Attachment_2_-_AF_Form_66_SOMS.pdf
PDF 600 KB Posted
- Attached to
- Repair Sanitary Sewer Deficiencies, Phase 3 Federal contract opportunity
- Solicitation number
- FA4855-16-B-0004
About this file
Schedule of Material Submittals with correct solicitation number indicated in header.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CAFB_Repair_San_Sewer_Def_PH_2_-_IFC_Specs_PDF_Binder.pdf | ||
| Attachment_5_-_NM_WAGE_DETERMINATION.pdf | ||
| Questions_and_Answers.pdf | ||
| Attachment_3_-_General_Requirements.pdf | ||
| FA4855-16-B-0004_Amendment_1.pdf | ||
| Attachment_2_-_AF_Form_66_SOMS.pdf | ||
| Attachment_3_-_General_Requirements.pdf | ||
| FA4855-13-B-0004.pdf | ||
| Attachment_1_-_SOW.pdf | ||
| Attachment_5_-_NM_WAGE_DETERMINATION.pdf | ||
| Attachment_4_-_Drawings.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E R
ITEM, DESCRIPTION OF ITEM,
CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C
ER
TI
F
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C
O
LO
R S
EL
EC
T
TE
ST
R
ES
U
LT
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
M A
N F'
R . W
A R
R A
N
TY
LI
C
EN
SE
D A
PP
LI
C A
TO
R
M A
N U
F' S
TE
C
H N
IC
A
L D
A
TA
IN
SP
EC
TO
R S
FI
LE
S O
N
LY
O
TH
ER
R
EQ
U
IR
ED
SU
B M
IS
SI
O N
D A
TE
D A
TE
R
EC
EI
VE
D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
C O
N
TR
A C
TO
R
N O
TI
FI
ED
A pp ro va l D at e
C O
N
TR
A C
TO
R
N O
TI
FI
ED
D is
A pp ro va l D at e
C O
N
TR
A C
TO
R
R E-
SU
B
M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
R
EM
A R
K S
01 01 00 1.4 Fire Prevention Briefing Notification
NLT 15 days Prior to preconstruction meeting and As added during project
2 01 01 00 1.8 Utility Outage Request 3 3 NLT 14 days prior to
Outage
01 01 00 1.2 AF Form 103 - Work Clearance Request
3 3 3 NLT 7 days prior to start of
Work
4 01 01 00 1.5 As-builts 3 NLT 2 Weeks Ater Project
Completion
01 33 00 1.1 Construction Progress Schedule
3 5 days after NTP
6 01 35 26 1.3 Activity Hazard Analysis 3 NLT 15 Days Before Start of
Work
7 01 35 26 1.13 Accident Notification 3 As Incident Occurs
8 01 35 26 1.13 Accident Report 3 As Incident Occurs
9 01 74 19 1.7 Records of Waste Materials 3 Upon Comletion of
Construction
10 02 41 00 2.2 Concrete for Pipe Plugs 3 NLT 15 Days Before Start of
Work
11 02 41 00 2.3 Flowable Fill 3 NLT 15 Days Before Start of
Work
12 02 41 00 2.4 Sand 3 NLT 15 Days Before Start of
Work
13 03 01 32 2.1 Epoxy Resin Binder 3 NLT 15 Days Before Start of
Work
14 03 01 32 2.1 Non-pressure Epoxy Grout 3 NLT 15 Days Before Start of
Work
15 03 30 00 2.3 Concrete Mix Design 3 NLT 30 Days Before Start of
Work
16 03 30 00 2.4 Fly Ash 3 NLT 15 Days Before Start of
Work
17 03 30 00 2.5 Reinforcing Steel 3 NLT 15 Days Before Start of
Work
03 30 00 1.6.4 Test Reports: Fly ash, Pozzolan, GBFS
NLT 15 Days Before Start of
Work
03 30 00 1.6.4 Test Results: Compressive Strength, Air Content, Slump
NLT than 5 Days after
Testing
NUMBER OF COPIES REQUIRED
AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS
PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.
CZQZ 140554
Repair Sanitary Sewer I-I
Def, PH3
TO BE COMPLETED BY PROJECT ENGINEER
FA4855-16-B-0004
Attachment 2
19 May 2015 1 of 2
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E R
ITEM, DESCRIPTION OF ITEM,
CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C
ER
TI
F
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C
O
LO
R S
EL
EC
T
TE
ST
R
ES
U
LT
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
M A
N F'
R . W
A R
R A
N
TY
LI
C
EN
SE
D A
PP
LI
C A
TO
R
M A
N U
F' S
TE
C
H N
IC
A
L D
A
TA
IN
SP
EC
TO
R S
FI
LE
S O
N
LY
O
TH
ER
R
EQ
U
IR
SU
B M
IS
SI
O N
D A
TE
D A
TE
R
EC
EI
VE
D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
C O
N
TR
A C
TO
R
N O
TI
FI
A pp ro va l D at e
C O
N
TR
A C
TO
R
N O
TI
FI
ED
D is
A pp ro va l D at e
C O
N
TR
A C
TO
R
R
E-
SU
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
R
EM
A R
K S
NUMBER OF COPIES REQUIRED
AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS
PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.
CZQZ 140554
Repair Sanitary Sewer I-I
Def, PH3
TO BE COMPLETED BY PROJECT ENGINEER
20 31 23 00.00 20 1.3 Density Tests 3 NLT 5 Days After Testing
21 31 23 00.00 20 2.1 Fill Material 3 NLT 15 Days Before Start of
Work
22 31 23 00.00 20 1.3 Shoring 3 NLT 15 Days Before Start of
Work
31 23 00.00 20 2.7 Warning and Identification Tape
NLT 15 Days Before Start of
Work
24 32 12 16 1.4 Aggregates 3 NLT 15 Days Before Start of
Work
25 32 12 16 1.4 Asphalt Cement Binder 3 NLT 15 Days Before Start of
Work
26 32 12 16 1.4 Contractor Quality Control 3 NLT 15 Days Before Start of
Work
27 32 12 16 1.4 Mix Design 3 NLT 30 Days Before Start of
Work
33 01 99 1.3 CIPP Liner Wet-out Procedures
3 3 NLT 15 Days Before Start of
Work
29 33 01 99 2.2 CIPP Liner/Resin 3 3 3 3 3 NLT 15 Days Before Start of
Work
30 33 01 99 1.3 Quality Control Testing 3 3 NLT 15 Days After Liner
Installation
31 33 30 00 2.3 External Seal 3 3 3 NLT 15 Days Before Start of
Work
32 33 30 00 2.1 Pipeline Materials 3 NLT 15 Days Before Start of
Work
33 33 30 00 2.2 Portland Cement 3 NLT 15 Days Before Start of
Work
34 33 30 00 2.3 Precast Concrete Manhole 3 NLT 15 Days Before Start of
Work
35 33 30 00 2.3 Riser Rings 3 3 NLT 15 Days Before Start of
Work
36 33 30 00 1.3 Shop Drawings 3 NLT 15 Days Before Start of
Work
37 33 30 00 2.3 Frame and Cover 3 NLT 15 Days Before Start of
Work
38 CCTV Video File and Analysis Report 3 3 NLT 7 days After CCTV
Completion
39 01 57 00 Traffic Control Plan 3 NLT 14 Days Before Road
Closure
FA4855-15-B-0013
Attachment 2
19 May 2015 2 of 2