Solicitation_Attachment_3_-_SOMS.pdf

PDF 202 KB Posted

Attached to
Construction to repair Liberator Ave and upgrade electrical circuits Federal contract opportunity
Solicitation number
FA4855-16-B-0022
Issued by
Department of the Air Force Special Operations Command

About this file

Section J Attachment 3 - Schedule of Material Submittals (SOMS)

View the file

Other files for this federal contract opportunity

Other files attached to Construction to repair Liberator Ave and upgrade electrical circuits, newest first.
File Type Posted
SF_1409_Abstract.pdf PDF
Solicitation_Extension_Amendment.pdf PDF
CAFB_LIBERATOR_ROAD_Q A.pdf PDF
Liberator_Ave_Solicitation_SF1442_amendment.pdf PDF
Solicitation_Attachment_5_-_WD_NM50.pdf PDF
Solicitation_Attachment_2_-_Drawings.pdf PDF
Solicitation_Attachment_4_-_Environmental_Guide.pdf PDF
Solicitation_Attachment_1_-_SOW.pdf PDF
Liberator_Ave_Solicitation_SF1442.pdf PDF
Solicitation_Attachment_6_-_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 19 PAGES

Liberator

01 30 00 SD-01 Preconstruction Submittals

1.3 GCompletion Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.6Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.7.2.3 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

License Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 19 PAGES

01 35 26 GRadiography Operation Planning

Work Sheet

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.2.1 GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

Receipts

03 15 00.00 10 SD-03 Product Data

Preformed Expansion Joint Filler

G

Sealant G

SD-04 Samples

2.3.2Lubricant for Preformed

Compression Seals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 19 PAGES

03 15 00.00 10 2.3.3Field-Molded Type

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

03 20 00.00 10 SD-01 Preconstruction Submittals

GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-04 Samples

Epoxy-Coated Bars

SD-07 Certificates

2.3Reinforcing Steel

1.3.1Qualified Welders

1.3.2Qualification of Steel Bar

Butt-Splicers

03 30 00 SD-01 Preconstruction Submittals

Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

GForm Removal Schedule

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 19 PAGES

03 30 00 SD-03 Product Data

2.4.7Joint Sealants

2.4.6Joint Filler

2.1Materials for Forms

Recycled Aggregate Materials

2.4.1Cementitious Materials

Vapor retarder

2.3.3Concrete Curing Materials

2.5Reinforcement

Liquid Chemical Floor Hardener

2.4.5Admixtures

2.5.2Mechanical Reinforcing Bar

Connectors

2.2.1Waterstops

SD-05 Design Data

2.3.1 GMix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.1Pozzolan

1.6.3.2Ground Granulated Blast-Furnace

Slag

2.4.3Aggregates

3.12.2.3 GCompressive Strength Tests

3.12.2.4Air Content

3.12.2.1Slump Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 19 PAGES

03 30 00 2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

1.9Welder Qualifications

Material Safety Data Sheets

1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

Liquid Chemical Floor Hardener

2.3.3Curing Compound

09 90 00 SD-02 Shop Drawings

3.12Piping identification

3.12stencil

SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets

Sealant; G

SD-04 Samples

1.10 GColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 19 PAGES

09 90 00 3.4.1Application instructions

3.8.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings:

10 14 53 SD-03 Product Data

Traffic Sign Posts Traffic Signs

Traffic Sign Anchor Traffic Sign

Hardware

FHWA Acceptance Letter

2.3Traffic Sign Retroreflective

Sheeting

SD-04 Samples

Flexible Posts

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1 GMaterial, Equipment, and Fixture

Lists

SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.2 GWire and Cable

3.2.1.7 GSplices and Connectors

2.1.3 GSwitches

Receptacles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 19 PAGES

26 05 00.00 40 2.1.4 GOutlets, Outlet Boxes, and Pull

Boxes

2.1.6 GCircuit Breakers

2.1.5 GPanelboards

2.1.7 GLamps and Lighting Fixtures

2.1.10 GDry-Type Distribution

Transformers

SD-06 Test Reports

3.3Continuity Test

3.3Phase-Rotation Tests

3.3Insulation Resistance Test

SD-07 Certificates

1.4Certification

SD-08 Manufacturer’s Instructions

Part 2 GManufacturer's Instructions

26 05 13.00 40 SD-03 Product Data

2.2.1 GSingle-Conductor Shielded

Cables

SD-06 Test Reports

GMedium-Voltage Tests

SD-07 Certificates

2.4 GCertificates

Lead Sheath

Flammability

3.1.3 GMinimum Bending Radius

GMedium-Voltage Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 19 PAGES

26 05 13.00 40 1.5 GCable Splicers

SD-08 Manufacturer’s Instructions

1.4 GMedium-Voltage Power Cables

26 09 23.00 40 SD-03 Product Data

2.1.1 GPhotoconductive Control Devices

3.1Installation Drawings

GLight-Sensitive Control Devices

Light Level Sensor

2.2.3 GLighting Contactor

2.2.4 GTime Switch

2.2.5 GPhotocell Switch

SD-06 Test Reports

3.2System Operation Tests

SD-10 Operation and Maintenance

Data

1.3Lighting Control System, Data

Package 5

26 12 19.00 40 SD-02 Shop Drawings

1.4.1 GPad-Mounted Transformer

Drawings

SD-03 Product Data

2.1.1 GPad-Mounted Transformers

SD-06 Test Reports

3.3.1 GAcceptance Checks And Tests

SD-07 Certificates

GTransformer Losses

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 19 PAGES

26 12 19.00 40 SD-09 Manufacturer’s Field

Reports

2.3.2Design Tests

2.3.3Routine and Other Tests

SD-10 Operation and Maintenance

Data

1.5.1 GTransformer(s)

SD-11 Closeout Submittals

2.3.1 GTransformer Test Schedule

1.6 GWarranty

26 13 01 SD-02 Shop Drawings

1.5.1 GSwitchgear Drawings

SD-03 Product Data

1.5.3 GFuse Time-Current Characteristic

Curves

2.1 GAir Insulated Pad-mounted

Switchgear

2.2 GInsulated High-Voltage

Connectors

2.3 GSurge Arresters

SD-06 Test Reports

3.4.1 GAcceptance Checks and Tests

SD-07 Certificates

1.5.2 GPaint Coating System

SD-09 Manufacturer’s Field

Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 19 PAGES

26 13 01 2.6.1 GSwitchgear design and production tests

SD-10 Operation and Maintenance

Data

1.6.1 GAir Insulated Pad-Mounted

Switchgear Operation and

Maintenance

26 18 23.00 40 SD-02 Shop Drawings

Part 2 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

Part 2Equipment and Performance

Data

2.1.3Mounting Brackets

SD-08 Manufacturer’s Instructions

1.3.1 GInstallation Instructions

SD-10 Operation and Maintenance

Data

1.3.2 GOperation and Maintenance

Manuals

26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings

2.1.1Outline Drawings

SD-03 Product Data

1.3 GPanelboards

2.1.1 GPanelboards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 19 PAGES

26 24 16.00 40 2.1.3Directory Card and Holder

2.1.4Filtered Panelboards

SD-06 Test Reports

3.2Continuity Tests

3.2Insulation Tests

SD-07 Certificates

1.4Statements

SD-08 Manufacturer’s Instructions

1.3Panelboards

2.1.1Panelboards

26 27 13.10 30 SD-03 Product Data

2.1 GPower Meters

2.1.3 GCurrent

2.1.2 GPotential Transformer

2.2.2 GCommunications Module

1.6.1 GProtocol Modules

1.6.2 GData Recorder

1.6.2 GModem

SD-06 Test Reports

3.3.1 GAcceptance Checks and Tests

SD-10 Operation and Maintenance

Data

2.1 GPower Meters

2.2.2 GCommunications Module

1.6.1 GProtocol Modules

1.6.2 GData Recorder

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 19 PAGES

26 27 13.10 30 1.6.2 GModem

SD-11 Closeout Submittals

3.3.2 GSystem Function Verification

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

SD-02 Shop Drawings

1.5.1.1 GLuminaire drawings

1.5.1.2 GPoles

SD-03 Product Data

2.2 GInduction Luminaires

2.2.2 GLuminaire Light Sources

GLuminaire Ballasts and

Generators

2.3.3 GLighting contactor

2.3.2 GTime switch

GLighting Control Relay Panel

2.3.1 GPhotocell

2.4.1 GSteel poles

Brackets

SD-05 Design Data

1.5.3 GDesign Data for luminaires

SD-06 Test Reports

3.2Operating test

SD-07 Certificates

GLuminaire Useful Life Certificate

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 19 PAGES

26 56 00 Concrete poles

Fiberglass poles

SD-10 Operation and Maintenance

Data

1.7.1Electronic Ballast Warranty

1.8Operational Service

31 00 00 SD-01 Preconstruction Submittals

3.3Shoring

Dewatering Work Plan

SD-03 Product Data

3.7 GUtilization of Excavated Materials

Rock Excavation

Opening of any Excavation or

Borrow Pit

3.12Shoulder Construction

SD-06 Test Reports

3.15Testing

SD-07 Certificates

3.15Testing

31 05 21 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

2.1.1.1Allowable Strength

1.4Manufacturer

SD-04 Samples

2.1Geogrid Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 19 PAGES

31 05 21 SD-06 Test Reports

2.1Geogrid Reinforcement

2.1.1Coefficient of Interaction

Interface Friction Testing

3.1.4Splices

Conformance Testing

SD-07 Certificates

2.1Certificates of Compliance

31 23 00.00 20 SD-06 Test Reports

1.6 GBorrow Site Testing

3.12.2.1Fill and backfill

3.12.2.2Select material

3.12.2.3Porous fill

3.12.2.4Density tests

32 01 13 SD-03 Product Data

Waybills and Delivery Tickets

1.2.1Equipment List

3.2.3Inspection Reports

SD-04 Samples

1.4.2Bituminous Materials

2.2 GFog Seal

SD-06 Test Reports

Tests

32 01 19 SD-03 Product Data

3.1.2.3 GManufacturer's

Recommendations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 19 PAGES

32 01 19 3.1Equipment

SD-04 Samples

1.4.1 GMaterials

SD-06 Test Reports

GCertified Copies of the Test

Reports

32 11 16 SD-03 Product Data

1.4Equipment

1.1.3Waybills and Delivery Tickets

SD-06 Test Reports

1.6Sampling and Testing

1.6.2.4Field Density Tests

32 11 23 SD-03 Product Data

2.1Plant, Equipment, and Tools

Waybills and Delivery Tickets

SD-06 Test Reports

1.4 GSampling and Testing

1.4.2.4 GField Density Tests

32 12 10 SD-03 Product Data

Waybills and Delivery Tickets

Local/Regional Materials

SD-06 Test Reports

3.7Sampling and Testing

32 12 16 SD-03 Product Data

2.4 GMix Design

3.10 GQuality Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 19 PAGES

32 12 16 3.11 GMaterial Acceptance

1.1.1 GPercent Payment

SD-04 Samples

2.3Asphalt Cement Binder

2.2Aggregates

SD-06 Test Reports

2.2 GAggregates

3.10.3.10QC Monitoring

SD-07 Certificates

2.3 GAsphalt Cement Binder

3.6Testing Laboratory

32 16 13 SD-03 Product Data

2.1Concrete

SD-06 Test Reports

3.8Field Quality Control

32 17 24.00 10 SD-03 Product Data

1.3 GEquipment

Composition Requirements

1.5.1Qualifications

SD-06 Test Reports

2.4Sampling and Testing

SD-07 Certificates

Volatile Organic Compound

(VOC)

32 92 19 SD-03 Product Data

2.4.1Wood cellulose fiber mulch

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 19 PAGES

32 92 19 Fertilizer

SD-06 Test Reports

2.2.2Topsoil composition tests

SD-07 Certificates

2.1seed

SD-08 Manufacturer’s Instructions

Erosion Control Materials

33 40 00 SD-03 Product Data

3.3Placing Pipe

SD-04 Samples

2.1Pipe for Culverts and Storm

Drains

SD-07 Certificates

2.1.10Resin Certification

2.1.11Resin Certification

3.8Pipeline Testing

2.7Hydrostatic Test on Watertight

Joints

3.7.5Determination of Density

2.3.7Frame and Cover for Gratings

33 71 02 SD-02 Shop Drawings

1.5.1 GPrecast underground structures

SD-03 Product Data

2.5 GMedium voltage cable

2.7 GMedium voltage cable joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 19 PAGES

33 71 02 2.6 GMedium voltage cable terminations

GPrecast concrete structures

Sealing Material

3.4.2Pulling-In Irons

2.13.2 GManhole frames and covers

2.13.3 GHandhole frames and covers

2.13.5 GComposite/fiberglass handholes

2.14 GCable supports

2.17 GProtective Devices and

Coordination

SD-06 Test Reports

2.18.2 GMedium voltage cable

qualification and production tests

3.17.1 GField Acceptance Checks and

Tests

2.18.1 GArc-proofing test

GCable Installation Plan and

Procedure

SD-07 Certificates

1.5.2 GCable splicer/terminator

1.5.3 GCable Installer Qualifications

GCertificate of Conformance

34 71 13.16 SD-03 Product Data

FHWA Acceptance Letter

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 19 PAGES

34 71 13.16 End Anchorage

Crash Cushion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR