Attachment 7 DD Checklist Form 1354
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Revision_2_Demo_37 _38 _162.pdf | ||
| Amendment_3_FA4800-15-R-0004.pdf | ||
| Final_Q_ _A_Demo_37 _38 _162_Rev_1.pdf | ||
| SOW_Rev_1_17_Mar_15_Demo_37 _38 _162.pdf | ||
| B_162_Utilities.pdf | ||
| Amendment_2_FA4800-15-R-0004.pdf | ||
| B_37_38_Utilities.pdf | ||
| Section_32_92_19.pdf | ||
| B_37 38 _162_Sidewalk_Demo.pdf | ||
| QA_Response_FA4800-R-15-0004.pdf | ||
| Site_Visit_Sign_In_Sheet_Demo_37 38_ _162.pdf | ||
| AmendmentFA4800-15-R-0004-_0001.pdf | ||
| FINAL_RFP_FA4800-15-R-0004.pdf | ||
| Section_01_11_00_-_Special_Condition_08_Nov_2013.pdf | ||
| RFP_Solicitation_Demo_37 38_and_162.pdf | ||
| Demo_SOW_(LGCS_Format)_F_3738162_(Revised_4_Feb_15).pdf | ||
| Bid_schedule.pdf | ||
| Sectio_01_12_00-Enviro_Special_Conditions_(2014_-_4_Dec).pdf | ||
| WD_2005_2543_______Rev_16_______07_25_2014.doc | DOC document | |
| Section_02_41_00_Special_Conditions_May_2010.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7
DD CHECKLIST FORM 1354
1. General Building Data.
Exterior Dimensions: SF: ........ (Main Bldg)
SF: ........ (Wings)
SF: ........ (Offsets)
No of Stories:
Dimensions of Covered Walkways/Corridors: ................................. Type of Construction:
Foundation:
Floors:
Exterior Walls:
Roof:
Utilities:
Water (Type and size of pipe):
Gas (Type and size of pipe):
Electric (Phase, voltage, wire):
Other Utility (Type, capacity, etc.):
DD FORM 1354 CHECKLIST
2. Installed Systems & Plants.
Category Nomenclature Unit Quantity Cost
- Fire Protection.
880-211 Closed Head Auto Sprinklers SF/HD 880-212 Open Head Deluge System SF/HD 880-216 Pre-action Sprinkler System SF/HD 880-217 AFFF PA Sprinkler System SF/HD 880-218 Hi-Expansion Foam System EA 880-221 Auto Fire Protection System SF/EA 880-222 Manual Fire Alarm System EA 880-231 CO2 Fire System EA 880-232 Foam Fire System EA 880-233 Other Fire System EA 880-234 Halon 1301 Fire System EA 880-235 Dry Chemical System EA 880-236 Foam System EA
- Security.
872-841 Security Alarm System EA
- Installed Plants.
890-124 A/C from Central Plant SF 890-126 A/C Window Units SF/TN 890-125 A/C Plant < 5 Tons SF/TN 890-121 A/C Plant 5 - 25 Tons TN 826-122 A/C Plant 25-100 Tons TN 826-123 A/C Plant > 100 Tons TN 821-115 Heating Plant 750-3500 MBh MB 821-116 Heating Plant Over 3500 MBh MB 811-147 Emergency Power Generator KW 124-xxx Fuel Tank for Heating/Generator GA (Type of Fuel: ................... )
3. Related Facilities.
116-xxx Pads (Type: ...................... ) SY 411-xxx Large Storage Tanks (Contents: ... ) BL 812-223 Pri Elec Distr - Overhead LF
- Transformers KVA
- Power Poles LF/EA 812-224 Sec Elec Distr - Overhead LF 812-225 Pri Elec Distr - Underground LF
- Transformers KVA 812-226 Sec Elec Distr - Underground LF 812-926 Exterior Area Lighting (Street/Park) EA 824-464 Gas Mains LF 831-169 Sewage Septic Tank KG 832-255 Industrial Waste Mains LF 832-266 Sanitary Sewer Mains LF 841-161 Water Supply Mains LF 842-245 Water Distr Mains LF 843-315 Fire Hydrants EA 851-143 Curbs & Gutters LF 851-145 Driveway SY 851-147 Road SY/LF 852-262 Vehicle Parking SY 852-289 Sidewalk SY 871-183 Storm Drains LF 872-247 Security Fence LF 872-248 Interior Fence LF 890-144 Compressed Air Distribution LF 890-158 Load/Unload Platform SF 890-187 Utility Vault SF 890-272 EMCS Field Equipment EA 890-273 EMCS Data Links LF 135-583 Telephone Duct LF 135-586 Telephone Pole LF
4. Additions to Existing Facilities.
Use checklists 1 - 3 above. Include any plants, systems, real property installed equipment or related facilities added, removed or replaced.
5. Alterations or Renovations to Existing Facilities.
Use checklists 1 - 3 above. Include plants, systems, real property installed equipment or related facilities added, removed or replaced. If demolition of existing facilities was a part of the project, include the specifics and costs related to the demolition.
6. Remarks.
Add any explanatory remarks or descriptions which more fully describe the items. At a minimum, this will include the cost, manufacturer, model, serial number, manufacturing date of each major piece of equipment including but not limited to: generator, HVAC unit, fire suppression or alarm panel.
7. When is the Contractor required to prepare and submit a DD Form 1354?
- Initial construction of a new facility
- Addition to an existing facility
- Demolition of an existing facility (and all its associated related real property)
- Removal of or upgrade to an installed system as defined in checklist 2.
- In general, if the project was funded in part or in whole with minor construction (EEIC 529) or MCP funds, a DD Form 1354 is required in or- der to transfer the completed construction to real property records.