Questions_and_Answers_for_Pentagon_Mural_Requirement_2.pdf

PDF 53 KB Posted

Attached to
Pentagon Murals Federal contract opportunity
Solicitation number
FA481419TF144
Issued by
Department of the Air Force Air Mobility Command

About this file

Q&A for Pentagon Mural Project _2

View the file

Other files for this federal contract opportunity

Other files attached to Pentagon Murals, newest first.
File Type Posted
Q&A_for_Pentagon_Mural_Requirement.pdf PDF
Atch_1_SON_USSOCOM_Pentagon_project_as_of_2019_08_01.pdf PDF
App_6_-_PENTAGON_MURALS_-_20190711_-_WALL_A1.pdf PDF
App_11_-_PENTAGON_MURALS_-_20190711_-_WALL_G.pdf PDF
App_7_-_PENTAGON_MURALS_-_20190711_-_WALL_B.pdf PDF
App_4_-_PENTAGON_MURALS_-_20190711_-_FALSE_WALLS.pdf PDF
App_16_-_PENTAGON_MURALS_-_20190711_-_MIN_QUALITY_STDS.pdf PDF
AFICA_Combined_Synopsis_Sol.pdf PDF
App_8_-_PENTAGON_MURALS_-_20190711_-_WALLS_C&D.pdf PDF
App_5_-_PENTAGON_MURALS_-_20190711_-_WALL_A.pdf PDF
Atch_1_SON_USSOCOM_Pentagon_Mural_Project.pdf PDF
App_12_-_PENTAGON_MURALS_-_20190711_-_WALL_H.pdf PDF
App_14_-_PENTAGON_MURALS_-_20190711_-_WALL_L_&_M.pdf PDF
App_15_-_PENTAGON_MURALS_-_20190711_-_ADDITIONAL_MURAL_REQ..pdf PDF
App_9_-_PENTAGON_MURALS_-_20190711_-_WALL_E.pdf PDF
Atch_3_Clauses_and_Provisions.pdf PDF
Atch_2_Wage_Determination_6_19_2019.pdf PDF
App_2_-_PENTAGON_MURALS_-_20190711_-_SAMPLES_OF_3D_LETTERING.pdf PDF
App_10_-_PENTAGON_MURALS_-_20190711_-_WALL_F.pdf PDF
App_13_-_PENTAGON_MURALS_-_20190711_-_WALL_K.pdf PDF
App_3_-_PENTAGON_MURALS_-_20190711_-_SAMPLES_OF_POP-OUTS.pdf PDF
App_1_-_PENTAGON_MURALS_-_20190711_-_EXHIBIT_SPACE.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Pentagon Mural Requirement (#10-17)

10. We need to confirm detailed information pertaining to the material thickness of the Pop Out elements and dimensional letters throughout the packet. There appears to be discrepancies within each appendix.

Example: Appendix 5: Soldier Pop Out is specified as ¼" Gator or PVC on the title page, and 1"on page 3.

Soldier pop out is 1/4 inch.

11. Since all dimensional letters are being produced in house, will a source for the Bronze Metal Mica be provided prior to the proposal due date for appropriate cost references?

No source will be provided

12. Knowing the government will provide the letters, and letter templates, will the letters be supplied with double faced tape, or similar adhesion materials for installation, or will we, as the installer, provide all necessary materials?

The government will not be providing the letters. All letters to be created and installed by the vendor.

13. We need to confirm that the art, art templates will be provided by the government.

Yes, they will be provided by the government

14. Is there a preference of finish for the wall mural; Gloss or Matte?

Matte finish.

15. What is the consideration for the channel detail in the wall between the Mural and the Title Banner?

Pictures and description given in the appendixes.

16. Is there a deadline for the award date? How soon following can we meet and perform a walk through confirming all necessary measurements and location details?

Deferring award timeline to the contracting office. A walk can be scheduled at the pentagon ASAP after award. Please look at #1 on first Q&A Amendment

17. If awarded the project, how soon would the art work be provided? What is the approval process once the art work is laid out into the templates and presented for production?

The art is ready now. The governemtn will need a on-site production proof before installation.