About this file

SOW Updated (08/28/2018 to clarify typographical ambiguity)

View the file

Other files for this federal contract opportunity

Other files attached to Modular Building feat. Office Furniture, newest first.
File Type Posted
Questions_Received_(Readdress).pdf PDF
Additional_Documents.pdf PDF
Questions_Received_FINALx.pdf PDF
Final_Trailer_SOW.pdf PDF
Combo_FA4801-18-Q-1090_Amended.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA480118Q1090 SOW

General Requirements:

- Contractor will provide a manufactured building for the Holloman AFB project per specifications provided in this document, product data, project RFQ and associated documents.

- Contractor will provide structural engineered stamped and sealed drawings for building.

- Contractor will provide back boxes and conduit stubbed above ceiling for telecommunications.

- Contractor will provide single phase wall mount electric/electric HVAC and flex duct.

- Contractor will provide electrical device plates light fixtures, motion sensors, HVAC diffusers, mini split HVAC (Equipment only) for telecom rooms, thermostats, vent fans.

- Contractor will deliver and set the buildings, skirt, make crossover connections and finish mate-lines per building manufacturer drawings and specifications.

- Contractor will install the fire sprinkler system.

- Contractor will install Fire Alarm/MNS systems.

- Below building plumbing manifolding.

- Phone, data, telecom cabling and devices, connections, cable tray, ladder tray, cabinets, punch blocks, hangars, and testing.

- ADA site accessibility, aluminum steps, decks and ramps, gutters, downspouts, and splash blocks.

- Building entry controlled with cypher locks.

- Comm room for trailer requires a minimum 10’ x 12’ room

- Contractor will hook into available water, sewer, and power at site. At the site there is asphalt already in place for the trailer, with 1/2” slope. Contractor will need to level trailer.

Room Requirements:

- Restrooms: minimum 3 stalls, 3 urinals & 2 sinks for men’s; 2 stalls & 1 sink for women’s

- Janitor’s closet: minimum 6’ by 4’ room, with drain for mop water.

- Storage room: require a minimum of 12’ by 12’ space

- Classrooms x3: see additional requirements below.

- 2 Office Rooms: see additional requrements below.

FA480118Q1090 SOW

- Classroom Requirements (x3):

- Each classroom must accommodate 20 2-person desks (for 60 desks total, accomodate l20 students total), and 1 instructor podium (media cart style desk, 3 total) at the front of the room.

Need to have adequate cable management in the form of fully enclosed cable management, no baskets, and a large enough trough to hold lots of cables. We need the cable management to go from end to end on the desks and be hidden for a neat and clean appearance (see pictures for reference). Desk size we are needing to purchase are minimum 29" wide by 60” long.

- Classroom electrical/Ethernet connections must be on the walls and not in the floor to avoid tripping hazards.

- Require 4 electrical outlets, 110v/220v and 4 Ethernet connections in wall by each set of two desks, in whichever configuration/solution is most efficient to meet the need for this scenario.

- Classroom Projectors Outlets: Classrooms will need an electrical plug-in installed in the ceiling, approximately 10-15 feet from the front of the classroom to plug in a projector.

Office Room Requirements

1. We require 1 office room that can accommodate a minimum of 8 L-shaped desks.

- Require minimum of 8 wall outlets in sets of 2, 110v/220v every 5 feet. Also require 6 sets of 2 Ethernet connections equally spaced throughout the room.

2. We require 1 office that can accommodate 11 L-shaped desks measuring 78” x 66”, and 3 other desks measuring 60” long x 30” deep. Our current configuration for this office is the L-shaped desks are on the walls of the room and the 3 single desks are in the center.

- Require minimum of 10 wall outlets in sets of 2, 110v/220v every 5 feet. Also require 8 sets of 2 Ethernet connections equally spaced throughout the room.

(END DOCUMENT)