Section J Attachment 3 - Schedule of Material Submittals (SOMS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_1409_Abstract.pdf | ||
| Solicitation_Extension_Amendment.pdf | ||
| CAFB_LIBERATOR_ROAD_Q A.pdf | ||
| Liberator_Ave_Solicitation_SF1442_amendment.pdf | ||
| Solicitation_Attachment_5_-_WD_NM50.pdf | ||
| Solicitation_Attachment_2_-_Drawings.pdf | ||
| Solicitation_Attachment_4_-_Environmental_Guide.pdf | ||
| Solicitation_Attachment_1_-_SOW.pdf | ||
| Liberator_Ave_Solicitation_SF1442.pdf | ||
| Solicitation_Attachment_6_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 19 PAGES
Liberator
01 30 00 SD-01 Preconstruction Submittals
1.3 GCompletion Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.6Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.3 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
License Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 19 PAGES
01 35 26 GRadiography Operation Planning
Work Sheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals
1.6Records
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.2.1 GDeconstruction Plan
1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
Receipts
03 15 00.00 10 SD-03 Product Data
Preformed Expansion Joint Filler
G
Sealant G
SD-04 Samples
2.3.2Lubricant for Preformed
Compression Seals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 19 PAGES
03 15 00.00 10 2.3.3Field-Molded Type
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
03 20 00.00 10 SD-01 Preconstruction Submittals
GButt-Splices
SD-02 Shop Drawings
3.1 GReinforcement
SD-04 Samples
Epoxy-Coated Bars
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
1.3.2Qualification of Steel Bar
Butt-Splicers
03 30 00 SD-01 Preconstruction Submittals
Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
GForm Removal Schedule
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 19 PAGES
03 30 00 SD-03 Product Data
2.4.7Joint Sealants
2.4.6Joint Filler
2.1Materials for Forms
Recycled Aggregate Materials
2.4.1Cementitious Materials
Vapor retarder
2.3.3Concrete Curing Materials
2.5Reinforcement
Liquid Chemical Floor Hardener
2.4.5Admixtures
2.5.2Mechanical Reinforcing Bar
Connectors
2.2.1Waterstops
SD-05 Design Data
2.3.1 GMix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.3.1Fly Ash
1.6.3.1Pozzolan
1.6.3.2Ground Granulated Blast-Furnace
Slag
2.4.3Aggregates
3.12.2.3 GCompressive Strength Tests
3.12.2.4Air Content
3.12.2.1Slump Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 19 PAGES
03 30 00 2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
1.9Welder Qualifications
Material Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
Liquid Chemical Floor Hardener
2.3.3Curing Compound
09 90 00 SD-02 Shop Drawings
3.12Piping identification
3.12stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets
Sealant; G
SD-04 Samples
1.10 GColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 19 PAGES
09 90 00 3.4.1Application instructions
3.8.2Mixing
1.7.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings:
10 14 53 SD-03 Product Data
Traffic Sign Posts Traffic Signs
Traffic Sign Anchor Traffic Sign
Hardware
FHWA Acceptance Letter
2.3Traffic Sign Retroreflective
Sheeting
SD-04 Samples
Flexible Posts
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1 GMaterial, Equipment, and Fixture
Lists
SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
3.2.1.7 GSplices and Connectors
2.1.3 GSwitches
Receptacles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 19 PAGES
26 05 00.00 40 2.1.4 GOutlets, Outlet Boxes, and Pull
Boxes
2.1.6 GCircuit Breakers
2.1.5 GPanelboards
2.1.7 GLamps and Lighting Fixtures
2.1.10 GDry-Type Distribution
Transformers
SD-06 Test Reports
3.3Continuity Test
3.3Phase-Rotation Tests
3.3Insulation Resistance Test
SD-07 Certificates
1.4Certification
SD-08 Manufacturer’s Instructions
Part 2 GManufacturer's Instructions
26 05 13.00 40 SD-03 Product Data
2.2.1 GSingle-Conductor Shielded
Cables
SD-06 Test Reports
GMedium-Voltage Tests
SD-07 Certificates
2.4 GCertificates
Lead Sheath
Flammability
3.1.3 GMinimum Bending Radius
GMedium-Voltage Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 19 PAGES
26 05 13.00 40 1.5 GCable Splicers
SD-08 Manufacturer’s Instructions
1.4 GMedium-Voltage Power Cables
26 09 23.00 40 SD-03 Product Data
2.1.1 GPhotoconductive Control Devices
3.1Installation Drawings
GLight-Sensitive Control Devices
Light Level Sensor
2.2.3 GLighting Contactor
2.2.4 GTime Switch
2.2.5 GPhotocell Switch
SD-06 Test Reports
3.2System Operation Tests
SD-10 Operation and Maintenance
Data
1.3Lighting Control System, Data
Package 5
26 12 19.00 40 SD-02 Shop Drawings
1.4.1 GPad-Mounted Transformer
Drawings
SD-03 Product Data
2.1.1 GPad-Mounted Transformers
SD-06 Test Reports
3.3.1 GAcceptance Checks And Tests
SD-07 Certificates
GTransformer Losses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 19 PAGES
26 12 19.00 40 SD-09 Manufacturer’s Field
Reports
2.3.2Design Tests
2.3.3Routine and Other Tests
SD-10 Operation and Maintenance
Data
1.5.1 GTransformer(s)
SD-11 Closeout Submittals
2.3.1 GTransformer Test Schedule
1.6 GWarranty
26 13 01 SD-02 Shop Drawings
1.5.1 GSwitchgear Drawings
SD-03 Product Data
1.5.3 GFuse Time-Current Characteristic
Curves
2.1 GAir Insulated Pad-mounted
Switchgear
2.2 GInsulated High-Voltage
Connectors
2.3 GSurge Arresters
SD-06 Test Reports
3.4.1 GAcceptance Checks and Tests
SD-07 Certificates
1.5.2 GPaint Coating System
SD-09 Manufacturer’s Field
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 19 PAGES
26 13 01 2.6.1 GSwitchgear design and production tests
SD-10 Operation and Maintenance
Data
1.6.1 GAir Insulated Pad-Mounted
Switchgear Operation and
Maintenance
26 18 23.00 40 SD-02 Shop Drawings
Part 2 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
Part 2Equipment and Performance
Data
2.1.3Mounting Brackets
SD-08 Manufacturer’s Instructions
1.3.1 GInstallation Instructions
SD-10 Operation and Maintenance
Data
1.3.2 GOperation and Maintenance
Manuals
26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings
2.1.1Outline Drawings
SD-03 Product Data
1.3 GPanelboards
2.1.1 GPanelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 19 PAGES
26 24 16.00 40 2.1.3Directory Card and Holder
2.1.4Filtered Panelboards
SD-06 Test Reports
3.2Continuity Tests
3.2Insulation Tests
SD-07 Certificates
1.4Statements
SD-08 Manufacturer’s Instructions
1.3Panelboards
2.1.1Panelboards
26 27 13.10 30 SD-03 Product Data
2.1 GPower Meters
2.1.3 GCurrent
2.1.2 GPotential Transformer
2.2.2 GCommunications Module
1.6.1 GProtocol Modules
1.6.2 GData Recorder
1.6.2 GModem
SD-06 Test Reports
3.3.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
2.1 GPower Meters
2.2.2 GCommunications Module
1.6.1 GProtocol Modules
1.6.2 GData Recorder
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 19 PAGES
26 27 13.10 30 1.6.2 GModem
SD-11 Closeout Submittals
3.3.2 GSystem Function Verification
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
SD-02 Shop Drawings
1.5.1.1 GLuminaire drawings
1.5.1.2 GPoles
SD-03 Product Data
2.2 GInduction Luminaires
2.2.2 GLuminaire Light Sources
GLuminaire Ballasts and
Generators
2.3.3 GLighting contactor
2.3.2 GTime switch
GLighting Control Relay Panel
2.3.1 GPhotocell
2.4.1 GSteel poles
Brackets
SD-05 Design Data
1.5.3 GDesign Data for luminaires
SD-06 Test Reports
3.2Operating test
SD-07 Certificates
GLuminaire Useful Life Certificate
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 19 PAGES
26 56 00 Concrete poles
Fiberglass poles
SD-10 Operation and Maintenance
Data
1.7.1Electronic Ballast Warranty
1.8Operational Service
31 00 00 SD-01 Preconstruction Submittals
3.3Shoring
Dewatering Work Plan
SD-03 Product Data
3.7 GUtilization of Excavated Materials
Rock Excavation
Opening of any Excavation or
Borrow Pit
3.12Shoulder Construction
SD-06 Test Reports
3.15Testing
SD-07 Certificates
3.15Testing
31 05 21 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1.1Allowable Strength
1.4Manufacturer
SD-04 Samples
2.1Geogrid Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 19 PAGES
31 05 21 SD-06 Test Reports
2.1Geogrid Reinforcement
2.1.1Coefficient of Interaction
Interface Friction Testing
3.1.4Splices
Conformance Testing
SD-07 Certificates
2.1Certificates of Compliance
31 23 00.00 20 SD-06 Test Reports
1.6 GBorrow Site Testing
3.12.2.1Fill and backfill
3.12.2.2Select material
3.12.2.3Porous fill
3.12.2.4Density tests
32 01 13 SD-03 Product Data
Waybills and Delivery Tickets
1.2.1Equipment List
3.2.3Inspection Reports
SD-04 Samples
1.4.2Bituminous Materials
2.2 GFog Seal
SD-06 Test Reports
Tests
32 01 19 SD-03 Product Data
3.1.2.3 GManufacturer's
Recommendations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 19 PAGES
32 01 19 3.1Equipment
SD-04 Samples
1.4.1 GMaterials
SD-06 Test Reports
GCertified Copies of the Test
Reports
32 11 16 SD-03 Product Data
1.4Equipment
1.1.3Waybills and Delivery Tickets
SD-06 Test Reports
1.6Sampling and Testing
1.6.2.4Field Density Tests
32 11 23 SD-03 Product Data
2.1Plant, Equipment, and Tools
Waybills and Delivery Tickets
SD-06 Test Reports
1.4 GSampling and Testing
1.4.2.4 GField Density Tests
32 12 10 SD-03 Product Data
Waybills and Delivery Tickets
Local/Regional Materials
SD-06 Test Reports
3.7Sampling and Testing
32 12 16 SD-03 Product Data
2.4 GMix Design
3.10 GQuality Control
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 19 PAGES
32 12 16 3.11 GMaterial Acceptance
1.1.1 GPercent Payment
SD-04 Samples
2.3Asphalt Cement Binder
2.2Aggregates
SD-06 Test Reports
2.2 GAggregates
3.10.3.10QC Monitoring
SD-07 Certificates
2.3 GAsphalt Cement Binder
3.6Testing Laboratory
32 16 13 SD-03 Product Data
2.1Concrete
SD-06 Test Reports
3.8Field Quality Control
32 17 24.00 10 SD-03 Product Data
1.3 GEquipment
Composition Requirements
1.5.1Qualifications
SD-06 Test Reports
2.4Sampling and Testing
SD-07 Certificates
Volatile Organic Compound
(VOC)
32 92 19 SD-03 Product Data
2.4.1Wood cellulose fiber mulch
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 19 PAGES
32 92 19 Fertilizer
SD-06 Test Reports
2.2.2Topsoil composition tests
SD-07 Certificates
2.1seed
SD-08 Manufacturer’s Instructions
Erosion Control Materials
33 40 00 SD-03 Product Data
3.3Placing Pipe
SD-04 Samples
2.1Pipe for Culverts and Storm
Drains
SD-07 Certificates
2.1.10Resin Certification
2.1.11Resin Certification
3.8Pipeline Testing
2.7Hydrostatic Test on Watertight
Joints
3.7.5Determination of Density
2.3.7Frame and Cover for Gratings
33 71 02 SD-02 Shop Drawings
1.5.1 GPrecast underground structures
SD-03 Product Data
2.5 GMedium voltage cable
2.7 GMedium voltage cable joints
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 19 PAGES
33 71 02 2.6 GMedium voltage cable terminations
GPrecast concrete structures
Sealing Material
3.4.2Pulling-In Irons
2.13.2 GManhole frames and covers
2.13.3 GHandhole frames and covers
2.13.5 GComposite/fiberglass handholes
2.14 GCable supports
2.17 GProtective Devices and
Coordination
SD-06 Test Reports
2.18.2 GMedium voltage cable
qualification and production tests
3.17.1 GField Acceptance Checks and
Tests
2.18.1 GArc-proofing test
GCable Installation Plan and
Procedure
SD-07 Certificates
1.5.2 GCable splicer/terminator
1.5.3 GCable Installer Qualifications
GCertificate of Conformance
34 71 13.16 SD-03 Product Data
FHWA Acceptance Letter
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 19 PAGES
34 71 13.16 End Anchorage
Crash Cushion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .