM PREP FOR

LAUNCH

PERFORM WEIGHT AND

BALANCE

PERFORM RATO

ALIGNMENT/ BUILD-UP/

INSTALLATION

UPLOAD

PAYLOADS

SLICK?

IR?

INSTALL

CHAFF/FLARE IF

REQUIRED

PERFORM

PRELAUNCH

CHECKS

LAUNCH

DRONE

EA?

INSTALL DRONE ON

LAUNCH RAIL

INSTALL

SQUIBS

INSTALL

DLQ-9 PODS

INSTALL

CHAFF

INSTALL

FLARES

CONT’D

ON

SHEET 3

FROM

SHEET 1

I-4 02 Sept 14

Figure 1. Typical SSAT Maintenance Flow (Sheet 3 of 3)

PERF0RM

SALTWATER

DECONTAMINATION

WATER

RECOVERY?

PERFORM POST

FLIGHT

INSPECTION

LAND

RECOVERY?

DRONE

DAMAGED?

FIELD LEVEL

REPAIR?

DEPOT LEVEL

REPAIR?

PROCESS PART

FOR RETURN TO

DEPOT

NO DAMAGE

RECOVER

DRONE

DISPOSE OF

PART LOCALLY

COMPLETE

COMPOSITE

REPAIR AS

REQUIRED

RETURN DRONE TO

SERVICE

COMPLETE

FUEL SYSTEM

REPAIR AS

REQUIRED

COMPLETE

ENGINE

REPAIR AS

REQUIRED

COMPLETE

AVIONICS

REPAIR AS

REQUIRED

GO TO FIELD

LEVEL

REPAIR

FROM

SHEET 2

I-5 02 Sept 14

D R

O N

E

PMT A and B; Follow

-6 inspections

Remove CAD/PAD

Begin Deman

-220 Engine? Swap Engine to -200D Y

PMT A/B

Current?

N

Aircraft

Delivered

Perform acceptance inspection, which includes records check/update, BPO, bore scope eng, ATP and safe flight

Is engine a

“ferry” engine?

Swap engine, ship

“ferry” engine back to AMARG

S A

F

Y

M A

N N

More than 50 acft hrs remaining?

Engine Cycles remaining?

QF-16 flown Manned for MCS/FCS/PP Swap

Engine

N

Y

N

N

Y

Maintain IAW the -6 series T.O.s and as supplemented

200 hr service life Block 15

300 hr service life Blocks 25 & 30

Maintain IAW the -6 series T.O.s and as supplemented

200 hr service life Block 15 300 hr service life Blocks 25 & 30

I-6 02 Sept 14

Figure 2. Typical FSAT Maintenance Flow (2 Pages)

R

O

Engine Start

Destruct Checks

NULLO Prep

Preflight Checks and Bomb build

Launch

N U

L L

O F

L

IG

H T

Drone Flight

Terminated?

Recover

Is Drone

Serviceable?

Y

Drone Code D (Destroyed)

Y

N

N

Sufficient service life?

Request Govt disposition

I-7 02 Sept 14

Figure 3. FSAT F110 Engine CONOPS

Figure 4. FSAT F100 Engine CONOPS

I-8 02 Sept 14

Figure 5. Range Instrumentation Overview

Figure 6. GRDCS/DLS/DLS-r Sites

TOWER N2 ST GEORGE

ISLAND DATA LINK AND

ANTENNA SYSTEM

TOWER N4 OFF SHORE

DATA LINK AND

ANTENNA SYSTEM

I-9 02 Sept 14

Figure 7. Radio System Distribution

Figure 8. Radio Sites

I-10 02 Sept 14

Figure 9. Command Destruct System (Drone)

Figure 10. Command Destruct System (Missile)

I-11 02 Sept 14

Figure 11. APTM Data

Figure 12. RICS TPS-75 Data to GRDCS

I-12 02 Sept 14

Figure 13. JTIDS Data Link

Figure 14. GRDCS Data Link to Eglin

I-13 02 Sept 14

Figure 15. Mission Video Distribution

Figure 16. Wind Site Data System

File details come from the government source that posted it. Updated .