Questions_and_Answers_for_Pentagon_Mural_Requirement_2.pdf
PDF 53 KB Posted
- Attached to
- Pentagon Murals Federal contract opportunity
- Solicitation number
- FA481419TF144
About this file
Q&A for Pentagon Mural Project _2
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for Pentagon Mural Requirement (#10-17)
10. We need to confirm detailed information pertaining to the material thickness of the Pop Out elements and dimensional letters throughout the packet. There appears to be discrepancies within each appendix.
Example: Appendix 5: Soldier Pop Out is specified as ¼" Gator or PVC on the title page, and 1"on page 3.
Soldier pop out is 1/4 inch.
11. Since all dimensional letters are being produced in house, will a source for the Bronze Metal Mica be provided prior to the proposal due date for appropriate cost references?
No source will be provided
12. Knowing the government will provide the letters, and letter templates, will the letters be supplied with double faced tape, or similar adhesion materials for installation, or will we, as the installer, provide all necessary materials?
The government will not be providing the letters. All letters to be created and installed by the vendor.
13. We need to confirm that the art, art templates will be provided by the government.
Yes, they will be provided by the government
14. Is there a preference of finish for the wall mural; Gloss or Matte?
Matte finish.
15. What is the consideration for the channel detail in the wall between the Mural and the Title Banner?
Pictures and description given in the appendixes.
16. Is there a deadline for the award date? How soon following can we meet and perform a walk through confirming all necessary measurements and location details?
Deferring award timeline to the contracting office. A walk can be scheduled at the pentagon ASAP after award. Please look at #1 on first Q&A Amendment
17. If awarded the project, how soon would the art work be provided? What is the approval process once the art work is laid out into the templates and presented for production?
The art is ready now. The governemtn will need a on-site production proof before installation.