01.1-FBNV160609-Specifications-Vol_2.pdf
PDF 2 MB Posted
- Attached to
- Construct Guardian Angel AFE Shop Federal contract opportunity
- Solicitation number
- FA487718B0004
About this file
Volume 2 Specifications - updated 29 Aug 18
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Prepared for
Volume 2 of 3 31 July 2018 29 August 18
Guardian Angel AFE 100% Design Submittal 19 May 2017
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
VOLUME 2 of 3
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 33 00 SUBMITTAL PROCEDURES
Submittal Register
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, PORCELAIN TILING
09 67 23.13 STANDARD RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
VOLUME 3 of 3
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 82 01.00 10 WARM AIR HEATING SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 13.00 40 MEDIUM-VOLTAGE CABLES
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
PROJECT TABLE OF CONTENTS Page 3
DIVISION 31 - EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 15 00 AGGREGATE SURFACE COURSE
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 SANITARY SEWERS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes a new AFE shop building for Guardian Angel at Davis-Monthan AFB. The project includes structural, mechanical, plumbing, electrical, fire protection, telecommunications, architectural elements, related site work and utilities, and incidental related work. All construction will be in compliance with current applicable Building Codes, United Facilities Criteria (UFC's), Engineering Technical Letters (ETL's), Air Force Instruction (AFI's), and the Base Design Compatibility Guidelines (DCG).
Three options shall be priced separately than the base proposal. These options are described in the contract drawings, but are summarized below:
a. BID OPTION 1: All construction work associated with adding one additional bay to the new building as shown in the contract drawings.
This option includes any additional structural, mechanical, plumbing, electrical, fire protection, telecommunications, architectural elements, related site work and utilities, and incidental related work associated with adding this additional bay.
b. BID OPTION 2: All construction work associated with adding a masonry wainscot around the building perimeter, as shown in the contract drawings. This option includes any additional structural, architectural elements, related site work and utilities, and incidental related work associated with adding this masonry wainscot.
A price shall be provided for adding to the base bid floor plan as well as for OPTION 01 extended floor plan.
c. BID OPTION 3: All construction work associated with adding translucent panels as shown in the contract drawings. This option includes any additional structural, architectural elements, and incidental related work associated with adding these translucent panels. A price shall be provided for adding to the base bid floor plan as well as for OPTION 1 extended floor plan.
d. BID OPTION 4: All construction work associated with adding epoxy floor coating in the parachute shop area, as shown in the contract
SECTION 01 11 00 Page 1 drawings. This option includes any additional structural, architectural elements, and incidental related work associated with adding the epoxy coating. A price shall be provided for adding to the base bid floor plan as well as for OPTION 1 extended floor plan.
1.2.2 Location
The work is located at the Davis-Monthan AFB, southwest of Building 4824, adjacent to South Phoenix Street and Mike Flores Street, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Adjacent building(s) will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches.
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Verify existing utility locations indicated on contract drawings, within area of work.
The Contractor is responsible for and shall process all digging permits and bluestake requirements through the 355 CES Customer Service Desk (Building 5315). The Contractor shall allow for approximately 21 calendar days for the construction areas to be properly marked. The Contractor is also responsible for contacting Arizona Blue Stake and independently marking and potholing for security camera conduit/wiring around the base;
and vacuum and oxygen medical lines around the 355 Medical Group.
Although the 355 CES Drawing Vault has drawings for security camera conduit/wiring and medical lines, it is not responsible for the bluestaking or actual location of these utilities. The Contractor must mark all areas that he wishes to have the Government bluestake with white paint PRIOR to the submission of the AF Form 103; and shall include a site drawing of the area to be bluestaked with the submission. Upon submission, the Contractor shall provide the Contracting Officer the tracking number in order for the Government to help the Contractor track its progress (if necessary). Once a construction site has been marked, it is the Contractor's responsibility to maintain the markings with stakes or whiskers.
SECTION 01 11 00 Page 2
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.6 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
No government-furnished material and equipment will be provided as part of this project
1.7 GOVERNMENT-INSTALLED WORK
The Government will furnish and install the storage racks noted on the contract drawings. Coordinate the scheduling and phasing of the work affected by the installation of the storage racks with the Contracting Officer. Coordinate all power, fire protection, and anchorage requirements with the Contracting Officer prior to completing the work.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. Contractor to provide a complete work schedule and phasing plan to the Contracting Officer prior to commencement of construction activity.
Facility shall remain in complete operation during regular work hours for the entirety of construction. All outages shall be coordinated with the base utility shop through the Civil Engineer (CE) Project Manager/Inspector.
b. Utility Outages: Accomplish all work required in connection with utility outages on weekends or off-duty hours, or as directed by the Contracting Officer. The Contractor shall be responsible for all work associated with the utility outages. Notify the Contracting Officer in writing 21 calendar days prior to the desired date for the utility outage.
c. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
d. The Road Closures: If road closures are needed during the construction of any portion of the project, a traffic control plan shall be generated by the Contractor and submitted for approval by the Contracting Officer. Notify the Contracting Officer in writing 21 calendar days prior to the desired date for closure.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an
SECTION 01 14 00 Page 1 emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Identification Badges and Installation Access
Installation access is provided by the issuance of a Contractor's Badge.
All Contractors/Sub-contractors/individuals working on the project will be required to obtain a Contractor's Badge to gain access on to the installation and job site. The required background information of every individual involved with the project and obtaining access to the installation will be submitted to the Contracting Officer on the access request form provided by the Government. The Contracting Office is responsible for submitting the documentation to the Base Security Forces.
Processing of the Contractor's Badging requires approximately five (5) working days once received by the Base Security Forces. Contactor's Badges must be obtained by the individual in person at the Base Visitor's Center/Pass and ID. Immediately report any instances of lost or stolen badges to the Contracting Officer.
All passes issued must be returned to the Contracting Officer upon termination of the employee or completion of the project, whichever is sooner.
1.3.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period established by the Contractor Officer, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Exclusionary Period
No work must be performed during irregular working hours, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract.
1.3.5 Occupied Buildings
The Contractor shall be working around existing buildings which are
SECTION 01 14 00 Page 2 occupied. Do not enter the buildings without prior approval of the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located around the construction area, during the construction period.
Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.
1.3.6 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and gas are considered utility cutovers pursuant to the paragraph
WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.4 SECURITY REQUIREMENTS
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area,".
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 3
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work).
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices or Earned Value Report
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, SECTION 01 33 00 Page 1 instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
Extensions of design submittals.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
SECTION 01 33 00 Page 2
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.1.2 Approving Authority
Office or designated person authorized to approve submittal.
SECTION 01 33 00 Page 3
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor QC approval.
Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.3.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered to be "shop drawings."
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Source Drawings for Shop Drawings
The entire set of Source Drawing files (DWG) will not be provided to the Contractor. Only those requested by the Contractor to prepare shop drawings may be provided. Request the specific Drawing Number only for the preparation of Shop Drawings. These drawings may only be provided after award.
1.4.2.1 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
SECTION 01 33 00 Page 4
These electronic Source Drawing files are not construction documents.
Differences may exist between the Source Drawing files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic Source Drawing files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished Source Drawing files, the signed and sealed construction documents govern. The Contractor is responsible for determining if any conflict exists. Use of these Source Drawing files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic Source Drawing files for use in producing construction data related to this contract, remove all previous indicia of ownership (seals, logos, signatures, initials and dates).
1.5 QUANTITY OF SUBMITTALS
1.5.1 Number of Copies of SD-02 Shop Drawings
Submit six copies of submittals of shop drawings requiring review and approval only by QC organization and seven copies of shop drawings requiring review and approval by Contracting Officer.
1.5.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions
Submit in compliance with quantity requirements specified for shop drawings.
1.5.3 Number of Samples SD-04 Samples
a. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by approving authority and one will be returned to Contractor.
b. Submit one sample panel or provide one sample installation where directed. Include components listed in technical section or as directed.
c. Submit one sample installation, where directed.
d. Submit one sample of non-solid materials.
1.5.4 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
1.5.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.
SECTION 01 33 00 Page 5
1.5.6 Number of Copies of SD-10 Operation and Maintenance Data
Submit five copies of O&M Data to the Contracting Officer for review and approval.
1.5.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
Unless otherwise specified, submit two sets of administrative submittals.
1.6 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.7 SUBMITTAL REGISTER
a. AF Form 66, Schedule of Material Submittals: An AF Form 66, listing the items of equipment and materials for which submittals are required by the specifications, is provided for the Contractor's use. The Contractor shall complete the column "Required Submission Date" and submit to the Contracting Officer for approval within 10 calendar days after Notice to Proceed. The approved submittal register will become the scheduling document and will be used to control submittals throughout the life of the contract. During construction, it may be discovered that this list was not all-inclusive and that additional submittals may be required from and shall be submitted by the Contractor, as directed by the Contracting Officer.
b. AF Form 3000, Material Approval Submittal:
1. The AF Form 3000 shall be used for submitting both
Government-approved and information-only submittals in accordance with the instructions on the reverse side of the form. The Contracting Officer shall furnish these forms to the Contractor.
This form shall be properly completed by filling out the heading blanks and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the information submitted for each item(s).
2. The Contractor shall forward all material submittals required by the technical specifications using the AF Form 3000 as stated in paragraph b1 above. The Contractor provides the submittals in the number of copies as specified on the AF Form 66 and one original of the completed AF Form 3000 to the Contracting Officer no later than the required submission date specified on the AF Form 66 or 10 calendar days from the Notice to Proceed, whichever is later.
3. Identify each submittal by project, Contractor, drawing or detail number, and specification section number, as appropriate. Mark
SECTION 01 33 00 Page 6 submittals to show the specific item(s) that will be furnished.
Include intended use of the submittal and any other pertinent information necessary for a complete Evaluation. If the Contractor provides a submittal which show variations from the contract documents, the Contractor shall completely describe such variations in writing clearly and separately from any other portion of the submittal. Highlighting or marking in any manner the proposed variations is not sufficient to comply with this requirement. This requirement applies irrespective of the provisions of any specification which follow this section and which may be particular to specific item(s).
c. Submit to the Contracting Officer complete information applicable to the item(s) of equipment and materials called for by the Contract Documents, for approval, prior to installing the relevant item(s) of equipment and material. If unapproved item(s) of equipment or material are installed, the Contracting Officer, at his sole discretion and option, may reject the installed equipment and material. If rejected, the Contracting Officer may then pursue, again in his sole discretion and option, remedies including but not limited to the removal and reinstallation of approved item(s) of equipment or material at the Contractor's expense, extended warranties, and other remedies as may be deemed appropriate and applicable to that portion of the construction.
d. Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled.
e. Adequate time (a minimum of 14 calendar days) shall be allowed and shown on the register for distribution, review and approval by both or either the Project Inspector and Contracting Officer.
f. The Contractor, as part of the bid price, shall have a Government-approved, independent, commercial, testing laboratory perform all sampling and testing as called for in these specifications. Test reports shall be properly sealed by a professional engineer.
1.8 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.8.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
SECTION 01 33 00 Page 7
1.8.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
1.8.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.8.4 Review Schedule Extension
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.9 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals. An additional 15 calendar days will be allowed and shown on the register for review and approval of submittals for refrigeration and HVAC control systems.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.10 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
SECTION 01 33 00 Page 8
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date submittals. 3 copies of the submittal will be retained by the Contracting Officer and 3 copies of the submittal will be returned to the Contractor.
1.10.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.11 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.12 APPROVED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that
SECTION 01 33 00 Page 9
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for the satisfactory construction of all work design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.13 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 10
S U
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
G u a rd ia n
A n g e l A
F E
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.8
G S a lv a g e P la n
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.3
.1 .1
G L is t o f
C o n ta c t
P e rs o n n e l
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.7
G S u b m it ta l R e g is te r
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.7
G A c c id e n t P re v e n ti o n P la n
A
P P
S D
-0
T e s t
R e p o rt s
.4
M o n th ly E x p o s u re R e p o rt s
.1
N o ti fi c a ti o n s a n d
R e p o rt s
.1
.2
G A c c id e n t R e p o rt s
.1
.3
L H
E I n s p e c ti o n R e p o rt s
S D
-0
C e rt if ic a te s
.6
.1 .4
C ra n e
O p e ra to rs
/R ig g e rs
.7
.2 .2
G S ta n d a rd L if t
P la n
.7
.2 .3
G C ri ti c a l L if t
P la n
.8
A c ti v it y H a z a rd A n a ly s is
A
H A
.9
.1 C o n fi n e d
S p a c e
E n tr y P e rm it
.9
.1 H o t
W o rk P e rm it
.1
.4
C e rt if ic a te o f
C o m p lia n c e
.1
L ic e n s e
C e rt if ic a te s
.1
.1
G R a d io g ra p h y O p e ra ti o n P la n n in g
W o rk S h e e t
.1
.1
G P o rt a b le G a u g e
O p e ra ti o n s
P la n n in g
W o rk s h e e t
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
G u a rd ia n
A n g e l A
F E
.0
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.2
G C o n tr a c to r Q u a lit y C o n tr o l (C
Q C
P la n
S D
-0
T e s t
R e p o rt s
.9
.2 V e ri fi c a ti o n S ta te m e n t
S D
-0
T e s t
R e p o rt s
.1
.1 B iw e e k ly
R e p o rt s
S D
-0
C e rt if ic a te s
.1
F a b ri c a ti o n P la n t
.1
A C
A c c re d it a ti o n
.1
C e rt if ic a te o f
C o m p lia n c e
.5
G S p e c ia l In s p e c to r
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.3
G C o n s tr u c ti o n S it e
P la n
.4
.1 G
T ra ff ic
C o n tr o l P la n
S D
-0
T e s t
R e p o rt s
.4
B a c k fl o w P re v e n te r T e s ts
S D
-0
C e rt if ic a te s
.4
.1 B a c k fl o w T e s te r
.4
B a c k fl o w P re v e n te rs
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.6
.1 P re c o n s tr u c ti o n S u rv e y
.1
G
S o lid W a s te
M a n a g e m e n t
P e rm it
.6
.2 G
R e g u la to ry N o ti fi c a ti o n s
.7
G E n v ir o n m e n ta l P ro te c ti o n P la n
.2
.1 .2
G S to rm w a te r
N o ti c e o f
In te n t
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
G u a rd ia n
A n g e l A
F E
.7
.9 .1
G D ir t a n d D u s t
C o n tr o l P la n
.6
.5 G
E m p lo y e e T ra in in g
R e c o rd s
.6
.4 G
E n v ir o n m e n ta l M a n a g e r
Q u a lif ic a ti o n s
S D
-0
T e s t
R e p o rt s
.7
.1 .1
.2 L a b o ra to ry
A n a ly s is
.2
.1 .3
In s p e c ti o n R e p o rt s
.7
.2 .1
G S o lid
W a s te
M a n a g e m e n t
R e p o rt
S D
-0
C e rt if ic a te s
.6
.5 G
E m p lo y e e T ra in in g
R e c o rd s
S D
-1
C lo s e o u t S u b m it ta ls
.2
.1 .4
G S to rm w a te r
P o llu ti o n P re v e n ti o n
P la n C o m p lia n c e
N o te b o o k
.2
.1 .5
G S to rm w a te r
N o ti c e o f
T e rm in a ti o n
.7
.1 G
W a s te
D e te rm in a ti o n
D o c u m e n ta ti o n
.7
.3 .6
G D is p o s a l D o c u m e n ta ti o n f o r
H a z a rd o u s a n d
R e g u la te d W a s te
.6
.5 G
A s s e m b le d
E m p lo y e e T ra in in g
R e c o rd s
.1
G
S o lid W a s te
M a n a g e m e n t
P e rm it
.7
.2 .1
G S o lid
W a s te
M a n a g e m e n t
R e p o rt
.7
.3 .1
G H a z a rd o u s W a s te
/D e b ri s
M a n a g e m e n t
.6
.2 G
R e g u la to ry N o ti fi c a ti o n s
.7
.2 .1
G S a le s D o c u m e n ta ti o n
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
G u a rd ia n
A n g e l A
F E
S D
-0
P ro d u c t
D a ta
.5
.1 W a rr a n ty M a n a g e m e n t P la n
.5
.4 W a rr a n ty T a g s
.4
S p a re
P a rt s D a ta
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.5
.1 In s tr u c ti o n s
S D
-1
O p e ra ti o n a n d
M a in te n a n c e
D a ta
.3
G O p e ra ti o n a n d
M a in te n a n c e
M a n u a ls
S D
-1
C lo s e o u t S u b m it ta ls
.1
G A s -B u ilt
D ra w in g s
.2
G S p a c ia l D a ta
M a p
S D
-1
O p e ra ti o n a n d
M a in te n a n c e
D a ta
.3
G O
M
D a ta b a s e
.1
.1 G
T ra in in g P la n
.1
.3 G
T ra in in g O u tl in e
.1
.2 G
T ra in in g C o n te n t
S D
-1
C lo s e o u t S u b m it ta ls
.1
.4 G
T ra in in g V id e o R e c o rd in g
.1
.6 G
V a lid a ti o n o f T ra in in g
C o m p le ti o n
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.6
.3 .1
C o n c re te C u ri n g P la n
.6
.6 G
Q u a lit y C o n tr o l P la n
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
G u a rd ia n
A n g e l A
F E
.6
.7 G
Q u a lit y C o n tr o l P e rs o n n e l
C e rt if ic a ti o n s
.6
.7 Q u a lit y C o n tr o l O rg a n iz a ti o n a l
C h a rt
.6
.9 G
L a b o ra to ry A c c re d it a ti o n
S D
-0
S h o p
D ra w in g s
.6
.2 .1
G R e in fo rc in g
S te e l
S D
-0
P ro d u c t
D a ta
.4
.8 J o in t
S e a la n ts
.4
.7 J o in t
F ill e r
.1
M a te ri a ls f o r
F o rm s
.4
.1 C e m e n ti ti o u s M a te ri a ls
.4
.6 V a p o r
R e ta rd e r
.3
.3 C o n c re te C u ri n g M a te ri a ls
.5
R e in fo rc e m e n t
.6
.1 L iq u id C h e m ic a l F lo o r H a rd e n e r
.4
.5 A d m ix tu re s
.5
.2 M e c h a n ic a l R e in fo rc in g
B a r
C o n n e c to rs
.6
.3 .3
F in is h in g
P la n
S D
-0
D e s ig n D a ta
.3
.1 G
M ix
D e s ig n
S D
-0
T e s t
R e p o rt s
.6
.1 .1
G C o n c re te M ix D e s ig n
.6
.4 .1
F ly
A s h
.6
.4 .1
P o z z o la n
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P A
G E
S
G u a rd ia n
A n g e l A
F E
.6
.4 .2
G ro u n d G ra n u la te d
B la s t-
F u rn a c e
S la g
.4
.3 A g g re g a te s
.9
.2 .1
T o le ra n c e
R e p o rt
.1
.2
.3 G
C o m p re s s iv e S tr e n g th T e s ts
.1
.2
.1 S lu m p T e s ts
.4
.2 W a te r
S D
-0
C e rt if ic a te s
.5
.1 R e in fo rc in g
B a rs
.6
.3 .4
V O
C C o n te n t fo r F o rm
R e le a s e
A g e n ts
C u ri n g C o m p o u n d s a n d
C o n c re te P e n e tr a ti n g S e a le rs
.6
.3 .5
M a te ri a l S a fe ty D a ta
S h e e ts
.6
.7 .2
F ie ld T e s ti n g T e c h n ic ia n a n d
T e s ti n g A g e n c y
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.6
.1 L iq u id C h e m ic a l F lo o r H a rd e n e r
.3
.3 C u ri n g C o m p o u n d
S D
-0
S h o p
D ra w in g s
.3
.2 .1
G C u t
C M
U
.4
.1 .1
G D e ta il D ra w in g s
S D
-0
P ro d u c t
D a ta
.5
.1 G
H o t W e a th e r P ro c e d u re s
.5
.2 G
C o ld W e a th e r P ro c e d u re s
.4
.1 .1
G C e m e n ti ti o u s M a te ri a ls
.5
.1 G
In s u la ti o n
S U
B M
IT
T
A L
R E
G
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.