About this file

Attachments 03 - 07

View the file

Other files for this federal contract opportunity

Other files attached to Nellis/Creech Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
14RA200SolConformAmd11.pdf PDF
16RA200Amendment11.pdf PDF
16RA200Amendment10.pdf PDF
curvert_line.shp —
gas_line.shp —
Water_line.shp —
100-series_as-builts.jpg JPG image
100-series_as-builts.dwg DWG drawing
Atch_61_SOO_-_RKMF_15-0116_(002).pdf PDF
electrical_cable_line.shp.xml XML file
gas_line.shx —
16RA200MtgMinutesCombined_(003).pdf PDF
Waste_water_line.shp.xml XML file
manhole_structural_specification.pdf PDF
curvert_line.shx —
Storm_line.shp —
RKMF_15-00003_Manhole_Repair_Specs.doc.xlsx XLSX spreadsheet
gas_line.prj —
16RA200Amendment09.pdf PDF
Waste_water_line.prj —
Water_line.shx —
Storm_line.shp.xml XML file
curvert_line.prj —
electrical_cable_line.shp —
Utility_lines_Auto..1.dwg DWG drawing
Waste_water_line.shx —
200-series_as-builts.dwg DWG drawing
Water_line.shp.xml XML file
200-series_as-builts.jpg JPG image
Storm_line.prj —
electrical_cable_line.prj —
16RA200Amendment08.pdf PDF
questions_SABER.doc DOC document
14RA200SolConformAmd7.pdf PDF
Atch_57_Past_Peformance_Information_Sheet.doc DOC document
16RA200Amendment07.pdf PDF
16RA200Amendment05.pdf PDF
16RA200SABERSolicitation_03.pdf PDF
16RA200SABERSolicitation_02_S.pdf PDF
Atch_18_AFCatcodes_2016_v1.0.pdf PDF
16RA200SABERSolicitation_01.pdf PDF
Atch_32_1728F-806_UG__Main_VEA_standard.pdf PDF
Atch_01_SABER_Specs_4_April_2016.pdf PDF
Attch61.62.pdf PDF
Attch12-15.pdf PDF
Attch52-55.pdf PDF
Attch_19-26.pdf PDF
16RA200SABERSolicitation.pdf PDF
Attch56-60.pdf PDF
Atch_51_DD_Form_1354 _Aug_2013.pdf PDF
Show all 50

Nellis/Creech Simplified Acquisition of Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 03

Nellis and Creech AFB Energy Efficient Lighting Fixture Requirements 28 May 2015

1. Codes and Standards: All design and construction must be in compliance with the most recent versions of the following:

Unified Facilities Criteria (UFC) 3-530-01 Design: Interior, Exterior Lighting and

Controls.

Unified Facilities Guide Specification (UFGS) 26 51 00.00 40 for interior lighting UFGS 26 56 00 for exterior lighting UFGS 26 56 19.00 40 for roadway lighting UFGS 26 56 23.00 40 for area lighting UFGS 26 56 36 00 40 for flood lighting UFGS 26 56 20.00 10 for airfield and heliport lighting AFI 31-101 Integrated Defense for security applications Nellis/Creech Installation Development and Design (ID2) Handbook dated AUG 2011.

Any discrepancies between code or standards provisions and the contract documents shall immediately be brought to the Contracting Officer’s attention, and the more stringent requirements shall apply unless otherwise directed. Contractor shall comply with and implement all applicable design goals, technical constraints, considerations, and policies stated in the Nellis- Creech Installation Development and Design (ID2) Handbook (August 2011) unless an alternate approach is stated in project scope of work or approved by Contracting Officer. UFC 3-530-01 supersedes any applicable requirements stated in the ID2. Contractors shall be responsible for obtaining any copies of all items referenced in this paragraph. The most current versions of UFCs, UFGS and ETLs can be found at http://www.wbdg.org/ccb/ccb.php.

2. Per UFC 3-530-01 sec. 5-3.7 Light-Emitting Diode (LED), LED’s may only be considered for:

2.1 Exit signs, other lighted information signs and traffic signals.

2.2 Step lighting, nightlights, task lighting, cove lighting, wall washing, downlighting, canopies, high bays, parking garages, and red lighting systems for guard stations.

2.3 Street, parking, roadway, area and façade lighting.

2.4 For Visual Air Navigation Systems, such as airfield approach, runway and taxiway lighting systems, please refer to UFC 3-535-01 and AFI 32-1044. Visual Air Navigation Systems are not covered in this specification.

3. ALL lighting fixtures shall comply with below except “Interior Lighting Fixtures 20 feet or less above finished floor.”

3.1 Luminaires shall be solid-state LED Luminaires.

3.2 Fixtures shall have a color temperature in KELVIN of between 4000K and 4500K.

3.3 Ballasts and lamps shall have a minimum warranty of 5 years.

http://www.wbdg.org/ccb/ccb.php

3.4 Ballasts and lamps shall have a minimum rated life of 50,000 hours.

3.5 Fixtures shall be rated to operate at ambient temperatures between 0 degrees F and 120 degrees F or higher. This requirement does not apply to Interior Recessed, Downlight, and Wall Wash Fixtures.

3.6 Power Factor shall exceed 98%.

3.7 All exterior light fixtures shall have an Efficacy > 100 lumens/watt and upward Efficiency < 10%

3.8 T-5 fixtures are prohibited.

3.9 All interior facility lighting fixtures shall be controlled by motion detectors. Any exceptions shall be requested by Contractor for approval by the Contracting Officer. No exceptions will be made for restroom and conference room fixtures. However, a wall switch shall be installed to turn sensors/lights on and off as needed (i.e. lights off in a conference room in order to view wall screens). Sensors shall be placed in a location not affected by movement outside of open doorways.

4. Interior Lighting Fixtures located 20 feet or less above finished floor.

4.1 Luminaires shall be 32 watt T-8 fluorescent lamps.

4.2 LEDs shall not be used in linear fluorescent luminaires such as linear direct / indirect pendants and 2x4 or 2x2 troffers.

4.3 Luminaire Efficiency Ratio (LER) shall be > 77.

4.4 Fixtures shall have a color temperature in KELVIN of 4100K. Other color temperatures may be considered in housing applications, hospitality applications, and in maintenance facilities. See UFC 3-530-01 for additional information.

4.5 Ballasts shall be electronic.

4.6 Provide wire guards for all open fluorescent lamps.

5. Interior High Bay Fixtures located higher than 20 feet above finished floor

5.1 Luminaire Efficiency Ratio (LER) shall be > 50.

5.2 Daylighting controls shall be utilized for energy savings.

6. Exterior Street and Parking Lot Fixtures

6.1 All street and parking lot lighting shall include dusk till dawn photocells. Include one photocell per light circuit.

6.2 Automatic Bi-level dimming with occupancy sensors shall be used in parking lots to allow energy savings when parking lots are used infrequently.

6.3 Fixture lens shall be glass.

7. Exterior Wall Pack and Walkway Lighting Fixtures

7.1 All wall packs and walkway lighting fixtures shall include dusk till dawn photocells.

Include one photocell per light circuit.

7.2 Fixture lens shall be glass.

7.3 Light bollards shall be vandal resistant type and electrical service shall be 208v maximum with 120v to ground.

8. Exterior Area, Flood, Canopy, and Security Lighting Fixtures

8.1 Contractor shall obtain the written approval of the security lighting fixtures from base Security Forces and Anti-terrorism Force Protection (ATFP).

8.1.1 Fixtures shall be compatible with CCTV, and night vision goggles.

8.1.2 Fixtures shall meet illumination requirements for security and ATFP.

8.2 Automatic Bi-level dimming with occupancy sensors shall be used to allow energy savings when lights are used infrequently. Maintain illumination levels for adequate security when lights are dimmed.

9. Exterior Apron Airfield Lighting Fixtures

9.1 Contractor shall obtain written approval of the LED fixtures from base Security Forces and ATFP.

9.1.1 Fixtures shall be compatible with CCTV, and night vision goggles.

9.1.2 Fixtures shall meet illumination requirements for security and ATFP.

9.2 Fixture lens shall be glass. Plastic and Acrylic are prohibited.

9.3 Ballasts shall be located between 10 and 15 feet above ground level and shall be easily accessible for maintenance.

9.4 Automatic Bi-level dimming with occupancy sensors shall be explored to allow energy savings when lights are used infrequently. Maintain illumination levels for adequate security when lights are dimmed.

END OF SPECIFICATION

Attachment 04

Current as of 23 July 2013

BASE FIRE PROTECTION STANDARDS

Nellis-Creech AFB

Fire Emergency Services Flight

99 CES/CEF

FIRE PROTECTION FOR ALL FACILITIES SHALL COMPLY WITH THE FOLLOWING:

1. DESIGN:

A. All facilities shall be designed to comply with references UFC 3-600-01, UFC 4-021-0, UFC 4-010-0, UFGS 28-31-76 and current edition of all National Fire Protection Association (NFPA) codes and standards to include the requirements called for in this document. The Fire Protection Engineer of record (FPEOR) shall ensure that the design meets the requirements of UFC 3-600-01. The FPEOR shall review all shop drawings for approval and shall witness all operational tests for acceptance of the fire protection systems. FPEOR shall be identified at the beginning of the project. If required, the FPEOR may be contacted via conference call for design review meetings.

B. All projects shall include building code analysis, life safety code analysis and a water supply analysis in accordance with UFC 3-600-01.

C. Base-level projects that do not involve full A-E services, the above requirements for the FPEOR still applies. If detailed designed documents are not being provided, the FPEOR shall prepare at a minimum a building code, life safety code, and water supply analysis as applicable to the statement of work, specifications, and a narrative description (performance specification) of the required systems.

2. PLANS:

A. CODE ANALYSES:

Life Safety Code analysis and Building Code analysis shall be included as separate plans following the format shown above. The designer must ensure that below values are shown on each project design and the final as-built for each particular project.

BUILDING CODE ANALYSIS:

1) Occupancy classification

2) Required (or allowed) and designed

a. Building area

b. Building height

c. Construction type

d. Exterior exposure protection

e. Height/area increases (provide calculations)

f. Interior fire rated occupancy separation

g. Internal fire area separations

LIFE SAFETY CODE ANALYSIS:

1) Occupancy classification

2) Occupant load factor(s) (with calculations)

Current as of 23 July 2013

3) Required (or allowed) and designed

a. Common path of travel

b. Dead-end corridor

c. Egress capacity

d. Exit discharge

e. Flame spread/smoke development ratings for interior finishes

f. Horizontal exits

g. Number of exits

h. Remoteness of exits

i. Separation of exits and exit access

j. Separation of hazardous areas

k. Travel distance

4) Total calculated load (per floor and total for building)

5) Location of fire walls

6) Location of extinguishers:

a. The design must show that all fire extinguisher cabinets are sized to support a 20-lb ABC Dry chemical fire extinguisher. Provide a recessed or semi-recessed fire extinguisher cabinet.

b. The design must show that a 10-lb ABC Dry chemical fire extinguisher is being supplied and installed.

c. Fire extinguisher will be mounted on a hook inside cabinet IAW NFPA 10.

7) All exit door(s), including SCIF areas, shall not take more than one physical action to exit (open door); only one action is allowed IAW NFPA, LSC 101.

8) The type, size and dimensions of the large orifice on all fire hydrants shall be built in 5” Storz connection with cap, directed by the AHJ.

B. CIVIL PLANS:

1) The civil drawings shall show all fire water mains to include positive identification of the test hydrants (both pressure and flow hydrants). Plans must show water main from the test point to the building riser.

2) Show all fire hydrants and control valves. See UFC 3-600-01 for criteria.

3) Roads shall comply with UFC 3-600-01 and NFPA 1 for accessibility to building by emergency vehicles. Coordinate with the fire department.

C. ARCHITECTURAL PLANS:

1) The architectural plans and the Life Safety Code plans shall both show the fire walls and partitions and architectural plans shall identify the UL number or other standard such as FM for fire rated assemblies. Additionally, these plans shall show the locations of the fire extinguishers.

2) Door plan shall identify the fire rating of any fire doors. Doors shall match fire walls shown on drawing.

Current as of 23 July 2013

D. MECHANICAL PLANS:

1) Mechanical plans shall positively identify all fire and/or smoke dampers and provide a detail for installation. Any smoke damper shall include a smoke detector for activation of the damper.

Fire dampers shall be shown to comply with NFPA 90A and smoke dampers shall comply with

NFPA 101.

Note: Mechanical plans shall include smoke detectors on the control diagram. Smoke detectors shall not activate the building evacuation alarm system but shall report as an alarm to the fire department as a separate zone on the fire alarm panel.

2) Duct smoke detectors shall be 24V and resettable through the Fire Alarm Control Panel.

E. ELECTRICAL PLANS:

1) Plans must show the exit signs and emergency lights. Exit signs to be RED in color.

2) Switchgear shall show the power for the fire alarm system as a separate breaker.

3) Fire Alarm and MNS panels shall be in a climate controlled room.

4) Mark each breaker for each Fire alarm box, NAC panel etc.

F. FIRE ALARM / MNS AND FIRE SUPPRESSION PLANS:

1) Plans must show the hazard classification for each area.

2) Provide a chart showing the density, area of application and hose stream demand for each hazard classification. The data must comply with current UFC 3-600-01.

3) Provide a riser diagram for the sprinkler system. Make sure to include a test connection for the backflow preventer. Air Force uses “shotgun" risers.

4) The inspector's test connection shall be located at the most remote end of the system. Install a large splash block on the outside discharge head for inspector test if the area is not concrete.

5) Frequency for the fire alarm system at Creech AFB is 138.9750 MHZ. Monaco # -86 is assigned to Creech AFB.

6) Frequency for the fire alarm system at Nellis AFB is 138.250 MHZ. Monaco # -01 is assigned to

Nellis AFB.

7) Plans shall show all fire alarm and mass notification devices. Visual devices shall show the candela rating of each device.

8) Riser diagram shall show all power connections, initiating devices, alarm devices and any interconnections of shutdowns such as AHUs or door releases.

9) Provide a matrix showing what action each device will initiate.

10) Locate the fire alarm panel as dictated by the fire department. Panel shall be accessible to the fire department when the building is not occupied.

Current as of 23 July 2013

11) Provide transmitter zone schedule. A minimum of 16 Zones will be supplied with the capability to expand to 32 or 64 depending on the size of the facility being built.

12) The fire alarm reporting system is a Monaco D-21 radio transceiver system using an addressable panel. The transmitter Radio (BTX) shall be Monaco.

13) The building fire alarm system shall be an addressable system and shall be a combination fire alarm/mass notification system. System shall use combination speaker/strobes and the strobes as specified in UFC 4-021-01.

14) Manual fire pull stations shall be key reset only (no other type reset will be allowed). Manual fire pull stations shall NOT have glass rods. Fire Pull stations to be single action.

15) The complete Fire Alarm System shall be the product of only one manufacturer.

16) No 'T' tapping will be permitted.

17) All fire panels, associated panels, fire pull stations are to be keyed the same; #415A key is recommended.

18) Antenna shall have direct line of sight and 3 ft. above edge of roof line.

19) Smoke detector over fire alarm panel shall be no higher than 2 ft.

20) Supply Certifications of all Installers, Testers, Certifiers, Fire Protection Engineers and other persons involved in the installation of Fire Alarm, Fire Suppression systems or anything dealing Fire Protection requirements.

21) All NAC panels shall be individually zoned with trouble and battery fault conditions with a visual monitor module appropriate for the system.

22) All wires shall be clearly identified for bell circuit and/or speaker/audio for MNS.

23) The AHJ shall be notified after conduit is installed for visual inspection. No panels will be installed without coordination or location(s).

24) All fire sprinkler systems will have a PIV shut off valve unless otherwise approved by Nellis-

Creech Fire Emergency Services Flight.

25) Provide a final inspection and acceptance checklist with the Material Register for each project.

The FPEOR must attend the final inspection for the Fire Protection System and sign/certify all documents confirming to the Government that the systems were installed to meet the required standards. During final acceptance testing a check list shall be provided by the contractor IAW NFPA and/or UFC standards prior to the final inspection.

a. Each checklist shall provide procedures to test all Fire Protection systems that were installed.

b. This checklist shall comply with the current edition of the NFPA 72 and shall incorporate the procedures to test all aspects of the Fire Protection System; Fire Alarms, Fire Suppression, Mass Notification and other systems as applicable.

c. If the contractor installs the Fire Protection system different from that shown in the design, a revised final inspection and acceptance checklist shall be submitted for review, two weeks prior to the final acceptance for the system. All checklists shall be approved by AHJ (ACC FPE and the local AHJ).

26) Connections to Fire Alarm Control Panel(s) (FACP) to BTX-M or BTX shall be by a serial port or Data line connection. No relay/communication/data links to be used between the FA control panel and transmitter. Must be IAW manufacturer’s specifications for Nellis-Creech AFB transmission system (Radio communication D21 monitoring system).

27) Connect any and all wiring in fire alarm systems with LEVER NUTS.

28) The last device installed must have an engraved sign stating the value and location of the end of line resistor.

29) All “J” box covers for fire alarm system will be painted "RED" IAW NFPA and all coupling painted RED.

30) On all false ceiling grids the cross “T”s will be marked with a RED dot indicating the location of fire 'J' boxes.

31) Post a laminated schematic drawing next to the fire alarm systems and MNS panels and clearly mark on the drawing the location of all fire 'J' boxes.

32) All fire alarm and MNS notification system panels and accessories panel will reset on their own after a power bump or electrical outage.

33) All tamper switches arms on OS&Y valve stems will be in the grove of the valve stem for proper alignment.

34) There shall not be any relays between Fire Alarm panel(s) and or BTX / Radio, hardwired in only.

35) Gutter systems will be installed above and in between all fire alarm panels.

36) All devices shall be addressable and duct detectors will be 24 volt, resettable through the fire alarm panel.

37) Fire alarm panel shall have Point to Point capability.

38) Fire suppression systems will have an external electric bell to indicate water flow by the fire riser room.

G. TESTING:

1) Specifications must clearly indicate the testing of the fire protection systems and the A/E shall develop a commissioning plan that indicates how each system will be tested and who will witness the testing for acceptance, IAW NFPA 3, current edition. The FPEOR shall be the lead for the commissioning plan and the plan shall be approved by contracting officer prior to testing.

The FPEOR shall write a commissioning letter stating that the systems are in full compliance with the plans and specifications.

2) All batteries for the Fire Protection System shall provide 72 hours of backup power unless otherwise approved by local AHJ for lower backup power.

3) Mandatory system tests: All systems installed must be tested on the battery backup power supply for the rated time of backup power provided IAW NFPA 72. All systems must still be functional after testing.

4) A THIRD PARTY shall be used to perform all testing of any Fire Protection System that is installed. The FPEOR can be used as the Third party if no conflict of interest exists.

3. SPECIFICATIONS:

A. CIVIL

1) Make sure all fire protection devices such as fire hydrants, control valves, etc. over 5 feet from the building are included in the civil specification.

B. FIRE SUPPRESSION / FOAM SYSTEMS

1) All requirements in UFC 3-600-01, UFGS and applicable Fire and Life Safety codes shall be met.

2) Designer must include the loss from the test connection to the base of the riser.

3) All sprinkler piping will be schedule 40 for dry pipe and pre-action. NO dyno flow piping.

4) Where a fire pump is required and the base power is determined to be reliable (see UFC 3- 600-01 paragraph 3-6.4), use electric motor drivers which are variable speed.

5) If power is not reliable, use variable speed diesel engine drivers. DO NOT use electric motor drivers with emergency power backup unless a generator is required for the facility.

6) Base personnel (shop and fire department) shall be trained on the operation, testing and maintenance of the control panel and devices, with a minimum of 4 each 2 hours training sessions. Four sessions will be required to ensure all personnel can attend training. This training will be separate from the testing of the systems.

7) The contractor shall train and certify Base Fire Alarm Technicians on newly installed systems that are not already on the base. All software or materials needed by Base Technicians for maintenance and programming said systems will be supplied to the Government.

8) Foam vertical bladder tanks are not permitted in new installations. Vertical bladder tanks will only be allowed in existing facilities with approval by the ACC FPE. Tanks will be located such that the bladder can be replaced without moving the tank.

9) Atmospheric tanks with concentrate pumps are preferred on all foam solution systems as the bladder tanks are often ruptured due to improper filling or over pressurization.

10) Test headers shall be provided for a permanent method of flow testing proportioner(s).

11) Deluge valves listed and approved for use with foam concentrate will be used for automatic foam concentrate control. When abort (dead-man) switches are provided, flow control valves shall be used. Fire alarm manual pull stations shall be at least 5 feet from the foam manual discharge station. Foam release pull station box will be yellow.

12) Isolation control valves shall be full port ball type with operating handle that indicates the on/off position of the valve. Unit shall be socket weld or flanged type. Valve body and ball shall be of 316 stainless steel complying with ASTM A351.

13) Foam tanks will be provided with spill control, sized to contain the tank capacity.

14) Foam concentrate piping will be stainless steel. Piping will have either flanged joints and fittings, rolled groove fittings or welded joints and fittings. If welded joints and fittings are used, then flanged joints will be provided for equipment maintenance.

15) The foam discharge panel shall be located in an environmentally controlled space in accordance with NFPA 72 and per the manufacturer's recommendations.

C. Unified Facilities Guide Specifications – 28 31 76 (UFGS Aug 2011):

1) The recommended practices stated in the manufacturer’s literature or documentation shall be considered as mandatory requirements.

2) Paint junction boxes (conduit) and surface metal raceways RED in unfinished areas.

3) All personnel involved with installation of any fire protection systems shall supply training history for the employees involved with the contract.

4) The control units shall be located in a air conditioned space where the ambient temperature is maintained between 60 and 80 degrees.

5) Install control panel components in cabinets large enough to accommodate all components and also to allow ample gutter space for interconnection of panels as well as field wiring.

6) On complex facilities provide the annunciator at a location IAW NFPA 72.

7) Include a color code schedule for all fire related wiring.

8) Contact the Base Fire Prevention office to determine what action is appropriate for the salvaging of existing fire alarm equipment.

9) New system transmitter shall be turn on only before Pre-final.

10) Testing procedures to be submitted NLT 30 days before testing. Submitted and sign by Fire

Protection Engineer of Record.

11) Circuits operating at 24 volts DC shall not operate at less than 21.6 VDC.

NOTE 1: These Base Standards supersede all previous Nellis-Creech Air Force Base Fire Protection Standards.

NOTE 2: These Base Standards are not all inclusive and any disputed items in Nellis-Creech Air Force Base Fire Standards shall be decided by Authority Having Jurisdiction, the ACC Fire Protection Engineer.

Attachment 05

99 CES/CEI

ENVIRONMENTAL PERMITS/AUTHORITY TO PROCEED GUIDANCE

For General Information, call (702) 652-2834/7606

PERMIT/AUTHORITY TO

CONSTRUCT

RESPONSIBLE PARTY

TO OBTAIN PERMIT PERMITTING/COORDINATING AGENCY

Air Program Manager (702) 652-2882/4123 Clark County Dust Permit:

- Trench >/= 100 LF

- Disturbance >/= ¼ Acre

(10,890 SF)

- Structural demo >/= 1000 SF

Contractor

Nellis Air Quality Manager for in-house CE or RED HORSE proj

Clark County Department of Air Quality (DAQ) (http://www.clarkcountynv.gov/AirQuality/Compliance/Pag es/Compliance_DustPermitting.aspx (702) 455-5942)

Authority to Construct (ATC) required prior to commencing construction:

- Boilers (low NOx required by regulation in Clark County for certain sizes)

- Cooling Towers (open drift)

- Baghouse/Cyclones

- Fuel Dispensing Equipment

- Fuel Storage Tanks

- Asphalt Batch Plant

- Concrete Batch Plant

- Rock Crusher/ Mineral

Processing

- Paint Booths

- Media Blasters

- Water Heaters (low NOx required by regulation in Clark County for certain sizes; no requirement for electric)

- Generators

- Hush House

- Degreasers

- Fuel Cell Maintenance

Nellis Air Quality Pgm

Mgr (nellisairquality@nellis.a f.mil (702) 652- 2882/4123)

Clark County DAQ Or

Nevada Division of Environmental Protection (NDEP)

Drinking Water - Water Program Manager (702) 652-7639 Engineering Plan Reviews Projects impacting drinking water must be submitted to the BSDW for review prior to commencing the water project.

Contractor Nevada Division of Environmental Protection (NDEP) Bureau of Safe Drinking Water

Waste Water - Water Program Manager (702) 652-7639 Temporary Discharge to Waters Discharges from remediation and disinfection activities, well pump testing, aquifer drawdown testing, dewatering, underground injection of fluids, and other discharges of a temporary nature.

Contractor Nevada Division of Environmental Protection (NDEP)

Construction Storm Water Discharge Permit Requires SWPPP– If an acre or more of land is disturbed

Contractor

Submit a copy of SWPPP to base Water Program Manager for approval and provide a copy of NoI. Submit NoT at completion. Provide to base contracting for Civil Engineering to incorporate in project folder

Asbestos/Lead/Toxics Program Manager (702) 652-7606 Asbestos:

- ACM Survey/Abatement

- Notification/Demolition Permit

- ACM Waste Manifest

Contractor

(Manifest signed by Authorized Pgm Mgr, DAQ:

http://www.clarkcountynv.gov/AirQuality/Compliance/Page s/Compliance_AsbestosForms.aspx (702) 455-5942 Provide to base contracting for Civil Engineering to http://www.clarkcountynv.gov/AirQuality/Compliance/Pages/Compliance_DustPermitting.aspx http://www.clarkcountynv.gov/AirQuality/Compliance/Pages/Compliance_DustPermitting.aspx mailto:nellisairquality@nellis.af.mil mailto:nellisairquality@nellis.af.mil http://www.leg.state.nv.us/nac/NAC-445A.html#NAC445ASec66585 http://www.clarkcountynv.gov/AirQuality/Compliance/Pages/Compliance_AsbestosForms.aspx http://www.clarkcountynv.gov/AirQuality/Compliance/Pages/Compliance_AsbestosForms.aspx

(702) 652-6410) incorporate in project folder

Lead Based Paint:

- LBP Survey/Abatement

- LBP Waste Manifest

Contractor

(Manifest signed by Authorized Pgm Mgr,

(702) 652-6410)

DAQEM:

Bioenvironmental Engineer (702) 653-3348 for XRF/XRD analyzer permit prior to use on Nellis/Creech Provide to base contracting for Civil Engineering to incorporate in project folder

Toxics:

- PCB disposal

- Refrigerants and other Ozone

Depleting Chemicals

- Hazardous Materials

- Radon (if encountered)

- Hazardous Waste

Contractor

Nellis Hazardous Waste Pgm Mgr: (702) 652-3159 DAQEM and obtain HAZMART ((702) 652-4352) approval

Nellis Hazardous Material Pgm Mgr: (702) 652-9722 Bioenvironmental (702) 653-3344 Nellis Haz Waste Pgm Mgr:(702) 652-3159/679-0476

Solid Waste:

- Landfills

- Recycled Materials

Contractor Nellis Solid Waste Program Manager: (702) 652-9722 Qualified Recycling Program Manager: (702) 652-6097

Fire Protection Services:

- Sprinkler Systems

- Automated Fire Fighting Foam

(AFFF) Systems

- Burn Permit/Welding Permit

Contractor Fire Dept-- Nellis: (702) 652-9626 or Creech: (702) 404-2228/0236

Restoration Sites Contractor Restoration Pgm Mgr: (702) 652-9365

Cultural Resources:

- Historical Sites/Facilities

- Archaeological Sites

Contractor Nellis Archaeologist: (702) 652-5813

Natural Resources:

- Presence of Protected Plant or Animal Species

- Presence or Creation of a

Wetland

- Plants and Landscaping

Contractor Nellis Natural Resource Program Manager:

(702) 652-4354

AICUZ Contractor Base Comprehensive Planner: (702) 652-3198

Electromagnetic Fields Contractor Nellis Frequency Management: (702) 652-3417

EMS Awareness Training (https://acc.esohtn.com/start) Contractor

Nellis EMS Mgr: (702) 652-6115; or create a profile, complete the training, and submit an electronic copy to 99 CES/CEIEA and Contracting Office.

Above-Ground Storage Tank (AST), Underground Storage Tank (UST) and Generator

- UST

Installation/Upgrade/Repair Permit Application

- AST installation, upgrade or repair

- Generator installation, upgrade or repair

Contractor

USTs— Southern Nevada Health District: (702) 759-0603

ASTs— Fire Dept-- Nellis: (702) 652-9626 or Creech: (702) 404-2228/0236

Work Clearance Requests (AF Form 103) Contractor

Nellis CE Customer Service: (702) 652-2301 Creech CE Customer Service: (702) 404-0215 NOTE: if dust permit, ATC/OP, SWPPP, or NPDES permit required, must provide them with Form 103 submittal!

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

JUN 27 2002

FROM: AFCESA/CES

139 Barnes Drive, Suite 1 Tyndall AFB, FL 32403-5319

SUBJECT: Engineering Technical Letter (ETL) 02-12: Communications and

Information System Criteria for Air Force Facilities

1. Purpose. This ETL integrates communications and real property planning, programming, and construction. It supersedes draft ETL 01-17. It is a joint effort of Headquarters Air Force Civil Engineer Support Agency (HQ AFCESA) and Headquarters Air Force Communications Agency (HQ AFCA) with HQ AFCA coordination. It supports Air Force initiatives such as Gigabit Ethernet, network consolidation, and the Air Force Portal by establishing the following requirements:

• New facilities and facility alterations acquired with military construction (MILCON) appropriations will have common-user communications and information system infrastructure, including connectivity.

• Communications and information infrastructure and connectivity will be integrated into facility planning, programming, design, and construction to ensure the system is complete and ready for customer occupancy.

• Systems will comply with the requirements of Air Force Instruction (AFI) 33-133, Joint Technical Architecture (Joint Technical Architecture – Air Force [JTA-AF]) and basic standards to ensure compatibility, flexibility, and long-term customer support.

1.1. Intent:

• Minimize user occupancy delays and provide immediate network services on the facility occupancy date.

• Prevent facility defacement that would occur if communications and information infrastructure were not integrated into the facility design and acquisition process.

• Provide flexibility and standardization, thereby reducing the need and cost of future modifications that would result from changes in facility occupancy or user reorganization.

• Alleviate funding disconnects that result from fragmenting appropriations sources for MILCON and communications equipment infrastructure funding.

1.1.1. Scope. In each MILCON appropriations-funded project, military family housing (MFH) MILCON-funded project, or MILCON level Base Realignment And Closure (BRAC) project, include all common-user telephone and local area networks (LAN) (both Non-secure Internet Protocol Router Network [NIPRNET] and Secure Internet Protocol Router Network [SIPRNET]) infrastructure requirements to accommodate

1239914680C Typewritten Text Attachment 06 connecting operational and administrative end-user equipment. This includes, but is not limited to, the following:

• Customer jacks (telephone, fax, LAN, pay phone, community access [cable] television [CATV])

• All wiring, cabling, fiber optic cables (FOC), conduits, ducts, manholes, and pathways from the customer’s jacks to the point where the new facility will receive network services (dial tone and Internet protocol access)

• Connectivity for facility energy monitoring and control systems (EMCS) and fire alarm systems

• Entry control, intrusion detection, antiterrorism/force protection, and alarm system wiring infrastructure and components such as card readers and magnetic locks (monitors, cameras, and scanners are excluded)

• Termination devices (cross-connects, patch panels, distribution frames, network protectors)

• Communications equipment rooms (CER), closets, and other pathways

• Provisions only (e.g., floor space, electrical/mechanical utilities, ducts, and other real property improvements and fixtures) for special-purpose equipment, such as secure switches, radio transmitters, and audio-visual equipment

• Access floor systems

• Communications and information infrastructure requirements other than equipment when validated in advance and supported by the major command (MAJCOM) for inclusion into the military construction program (MCP) project’s programming documentation

• Permanently installed standby power (real property installed equipment [RPIE]) generators when justified

• Associated MILCON planning and design

1.1.2. Excluded. The following items will not be funded with MILCON appropriations.

They will continue to be funded from appropriate 3400 (Operation & Maintenance, Air Force) or 3080 (Air Force Procurement [Equipment]) funds, as required by AFI 65-601, Budget Guidance and Procedures, Volume 1.

• End instruments (telephones, secure telephone units [STU], secure terminal equipment [STE], computers, printers, video projectors, scanners, fax machines, copiers) and installation

• Terminations of building wiring infrastructure at equipment or onto existing base networks

• Special-purpose equipment (e.g., secure switches, radio transmitters, and audio-visual equipment) and installation

• Prewired work stations or furniture systems and installation

• Switching equipment (telephone switches, additional telephone central office line cards, and LAN switches) and installation

• Optical carrier equipment and installation

• CATV amplifiers and splitters which will be government-owned

• Network servers, routers, and hubs and installation

• Encryption equipment for classified systems and installation

• Power conditioning equipment such as uninterruptible power supplies (UPS) and installation

• Associated system engineering for items identified in this paragraph

1.2. Communications and information wiring infrastructure bought with construction appropriations in MILCON projects as part of the facility design and construction process will not be classified as real property or RPIE for accountability, ownership responsibility, operations and maintenance (O&M), upgrade, or replacement financing purposes.

1.3. Since communications and information infrastructure will be acquired with MILCON appropriations that are line-item-appropriated by Congress, no other appropriation will be used to augment their initial acquisition and installation. Furthermore, they are subject to the prohibition on alterations within one year from the date of beneficial occupancy in accordance with paragraph 3.4.2 of AFI 32-1032, Planning and Programming Appropriated Funded Maintenance, Repair, and Construction Projects.

2. Summary of Revisions. This ETL supersedes ETL 87-9, Prewiring. It updates requirements and standards consistent with current technology, incorporates decisions significantly expanding the scope of the superseded ETL, incorporates changes in funding and management policies, and reflects present organizational alignments.

Note: This ETL substantially revises ETL 87-9 and should be completely reviewed.

3. Application. Requirements of this ETL are mandatory for all MAJCOMS and their installations.

3.1. MCP. Compliance with this ETL is mandatory for all new construction, renovation, modernization, or rehabilitation work financed through Military Construction Appropriation Acts beginning in fiscal year (FY) 2004 on Air Force installations both inside and outside the United States of America. Technical requirements also apply for any “official service” authorized and provided in non-appropriated fund (NAF) facilities.

3.2. O&M-Funded Projects. The technical requirements of this ETL apply to O&M-funded facility projects; however, only those elements of a project that are real property subject to construction statutory funding limits (see AFI 32-1032) will be financed with funds appropriated for minor construction, repair, minor renovation, or maintenance.

Elements of a project that are not real property, such as communications wiring, and termination devices, will be funded as an expense (Element of Expense Code [EEIC] 592, 6XX, as appropriate) in accordance with AFI 65-601, Budget Guidance and Procedures, Volume 1.

3.2.1. The MAJCOMs will program communications infrastructure requirements including real property elements of work, such as walls, conduit, trenching, backfilling, and manholes, associated with non-MILCON sustainment, restoration, and modernization construction projects in the appropriate MAJCOM Engineering and Installation (E&I) account or the Combat Information Transport System (CITS) account (see AFI 65-601V1, paragraph 8.21).

3.2.2. The implementing command will program all real property elements of work, such as walls, conduit, trenching, backfilling, manholes (so-called “allied support construction”) for non-MILCON projects supporting major communications and information infrastructure programs in the major program’s Program Element (PE) in accordance with AFI 65-601V1, paragraph 8.21 and Figure 7.1, item 6b. This includes contracted architectural and engineering services for these projects in accordance with AFI 65-601V1, paragraph 7.6.10.2.

3.3. Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) and other mission equipment, cabling, antennas, and other appurtenances that are part of a mission system, such as satellite communications earth stations, (usually centrally managed by an implementing command system program office) will continue to be managed and funded as acquisition programs in accordance with DOD 5000-2-R, Mandatory Procedures for Major Defense Acquisition Programs (MDAPS) and Major Automated Information System (MAIS) Acquisition Programs. The system program office will coordinate supporting construction requirements with the MAJCOM sponsoring the MILCON project so those construction requirements are included. Where supporting construction is non-MILCON, the system program office will coordinate requirements with the host command and fund them in accordance with paragraph 3.2.2.

3.4. Upgrades. Do not use this ETL to justify upgrading existing facilities. The decision to upgrade facility communications and information systems will be based on mission need or economics and approved by the wing commander or higher authority, in accordance with MAJCOM policy.

3.5. Authority: AFI 32-1021, Planning and Programming of Facility Construction Projects, and AFI 32-1023, Design and Construction Standards and Execution of Facility Construction Projects.

3.6. Effective Date: Immediately.

3.7. Ultimate Recipients:

• MAJCOM and base communications systems officers (BCSO)

• MAJCOM and base systems telecommunications engineering managers

(STEM) at 38 Engineering Installation Group (EIG), Tinker Air Force Base, Oklahoma

• MAJCOM and base civil engineers (BCE)

• Design and construction agents

3.8. Coordination:

• The Air Force Civil Engineer (HQ USAF/ILE)

• Director of C4ISR Infrastructure (HQ USAF/XIC)

• MAJCOM Civil Engineers (CE) and MAJCOM Directors of Communication and

Information (SC)

• 38 EIG

3.9. Waivers. Coordinate requests for waiver of technical requirements on a case-by-case basis through the BCSO, BCE, STEM, and MAJCOM/SC before submitting to the MAJCOM/CE. Notify requestor and all coordinating parties of approval or disapproval.

Commands will not issue blanket waivers unless required to meet specific host country technical requirements. Requirements affecting financing, budget, or the ability to meet the intent of delivering a complete and usable communications and information system upon completion of facility construction will not be waived.

4. Referenced Publications. The latest editions of the following publications apply:

4.1. Public Law (PL):

• PL 106-52, Military Construction Appropriations Act 2000, 17 August 1999

4.2. Department of Defense (DOD):

• DOD 5000-2-R, Mandatory Procedures for Major Defense Acquisition Programs (MDAPS) and Major Automated Information System (MAIS) Acquisition Programs

• DOD 7000.14-R, DOD Financial Management Regulation

4.3. Air Force:

• AFI 21-404, Developing and Maintaining Communications and Information Systems Installation Records

• AFI 32-1021, Planning and Programming of Facility Construction Projects

• AFI 32-1023, Design and Construction Standards and Execution of Facility

Construction Projects

• AFI 32-1032, Planning and Programming Appropriated Funded Maintenance, Repair, and Construction Projects

• AFI 33-104, Base Level Planning and Implementation

• AFI 33-111, Telephone Systems Management

• AFI 33-115, Network Management, Volume 1

• AFI 33-133, Joint Technical Architecture - Air Force

• AFI 65-601, Budget Guidance and Procedures, Volume 1

• The USAF Project Manager’s Guide for Design and Construction (available at http://www.afcee.brooks.af.mil/dc/products/pmguide/pmguide.asp)

• Air Force Housing Design Guides (a list is available at http://www.afcee.brooks.af.mil/dc/dcd/arch/designdb/dsgn_guidelist.xls)

• Air Force Visiting Quarters Design Guide (available at https://www-r.afsv.af.mil/ld/documents/vqdesgd18aug2.doc)

• JTA-AF (available at https://www.afca.scott.af.mil/jta-af):

− JTA-AF, Building Wiring Architecture http://www.afcee.brooks.af.mil/dc/products/pmguide/pmguide.asp http://www.afcee.brooks.af.mil/dc/dcd/arch/designdb/dsgn_guidelist.xls https://www-r.afsv.af.mil/ld/documents/vqdesgd18aug2.doc https://www.afca.scott.af.mil/jta-af

− JTA-AF, Voice Switching Systems Architecture − JTA-AF, Information Technology Infrastructure Architecture − JTA-AF, Local Area Network Architecture

4.4. American National Standards Institute/Telecommunications Industry Association/Electronics Industries Alliance (ANSI/TIA/EIA):

• TIA/EIA-568-B, Commercial Building Telecommunications Cabling Standard − TIA/EIA-568-B.1, Part 1: General Requirements − TIA/EIA-568-B.2, Part 2: Balanced Twisted-Pair Cabling Components − TIA/EIA-568-B.3, Part 3: Optical Fiber Cabling Components Standard

• TIA/EIA-569-A, Commercial Building Standards for Telecommunications Pathways and Spaces

• TIA/EIA-570-A, Residential Telecommunications Cabling Standard

• TIA/EIA-606, Administration Standard for the Telecommunications

Infrastructure of Commercial Buildings

• TIA/EIA-607, Commercial Building Grounding and Bonding Requirements for

Telecommunications

• TIA/EIA-758, Customer-Owned Outside Plant Telecommunications Cabling

Standard

4.5. National Fire Protection Association (NFPA):

• NFPA 70, National Electrical Code

5. Additional References:

5.1. Air Force:

• AFI 32-1022, Planning and Programming Nonappropriated Fund Facility Construction Projects

• AFI 32-1065, Grounding Systems

• AFI 32-1084, Facility Requirements

• AFI 32-6002, Family Housing Planning, Programming, Design, and

Construction

• AFI 32-6003, General Officer Quarters

• AFI 33-103, Requirements Development and Processing

• AFI 34-105, Programming for Nonappropriated Fund Facility Requirements

• AFI 64-101, Cable Television Systems on Air Force Bases

5.2. NFPA:

• NFPA 101, Life Safety Code

• NFPA 780, Standard for the Installation of Lightning Protection Systems

5.3. ANSI/TIA/EIA:

• TIA/EIA 526-7 (OFSTP-7), Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant

• TIA/EIA 526-14 (OFSTP-14), Optical Power Loss Measurements of Installed Multi-mode Fiber Cable Plant

5.4. DOD:

• DOD Joint Technical Architecture (JTA) (available to .mil users at http://www-jta.itsi.disa.mil/)

6. Acronyms.

AAFES - Army & Air Force Exchange Service AFEMS - Air Force Equipment Management System AFI - Air Force Instruction AFMC - Air Force Material Command ANSI - American National Standards Institute ATM - asynchronous transfer mode AWG - American Wire Gauge BCE - base civil engineer BCSO - base communications systems officer BET - building entrance terminal BICSI - Building Industry Consulting Services International BRAC - Base Realignment And Closure C4ISR - Command, Control, Communications, Intelligence, Surveillance, and Reconnaissance CAN - campus area network CAT - category CATV - community access (cable) television CCTV - closed circuit television CER - communications equipment room CITS - Combat Information Transport System CSIR - Communications and Information System Installation Records E&I - Engineering and Installation EEIC - Element of Expense Investment Code EIA - Electronic Industries Alliance EIG - Engineering Installation Group EMCS - energy monitoring and control system ETL - Engineering Technical Letter FOC - fiber optic cable FY - fiscal year GOQ - general officer quarters GSA - General Services Administration HQ AFCESA - Headquarters Air Force Civil Engineer Support Agency HQ AFCA - Headquarters Air Force Communications Agency HQ AFSVA/SVOHL - Headquarters Air Force Services Agency, Lodging Department HQ USAF/ILE - The Air Force Civil Engineer HQ USAF/XIC - Director of C4ISR Infrastructure (formerly HQ USAF/SC) ICEA - Insulated Cable Engineers Association http://www-jta.itsi.disa.mil/

IPMS - Information Processing Management System IPT - Integrated Process Team ISDN - Integrated Services Digital Network ITN - information transfer node JTA-AF - Joint Technical Architecture - Air Force LAN - local area network MAJCOM - major command MCP - military construction program MFH - military family housing MILCON - military construction MPOP - minimum point of presence NAF - non-appropriated funds NAVFACENGCOM - Naval Facilities Engineering Command NCC - network control center NEC - National Electrical Code NFPA - National Fire Protection Association NIPRNET - Non-secure Internet Protocol Router Network O&M - operations and maintenance PA - programmed amount PABX - private automatic branch exchange PE - Program Element RD - Requirements Document RJ - registered jack RPIE - real property installed equipment RST - remote switching terminal RTA - ready to advertise RX - receive SIPRNET - Secure Internet Protocol Router Network SLC - single line (instrument) concept STE - secure terminal equipment STEM - system telecommunications engineering manager STU - secure telephone unit TC - telecommunications closet TGB - telecommunications grounding busbar TIA - Telecommunications Industry Association TMGB - telecommunications main ground busbar TX - transmit UL - Underwriters Laboratories UPS - uninterruptible power supply USACE - U.S. Army Corps of Engineers USOC - Universal Service Ordering Code UTP - unshielded twisted pair VAC - volt alternating current

7. Background.

7.1. Until the mid-1980s, the Air Force programmed, designed, and built new facilities through the MILCON process but added communications and information systems after construction completion. Installation of communications and information infrastructure after construction completion led to defacement of facilities and resulted in loss of flexibility since systems were not integrated into facility designs. Lack of synchronization between the facility and communication infrastructure delivery processes resulted in financial disconnects commonly resolved at the expense of other programs. Expensive occupancy delays were the norm.

7.2. Following the divestiture of the telecommunications industry in 1984, the Air Force adopted a policy called “prewiring.” The policy required the basic backbone infrastructure (outlets, wiring, CERs, telecommunications closets [TC]) to be integrated into the MILCON facility delivery process and financed with Appropriation 3300, Military Construction, Air Force. It did not include end instruments, telephone and network equipment, nor the connectivity needed to provide a dial tone and network access at the subscriber’s outlet at the time of facility beneficial occupancy. These items continued to be funded from Appropriation 3400, Operation & Maintenance, Air Force, or Appropriation 3080, Air Force Procurement (Equipment). The policy eliminated the potential for defacement of newly completed facilities during installation of communications infrastructure. It also provided enhanced flexibility through facility standardization. It did not, however, eliminate the potential for funding disconnects caused by fragmented funding sources nor resultant expensive occupancy delays.

7.3. In FY 2000, the President’s budget requested $560 million for Air Force conventional MCP projects. Congress added to the Military Construction Appropriation Act $254 million worth of projects that were not requested in the President’s budget;

however, they did not increase the 3400 and 3080 appropriations by the amount necessary to buy communications equipment and connectivity for the additional buildings. Consequently, the Air Force faced a large financial disconnect in making the additional facilities usable. In November 1999, HQ USAF/ILE and HQ USAF/SC co-sponsored an Integrated Process Team (IPT) to study the facility delivery process and make recommendations that would ensure new facilities were “communications-ready” at the time of occupancy. During its investigations, the IPT also found that communication equipment and connectivity support funding had not been requested for a large percentage of the facility projects that the Air Force had requested in the President’s budget, thereby exacerbating the disconnect. Furthermore, the IPT found the timing of communication requirements identification was not synchronized with the facility delivery process. Therefore, the IPT recommended that all common-user communications and information system infrastructure costs be internalized to the MILCON appropriations. In May 2000, HQ USAF/ILE and HQ USAF/SC agreed to implement the recommendation; however, the Office of the Undersecretary of Defense (Comptroller) would not make the requested changes to Department of Defense (DOD) 7000.14-R, DOD Financial Management Regulation, which would enable the Air Force to buy communications and information equipment with funds appropriated for MILCON.

HQ USAF/ILE therefore decided in January 2002 not to further pursue changing DOD financial management policy; this ETL was published only with the other IPT-recommended process improvements aimed at mitigating funding disconnects along with the technical updates.

8. Specific Requirements.

8.1. All mandatory requirements of the JTA-AF (AFI 33-133) must be met. The JTA-AF is available to .mil Internet clients on the Web at https://www.afca.scott.af.mil/jta-af.

This ETL governs where conflicts exist with non-mandatory JTA-AF or with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .