Attachment_2_-_AF_Form_66_SOMS.pdf

PDF 551 KB Posted

Attached to
Repair Sanitary Sewer Deficiencies, Phase 3 Federal contract opportunity
Solicitation number
FA4855-16-B-0004
Issued by
Department of the Air Force Special Operations Command

About this file

AF Form 66 SOMS

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sanitary Sewer Deficiencies, Phase 3, newest first.
File Type Posted
CAFB_Repair_San_Sewer_Def_PH_2_-_IFC_Specs_PDF_Binder.pdf PDF
Attachment_2_-_AF_Form_66_SOMS.pdf PDF
FA4855-16-B-0004_Amendment_1.pdf PDF
Attachment_5_-_NM_WAGE_DETERMINATION.pdf PDF
Questions_and_Answers.pdf PDF
Attachment_3_-_General_Requirements.pdf PDF
Attachment_5_-_NM_WAGE_DETERMINATION.pdf PDF
Attachment_4_-_Drawings.pdf PDF
Attachment_3_-_General_Requirements.pdf PDF
FA4855-13-B-0004.pdf PDF
Attachment_1_-_SOW.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM, DESCRIPTION OF ITEM,

CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

ER

TI

F

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C

O

LO

R S

EL

EC

T

TE

ST

R

ES

U

LT

S

M A

N F'

R R

EC

O

M M

EN

D

A

TI

O N

S

M A

N F'

R . W

A R

R A

N

TY

LI

C

EN

SE

D A

PP

LI

C A

TO

R

M A

N U

F' S

TE

C

H N

IC

A

L D

A

TA

IN

SP

EC

TO

R S

FI

LE

S O

N

LY

O

TH

ER

R

EQ

U

IR

ED

SU

B M

IS

SI

O N

D A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

C O

N

TR

A C

TO

R

N O

TI

FI

A pp ro va l D at e

C O

N

TR

A C

TO

R

N O

TI

FI

ED

D is

A pp ro va l D at e

C O

N

TR

A C

TO

R

E-

SU

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

R

EM

A R

K S

01 01 00 1.4 Fire Prevention Briefing Notification

NLT 15 days Prior to preconstruction meeting and As added during project

2 01 01 00 1.8 Utility Outage Request 3 3 NLT 14 days prior to

Outage

01 01 00 1.2 AF Form 103 - Work Clearance Request

3 3 3 NLT 7 days prior to start of

Work

4 01 01 00 1.5 As-builts 3 NLT 2 Weeks Ater Project

Completion

01 33 00 1.1 Construction Progress Schedule

3 5 days after NTP

6 01 35 26 1.3 Activity Hazard Analysis 3 NLT 15 Days Before Start of

Work

7 01 35 26 1.13 Accident Notification 3 As Incident Occurs

8 01 35 26 1.13 Accident Report 3 As Incident Occurs

9 01 74 19 1.7 Records of Waste Materials 3 Upon Comletion of

Construction

10 02 41 00 2.2 Concrete for Pipe Plugs 3 NLT 15 Days Before Start of

Work

11 02 41 00 2.3 Flowable Fill 3 NLT 15 Days Before Start of

Work

12 02 41 00 2.4 Sand 3 NLT 15 Days Before Start of

Work

13 03 01 32 2.1 Epoxy Resin Binder 3 NLT 15 Days Before Start of

Work

14 03 01 32 2.1 Non-pressure Epoxy Grout 3 NLT 15 Days Before Start of

Work

15 03 30 00 2.3 Concrete Mix Design 3 NLT 30 Days Before Start of

Work

16 03 30 00 2.4 Fly Ash 3 NLT 15 Days Before Start of

Work

17 03 30 00 2.5 Reinforcing Steel 3 NLT 15 Days Before Start of

Work

03 30 00 1.6.4 Test Reports: Fly ash, Pozzolan, GBFS

NLT 15 Days Before Start of

Work

03 30 00 1.6.4 Test Results: Compressive Strength, Air Content, Slump

NLT than 5 Days after

Testing

NUMBER OF COPIES REQUIRED

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS

PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.

CZQZ 140554

Repair Sanitary Sewer I-I

Def, PH3

TO BE COMPLETED BY PROJECT ENGINEER

FA4855-15-B-0013

Attachment 2

19 May 2015 1 of 2

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L I N E

N U M B E R

ITEM, DESCRIPTION OF ITEM,

CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

ER

TI

F

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C

O

LO

R S

EL

EC

T

TE

ST

R

ES

U

LT

S

M A

N F'

R R

EC

O

M M

EN

D

A

TI

O N

S

M A

N F'

R . W

A R

R A

N

TY

LI

C

EN

SE

D A

PP

LI

C A

TO

R

M A

N U

F' S

TE

C

H N

IC

A

L D

A

TA

IN

SP

EC

TO

R S

FI

LE

S O

N

LY

O

TH

ER

R

EQ

U

IR

SU

B M

IS

SI

O N

D A

TE

D A

TE

R

EC

EI

VE

D

IN

O N

TR

A

C

TI

N G

D A

TE

T

O

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

C O

N

TR

A C

TO

R

N O

TI

FI

A pp ro va l D at e

C O

N

TR

A C

TO

R

N O

TI

FI

ED

D is

A pp ro va l D at e

C O

N

TR

A C

TO

E-

SU

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

R

EM

A R

K S

NUMBER OF COPIES REQUIRED

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS

PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.

CZQZ 140554

Repair Sanitary Sewer I-I

Def, PH3

TO BE COMPLETED BY PROJECT ENGINEER

20 31 23 00.00 20 1.3 Density Tests 3 NLT 5 Days After Testing

21 31 23 00.00 20 2.1 Fill Material 3 NLT 15 Days Before Start of

Work

22 31 23 00.00 20 1.3 Shoring 3 NLT 15 Days Before Start of

Work

31 23 00.00 20 2.7 Warning and Identification Tape

NLT 15 Days Before Start of

Work

24 32 12 16 1.4 Aggregates 3 NLT 15 Days Before Start of

Work

25 32 12 16 1.4 Asphalt Cement Binder 3 NLT 15 Days Before Start of

Work

26 32 12 16 1.4 Contractor Quality Control 3 NLT 15 Days Before Start of

Work

27 32 12 16 1.4 Mix Design 3 NLT 30 Days Before Start of

Work

33 01 99 1.3 CIPP Liner Wet-out Procedures

3 3 NLT 15 Days Before Start of

Work

29 33 01 99 2.2 CIPP Liner/Resin 3 3 3 3 3 NLT 15 Days Before Start of

Work

30 33 01 99 1.3 Quality Control Testing 3 3 NLT 15 Days After Liner

Installation

31 33 30 00 2.3 External Seal 3 3 3 NLT 15 Days Before Start of

Work

32 33 30 00 2.1 Pipeline Materials 3 NLT 15 Days Before Start of

Work

33 33 30 00 2.2 Portland Cement 3 NLT 15 Days Before Start of

Work

34 33 30 00 2.3 Precast Concrete Manhole 3 NLT 15 Days Before Start of

Work

35 33 30 00 2.3 Riser Rings 3 3 NLT 15 Days Before Start of

Work

36 33 30 00 1.3 Shop Drawings 3 NLT 15 Days Before Start of

Work

37 33 30 00 2.3 Frame and Cover 3 NLT 15 Days Before Start of

Work

38 CCTV Video File and Analysis Report 3 3 NLT 7 days After CCTV

Completion

39 01 57 00 Traffic Control Plan 3 NLT 14 Days Before Road

Closure

FA4855-15-B-0013

Attachment 2

19 May 2015 2 of 2

Sheet1

File details come from the government source that posted it. Updated .