AF_66 _Schedule_of_Material_Submittals.xls

XLS spreadsheet 108 KB Posted

Attached to
Nellis AFB Fencing IDIQ Federal contract opportunity
Solicitation number
FA4861-15-R-A200
Issued by
Department of the Air Force Air Combat Command

About this file

AF66 Template

View the file

Other files for this federal contract opportunity

Other files attached to Nellis AFB Fencing IDIQ, newest first.
File Type Posted
FA4861-15-R-A200-0002_S.pdf PDF
Fencing_RFP_Amendment.pdf PDF
AF_3065_Template.pdf PDF
2015_Fence_IDIQ_SOW.doc DOC document
2015_Fence_IDIQ_Section_04810.doc DOC document
2015_Fence_IDIQ_Section_03300.doc DOC document
15_Fencing_IDIQ_RFP.pdf PDF
Wage_Determination.doc DOC document
2015_Fence_IDIQ_ApendixE _Ref_ESE-SIT-0001 TYPE_A_Modified_Fence_PD .doc DOC document
2015_Fence_IDIQ_Section_02300.doc DOC document
Detail_FP04_Fence_IDIQ_22_Jun_08.zip ZIP file
Subcontractor_Consent.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLE:SOLICITATION / CONTRACT NO.:
(To be completed by Project Engineer or Contractor)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE T CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVEDDISAPPROVED
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

File details come from the government source that posted it. Updated .