App_4_-_PENTAGON_MURALS_-_20190711_-_FALSE_WALLS.pdf

PDF 5 MB Posted

Attached to
Pentagon Murals Federal contract opportunity
Solicitation number
FA481419TF144
Issued by
Department of the Air Force Air Mobility Command

About this file

Pentagon Murals

View the file

Other files for this federal contract opportunity

Other files attached to Pentagon Murals, newest first.
File Type Posted
Questions_and_Answers_for_Pentagon_Mural_Requirement_2.pdf PDF
Q&A_for_Pentagon_Mural_Requirement.pdf PDF
Atch_1_SON_USSOCOM_Pentagon_project_as_of_2019_08_01.pdf PDF
Atch_2_Wage_Determination_6_19_2019.pdf PDF
App_2_-_PENTAGON_MURALS_-_20190711_-_SAMPLES_OF_3D_LETTERING.pdf PDF
App_10_-_PENTAGON_MURALS_-_20190711_-_WALL_F.pdf PDF
App_13_-_PENTAGON_MURALS_-_20190711_-_WALL_K.pdf PDF
App_3_-_PENTAGON_MURALS_-_20190711_-_SAMPLES_OF_POP-OUTS.pdf PDF
App_1_-_PENTAGON_MURALS_-_20190711_-_EXHIBIT_SPACE.pdf PDF
App_6_-_PENTAGON_MURALS_-_20190711_-_WALL_A1.pdf PDF
App_11_-_PENTAGON_MURALS_-_20190711_-_WALL_G.pdf PDF
App_7_-_PENTAGON_MURALS_-_20190711_-_WALL_B.pdf PDF
App_16_-_PENTAGON_MURALS_-_20190711_-_MIN_QUALITY_STDS.pdf PDF
AFICA_Combined_Synopsis_Sol.pdf PDF
App_8_-_PENTAGON_MURALS_-_20190711_-_WALLS_C&D.pdf PDF
App_5_-_PENTAGON_MURALS_-_20190711_-_WALL_A.pdf PDF
Atch_1_SON_USSOCOM_Pentagon_Mural_Project.pdf PDF
App_12_-_PENTAGON_MURALS_-_20190711_-_WALL_H.pdf PDF
App_14_-_PENTAGON_MURALS_-_20190711_-_WALL_L_&_M.pdf PDF
App_15_-_PENTAGON_MURALS_-_20190711_-_ADDITIONAL_MURAL_REQ..pdf PDF
App_9_-_PENTAGON_MURALS_-_20190711_-_WALL_E.pdf PDF
Atch_3_Clauses_and_Provisions.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FALSE WALL MURALS - USASOC

mounted on (Black) 1/8 Foam Core or PVC

Must have frame constructed that meets PENTAGON Standards: See attachment;

MURAL:

HEADLINE - Cap Height & Kearning: 500 – 550 pt. TITLES: ½” Foam Core or PVC – Faced with Bronze Metal Mica SUB HEAD – 300 pt.

BODY COPY – 150pt.

POP OUTS: Two (2) 20” H x 40” W photos mounted on (Black) 1/8 Foam Core or PVC

One (1) component logo = 20” W by _______” H – Height varies by logo.

Logo mounted on (Black) 1/8 Foam Core or PVC

HEADLINE

ESTIMATE: 90” H x 190” L

Appendix 4

FALSE WALL MURALS - NSW

Must have frame constructed that meets PENTAGON Standards: See attachment;

MURAL:

HEADLINE - Cap Height & Kearning: 500 – 550 pt. TITLES: ½” Foam Core or PVC – Faced with Bronze Metal Mica SUB HEAD – 300 pt.

BODY COPY – 150pt.

POP OUTS: Two (2) 20” H x 40” W photos mounted on (Black) 1/8 Foam Core or PVC

One (1) component logo = 20” W by _______” H – Height varies by logo.

Logo mounted on (Black) 1/8 Foam Core or PVC

ESTIMATE: 90” H x 190” L

FALSE WALL MURALS - AFSOC

MURAL:

HEADLINE - Cap Height & Kearning: 500 – 550 pt. TITLES: ½” Foam Core or PVC – Faced with Bronze Metal Mica SUB HEAD – 300 pt.

BODY COPY – 150pt.

POP OUTS: Two (2) 20” H x 40” W photos mounted on (Black) 1/8 Foam Core or PVC

One (1) component logo = 20” W by _______” H – Height varies by logo.

ESTIMATE: 90” H x 180” L

FALSE WALL MURALS - MARSOC

MURAL:

HEADLINE - Cap Height & Kearning: 500 – 550 pt. TITLES: ½” Foam Core or PVC – Faced with Bronze Metal Mica SUB HEAD – 300 pt.

BODY COPY – 150pt.

POP OUTS: Two (2) 20” H x 40” W photos mounted on (Black) 1/8 Foam Core or PVC

One (1) component logo = 20” W by _______” H – Height varies by logo.

ESTIMATE: 90” H x 180” L

FALSE WALL MURALS – Frame Concept and Location

FALSE WALL MURALS – Frame Concept and Location

FALSE WALLS

80” Height

Wall Width 4” to 6”

Qty 4 - Support Pole and Ceiling Mounting Bracket

REQUIREMENTS

• Hollow Core -

Fire/Physical Damage

Resistant Framed Wall

• Smooth Substrate Surface

• Minimum - Four (4)

Ceiling Support Mounting

Brackets

FALSE WALL MURALS – Location

FALSE WALL MURALS – Location & Frame concept

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8

File details come from the government source that posted it.