Q A_FA4877-14-Q-0173.pdf
PDF 72 KB Posted
- Attached to
- Sunshade Integrity Check
- Solicitation number
- FA4877-14-Q-0173
About this file
Sunshade Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sunshade_Blue_Prints.pdf | ||
| Integrity_Check_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for Solicitation FA4877-14-Q-0173
Q1. Are the structural drawings available for review?
A1. Yes, they are now available on FBO.
Q2. How many different types and total number of sunshades are being inspected?
A2. There is only one type of sunshade and only one will be inspected.
Q3. Since the requirement is not a construction project, is it still required to have an on-site manager as mentioned in Section 2.1?
A3. When the analysis is done on-site an on-site manager will be required. An on-site manager is not required when work is done in-house. On-site manager refers to a person who can be in charge and has immediate contact with a decision maker within the company if needed.
Q4. What is the intent of including roof decking reflective value? Is there a specific thermal insulation requirement?
A4. The purpose is to make sure that the surface of the metal will not reflect sunlight at flying aircraft. There is no specific thermal insulation required.
Q5. What is the approximate schedule for work to be done?
A5. This is the vendor’s decision of how long it will take them to complete the requirement and should be included in the proposal.
Q6. What information should be included with proposal?
A6. Vendors should at a minimum list their proposed price, time frame that they expect the requirement to take, discount terms, and business information (e.g.
DUNS number and Cage Code).
File details come from the government source that posted it. Updated .