DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 633D AIR BASE WING
JOINT BASE LANGLEY-EUSTIS VA
Global Power For America
08 September 2015
MEMORANDUM FOR ALL OFFERORS
FROM: 633 CONS/LGCD
74 NEALY AVE
LANGLEY AFB VA 23665-2088
SUBJECT: FA4800-15-R-0006, Sunshade Maintenance Solicitation Request for Information
The questions below have been received in response to the subject solicitation:
1. Are all of the lights within the structures LED?
Answer: Six sections within the sunshades have LED lighting.
2. Do the gutters have heat strips?
Answer: The gutters do not have heat strips. Ice has caused damage in the past that was repaired.
3. Will this requirement be used to bring the structures up to code?
Answer: Improvements will be made within the scope of the repair CLINs in the contract. The contractor is responsible for annotating any deficiencies or areas of concern in accordance with the Performance Work Statement (PWS). The government will address the contractor’s findings and take corrective action as necessary.
4. Please address the scope CLIN pricing for repairs.
Answer: The contractor should prepare the inspection report in accordance with the PWS and repair items addressed as part of routine maintenance. The contractor shall provide quotes for repairs other than preventative maintenance in accordance with the quote process outlined in the PWS. The government will review the report, suggested repairs and repair pricing; repairs shall only be made once approved by the government.
5. Is the original metal galvanized?
Answer: Drawings and past information indicate that the metal is not galvanized.
6. Who provided the original design and installation?
Answer: The original drawings are provided by Waller, Todd & Sadler Architects, Inc. in 2006.
7. Will the structure require installation of X-Braces in each section?
Answer: The structure will require preventative maintenance and repairs in accordance with
(IAW) the PWS. If it is noted in the inspection that X-Braces should be installed it should be submitted and approved IAW the PWS.
8. Can we get dimensions or the original drawings?
Answer: The original drawings can be requested on an individual basis and will be provided fully upon award.
9. Can photos to document design differences be taken?
Answer: Photos are provided, please see Attachment One.
10. The Synopsis, paragraph 1. Description states; "This requirement is for the semi-annual inspection and preventative maintenance/repair of three (3) aircraft sunshades". Technical
Exhibit A - Sunshade Configuration appears to show Three (3) Rows of aircraft sunshades with a
Total of Nineteen (19) sunshades. Please confirm the Total Quantity of Sunshades that is to be included in the contractor's Proposal.
Answer: There are three rows of Sunshades; Alpha, Bravo, & Charlie; which house a total of 19
Aircraft providing 19 Shelters.
11. Performance Work Statement, paragraph 1.1.10 Warranties states; "The contractor shall assume and maintain any pre-existing warranties". Please advise what pre-existing warranties are currently in place.
Answer: The customer does not currently have documentation of any warranties on the structures.
12. Please specify the dimensions of the aircraft sunshades. Please specify the Length, Width and
Eave Height of all Sunshades.
Answer: Please see Attachment Two –Drawings for dimensions. The Sunsahdes are approximately 70’ wide, 83’ long, the back of the shelter is 27’6” and the front of the structure is
30’10”.
13. Please advise if a list of the site visit attendees will be provided.
Answer: The government may make this information available at a later date.
14. Will the list of questions and answers from the site visit be provided?
Answer: The questions and answers from the site visit are provided in this document.
15. Do All Sunshades include all of the items listed in the Synopsis, Fabric, Lights, Electric, Bird
Nesting Mitigation, Lightning Protection, Obstruction Lighting, Safety Reflective Devices, and
Fall Protection?
Answer: All Sunshades shall be inspected to the standards listed in Section 1.1.1.5. of the
PWS.
16. Please advise if the Bid Due Date will be extended.
Answer: The quote due date will be extended to 4:00p.m. Eastern 15 September 2015.
Attachment One – Pictures
Attachment Two - Drawings
| A101 Floor plan |
| A201 Building Section |
| RFI's Sunshades |