The file's text, extracted by GovTribe without its formatting.
Const ARCENT Parking (B1957)
| Contractor: | | Address: | Shaw AFB, SC | |
| Facility: | B1957 | | | |
| Project: | CONST ARCENT PARKING B1957 (VLSB18-0040) | | IGE: | $0.00 |
| | | Total: | $0.00 |
| B1957 | | | | | | | | |
| Line No. | Item | Unit of Measure | Quantity | Unit | Total | Labor Hours | Avg. Rate | Total | Line Total |
| 1 | Dumpster rental | EA | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 2 | Dumpster dump fee | EA | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 3 | Brush removal | ACRE | $0.00 | | $0.00 | $0.00 | $0.00 |
| 4 | Tree removal | EA | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 5 | Parking lot - subgrade prep | SY | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 6 | Parking lot - surface prep | SY | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 7 | Place 3-in AC binder course | TON | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 8 | Place 3-in AC surface course | TON | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 9 | Parking lot - overhead lighting | EA | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 10 | Parking lot - curb and gutter | LF | $0.00 | - | $0.00 | $0.00 | $0.00 |
| 11 | Parking lot - striping | SF | $0.00 | - | $0.00 | $0.00 | $0.00 |
| TOTALS: | | $0.00 | | $0.00 | $0.00 | $0.00 |
TOTAL MATERIAL COST $0.00
TOTAL LABOR COST $0.00
| TOTAL OTHER DIRECT COST | $0.00 |
| TOTAL DIRECT COST | $0.00 |
| OVERHEAD | % | $0.00 |
| SUBTOTAL | | $0.00 |
| PROFIT | % | $0.00 |
| SUBTOTAL | | $0.00 |
| BOND | % | $0.00 | |
| SUBTOTAL | | $0.00 | |
| | | FA4803-18-B-0002 |
| DESIGN | $0.00 | Blank Cost Estimate |
| TOTAL PROJECT COST | $0.00 | Page 1 of 1 |