Answers_to_Questions.pdf

PDF 102 KB Posted

Attached to
Paint and Protective Coating Federal contract opportunity
Solicitation number
FA4803-19-B-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Answers to Questions sent in by Contractors

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Solicitation page 37 of 64 states that Volume I is to contain the offeror’s detailed cost breakdown. Is this ONLY Attachment 2? Or is something further required? Please clarify.

Only attachment 2 needs a detailed cost breakdown.

2. In the solicitation, page 35 of 64, section 002113, (a) 1.4, offerors are instructed to deliver bids three days before the close of the invitation for bid. Please clarify this requirement.

Bids will be due on the 15th of February at 2:00PM EST.

3. In the solicitation, page 36 of 64, section 002113, (b), there is a scheduled bid opening for 21

December 2018 at 2:00PM yet previous requirements (as indicated in question 2 above) indicates that bids must be delivered three days prior to this date. Please clarify if the bid will be opened publicly and what date and time bids must be delivered.

Bids will be turned in on the 15th of February at 2:00PM EST and the Date to Open Bids will be on the 15th of February at 3:30PM EST.

4. In the solicitation, page 37 of 64, section 002113, (g), requirements state that a bid guarantee is required but no requirements are provided. Please outline the bid bond requirements (example: 20% of the bid price not to exceed $3,000,000).

5. Will there be liquidated damages on this contract? If yes, please provide the amount.

Liquidated damages will be decided on each individual task order if needed.

6. Our painters use ladders and rental scissor lifts as needed. Are scissor lifts or scaffolds available at Shaw AFB for use if needed? Yes, there’re available at our approval.

7. SOW Paragraph 5.1.4 Reimbursable Items:

a. This CLIN is only for paint, sign metal, vinyl/scotch lite for sign fabrication and CO/COR approved rental equipment? It is not for thinners, roller covers, brushes, drops, tape, equipment fuel and any other sundry related to the work?

b. How is this CLIN to be priced? This reimbursable is unknown and should not affect the overall bid price. The previous contract solicitation of 2011 was amended with a unit price of $0.00 NC for this CLIN. $1.00 NC

8. Attachment_2_BLANK_Paint_Estimate_FY18_thru_FY21:

a. This file references “Means” under the Material Costs and Labor Costs. Please clarify the intention of this reference. In Solicitation

b. At the bottom of this file there are two lines for “Projected Interior Paint Cost” and

“Projected Exterior Paint Cost”. What is to be placed on these lines? In Solicitation

c. Is the Line Total column meant to represent the total cost to perform the Quantity provided? Also, is this meant to represent the costs only, leaving out Overhead and Profit (there is no column for these items)? In Solicitation

9. The RFP states that the bid shall be delivered by carrier or hand-delivery three days before the close of invitation of bids. Please clarify if the proposal is due on 25Jan19 or 22Jan19.

Proposal is due on the 15th of February at 2:00PM EST.

10. Page 37, section (f), bullet point 2, requires complete pricing information for CLIN 0001- CLIN3001AU be included in Vol. II-Contract Documentation…however, on the same page, in the same section, bullet point 4 requires ‘All pricing information must be included in the section of the bid designated as Price Volume [Vol. I-Pricing]….Under no circumstances shall this information be documentation included elsewhere in the bid.” Please clarify where pricing should be located in the proposal. Attachment 2 needs a detailed cost breakdown.

11. Is Paint reimbursable for all CLIN SOWs or only in relation to signage? If Paint is reimbursable across all line items then Contractor costing should only reflect indirect labor, direct labor, incidental materials/tools and Supervisions/GCs. Is this an accurate interpretation? Paint is reimbursable for all CLINS. All Materials. Labor is not included as a reimbursable. Reimbursable cost will be decided on each task order. Do not worry about Reimbursable cost on the Base Contract.

12. Sign Blanks: Page 20 of SOW calls for 200 Sq. Ft./year. Attachment 2 Blank Estimate line item 1AP lists 12 sq. ft./year. It’s difficult zero in on volume pricing with this large of a delta. 200 is a low number. KTR needs to price out attachment 2 spreadsheet.

13. Is the intent for Sign Blanks to be manufactured from raw materials within the Sign Shop, or is Sign Shop and equipment provided for Coating/Letter Application only? Contactor should purchase metal and vinyl and charge it under reimbursable CLIN and put sign together in shop.

14. Are the quantities for Part K: Special Events reflected on Attachment 2? Disregard this section.

15. Overall, the estimated quantities from SOW are not IAW with quantities reflected on Attachment 2. Which quantities should Contractor use to gauge annual volume? Expect more than the estimate shows. KTR needs to price out attachment 2 spreadsheet.

16. Does this include all materials to complete the job such as paint, sand paper, drywall mud, etc?

If so, then basically all I would be providing is a labor number. Is that how you understand it?

Paint, sand paper, drywall mud, etc is a reimbursable. Reimbursable cost will be decided on each task order. Do not worry about Reimbursable cost on the Base Contract.

17. Is government intent for contractor to provide fully loaded rate for each line item?

No. KTR needs to price out attachment 2 spreadsheet.

18. Is contractor to include Supervision and other direct overhead to be carried in each line item within IDIQ pricing or will these costs be carried within individual task orders? Read revised attachment 2. LPTA will be based on total cost.

19. What line items are to be totaled at the bottom of each sheet for following: Projected Interior Paint Costs and Projected Exterior Paint Costs? Read revised attachment 2.

20. For Sheet Option Year 3: What is the intent of Guaranteed Minimum?

Whichever company(ies) get awarded the base contract the Minimum Guarantee means that you will be awarded at least a minimum of $2,000.

21. Does it cover rentals on lifts and pressure washers? Contractor shall provide pressure washer.

Rental lifts will be based upon approval from Contracting Officer Representative through a reimbursable approval. Most exterior painting will be done by ladder.

22. Does line1AN (pressure washing) pertain to line 1AA (exterior painting) or will there be additional pressure washing on the exterior prior to painting? They are separate clins. Price out separately.

23. How much prep is going to be involved in line 1AL? For an example will light sanding be sufficient or will other more costly methods need to be used? However much sanding/preparation needed to present a professional appearance per task. It depends on the wall.

24. What exactly does line 1AU cover with a quantity of 100000? Reimbursable cost will be decided on each task order. Do not worry about Reimbursable cost on the Base Contract.

25. Glass Door Stenciling: Can you provide clarity on the size of stenciling? Is this etched or applied stenciling? 1 to 6 inches Vinyl

26. Item 0001AU talks about Reimbursable Supply’s. Does the government want the contractors to take out the cost of supplies, materials and equipment out of quoted prices for each line item and only provide per measurement cost for each category? Reimbursable cost will be decided on each task order. Do not worry about Reimbursable cost on the Base Contract.

27. Interior Trim is commonly quantified as linear footage or in units, opposed to Square Footage.

Can you itemize accordingly? (I.E., 1. Base mold in linear feet; 2. Door frames – Single (HM or Wood) frame; Double (HM or Wood) frame; 3. Door slab – 1 HM Door slab; 1 Wood slab; 4.

Window frame – 1 HM frame)) Square Feet only.

28. ITEM # 0001 AD - Please differentiate what Offerors are to price between Walls, Base and crown mold, Door frames and Doors. Walls will be Interior painting, but Door Frames/Crown mold should be same as interior trims. Wall is considered (paint interior). Base, Doors, Door Frames/Crown mold are (partial interior and trim).

29. ITEM # 0001 AB – What are substrates to be coated (I.E., CMU, Stucco, Wood or Metal siding)?

All material. If multiple coats are required, then they double the numbers/square footage.

30. Under Option Year 3, Item 1AU – Reimbursable Supplies: What is the offeror to provide? A mark-up percentage? Please advise. Reimbursable cost will be decided on each task order. Do not worry about Reimbursable cost on the Base Contract.

31. Please confirm that the detailed cost breakdown goes in the Pricing volume and the Solicitation price supplies/services schedule goes in the Contract Documentation volume? Attachment 2 needs a detailed cost breakdown.