Final_Trailer_SOW.pdf
PDF 79 KB Posted
- Attached to
- Modular Building feat. Office Furniture Federal contract opportunity
- Solicitation number
- FA4801-18-Q-1090
About this file
Updated SOW (after questions)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Received_(Readdress).pdf | ||
| Final_Trailer_SOW.pdf | ||
| Additional_Documents.pdf | ||
| Questions_Received_FINALx.pdf | ||
| Combo_FA4801-18-Q-1090_Amended.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA480118Q1090 SOW
General Requirements:
- Contractor will provide a manufactured building for the Holloman AFB project per specifications provided in this document, product data, project RFQ and associated documents.
- Contractor will provide structural engineered stamped and sealed drawings for building.
- Contractor will provide back boxes and conduit stubbed above ceiling for telecommunications.
- Contractor will provide single phase wall mount electric/electric HVAC and flex duct.
- Contractor will provide electrical device plates light fixtures, motion sensors, HVAC diffusers, mini split HVAC (Equipment only) for telecom rooms, thermostats, vent fans.
- Contractor will deliver and set the buildings, skirt, make crossover connections and finish mate-lines per building manufacturer drawings and specifications.
- Contractor will install the fire sprinkler system.
- Contractor will install Fire Alarm/MNS systems.
- Below building plumbing manifolding.
- Phone, data, telecom cabling and devices, connections, cable tray, ladder tray, cabinets, punch blocks, hangars, and testing.
- ADA site accessibility, aluminum steps, decks and ramps, gutters, downspouts, and splash blocks.
- Building entry controlled with cypher locks.
- Comm room for trailer requires a minimum 10’ x 12’ room
- Contractor will hook into available water, sewer, and power at site. At the site there is asphalt already in place for the trailer, with 1/2” slope. Contractor will need to level trailer.
Room Requirements:
- Restrooms: minimum 3 stalls, 3 urinals & 2 sinks for men’s; 2 stalls & 1 sink for women’s
- Janitor’s closet: minimum 6’ by 4’ room, with drain for mop water.
- Storage room: require a minimum of 12’ by 12’ space
FA480118Q1090 SOW
- Classrooms x3: see additional requirements below.
- 2 Office Rooms: see additional requrements below.
Classroom Requirements (x3):
- Each classroom must accommodate 20 2-person desks (for 60 students total), and 1 instructor podium (media cart style desk) at the front of the room. Need to have adequate cable management in the form of fully enclosed cable management, no baskets, and a large enough trough to hold lots of cables. We need the cable management to go from end to end on the desks and be hidden for a neat and clean appearance (see pictures for reference). Desk size we are needing to purchase are minimum 29" wide by 60” long.
- Classroom electrical/Ethernet connections must be on the walls and not in the floor to avoid tripping hazards.
- Require 4 electrical outlets, 110v/220v and 4 Ethernet connections in wall by each set of two desks, in whichever configuration/solution is most efficient to meet the need for this scenario.
- Classroom Projectors Outlets: Classrooms will need an electrical plug-in installed in the ceiling, approximately 10-15 feet from the front of the classroom to plug in a projector.
Office Room Requirements
1. We require 1 office room that can accommodate a minimum of 8 L-shaped desks.
- Require minimum of 8 wall outlets in sets of 2, 110v/220v every 5 feet. Also require 6 sets of 2 Ethernet connections equally spaced throughout the room.
2. We require 1 office that can accommodate 11 L-shaped desks measuring 78” x 66”, and 3 other desks measuring 60” long x 30” deep. Our current configuration for this office is the L-shaped desks are on the walls of the room and the 3 single desks are in the center.
- Require minimum of 10 wall outlets in sets of 2, 110v/220v every 5 feet. Also require 8 sets of 2 Ethernet connections equally spaced throughout the room.
(END DOCUMENT)