MSA_Repair_Electrical_Amend_4.pdf

PDF 93 KB Posted

Attached to
JFSD970342 Repair Electric Lines - MSA/COMM Federal contract opportunity
Solicitation number
FA4659-13-R-0013
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment 4 MSA Repair Electrical

View the file

Other files for this federal contract opportunity

Other files attached to JFSD970342 Repair Electric Lines - MSA/COMM, newest first.
File Type Posted
26_56_00_LED_Update_31_Jul_13.pdf PDF
30_JFSD_0911_E-503_LED_31Jul13.pdf PDF
FA4659-13-R-0013-0006.pdf PDF
Updated_drawings_MSA_Repair_Electrical_Amend_4.pdf PDF
26_05_13_Update.pdf PDF
26_56_00_LED_Update_25_Jul_13.pdf PDF
26_12_00_Update.pdf PDF
Updated_Schedule_of_Drawings2.doc DOC document
FA4659-13-R-0013-0004_Amendment.pdf PDF
Updated_Schedule_of_Drawings.doc DOC document
FA4659-13-R-0013-0003_Repair_MSA_Electrical.pdf PDF
FA4659-13-R-0013-0003_Updated_Drawings.pdf PDF
Complete_Set_Updated_10_Jul_2013.pdf PDF
FA4659-13-R-0013-0002_Amendment.pdf PDF
Site_Visit_Sign_in_sheet.pdf PDF
JFSD970342_Specifications_Updated_10_JUL_13_Section_265600.pdf PDF
Updated_Schedule_of_Drawings.doc DOC document
FA4659-13-R-0013-0001_Amendment.pdf PDF
Attachment_7_Waiver_Green_Procurement_Form.doc DOC document
Attachment_3_JFSD970342_Drawings_Updated_22_May_2013.pdf PDF
Attachment_6_JFSD970342_Material_Submittal_Schedule.pdf PDF
Attachment_1_JFSD970342_Specifications_Updated_22_May_2013.pdf PDF
Solicitation_Cover_Letter_signed.pdf PDF
FA4659-13-R-0013_RFP.pdf PDF
Attachment_8_Financial_Institution_Reference_Sheet.doc DOC document
Attachment_5_-_Climatological_Data.pdf PDF
Attachment_4_General_Decision_Number_ND130014.pdf PDF
Attachment_2_Schedule_of_Drawings.doc DOC document
Attachment_9_-PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2A3E13128A002 JFSD970342

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment to FA4659-13-R-0013, JFSD970342 Repair Electric lines MSA/COMM is to update draw ings and to include answ ers to Request for Information (RFI):

A) Include questions and answ ers to the RFIs.

B) Remove/Replace attachment 2, Schedule of Draw ings w ith the attached Updated Schedule of Draw ings

C) Remove/Replace draw ings E-502,E-503, ED110, and ED111 w ith updated draw ings dated July 2013.

D)Remove/Replace section 26 56 00, Exterior Lighting, 26 05 13 Medium Voltage Cables,26 12 00 Medium Voltage Transformers, Construction Specif ications, Project No. JFSD970342 w ith the attached updated version of section 26 56 00, Exterior Lighting, 26 05 13

Medium Voltage Cables,26 12 00 Medium Voltage Transformers.

E) No other changes.

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-13-R-0013

X 9B. DATED (SEE ITEM 11)

26-Jun-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2013

CODE

319 CONTRACTING FLIGHT

575 TUSKEGEE AIRMEN BLVD

GRAND FORKS AFB ND 58205 6436

FA4659 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4659-13-R-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

Questions for JFSD970342 Repair MSA Electrical

1. Since the conduit size in detail #3 (E-502) changed to 4" PVC, couldn’t the concrete ductbank dimension change to 18" wide instead of 22" wide? It would save the government a lot of money to not pay for the extra concrete.

A: See updated drawing E-502.

2. Also, is there any rebar in the concrete? This is what we have seen for engineered ductbanks. But there may be a reason this duct does not contain rebar.

A: There is no rebar required for concrete encased ductbank, as indicated by the drawings.

3. E401 –This drawing shows a lot of boring under the parking lot. However, Note 6 says the bored ductbank will be according to the detail (#3 in E-502). We can’t bore and place all of the concrete under the parking lot without disturbing the lot surface. Where is the note for boring similar to the other pages that show boring?

A: Boring:High Density Polyethelene (HDPE) is acceptable for directional boring applications (roads and parking lot locations) when installed in compliance with

Engineering Technical Letter (ETL) 07-1, Unified Facilities Criteria (UFC) 3-550-01, and the National Electric Code. Sheet E-401 Note 6 reference to the detail refers to size and quantity of conduits only, this will need to be directionally bored.

4. E405 –Is note 1 in the center of the page referring to connection to the transformer to the SE of building #761?

A: Sheet E-405 Note 1 is referring to the tie in to the connection to the transformer on SE side of Bldg. 761, as shown in demolition drawing ED105.

5. One junction box in the upper left part of the drawing not called out or identified. Is this required or does it exist? Is it supposed to be detail #5 A: Sheet E-405 Jbox in upper left corner of the drawing should have same detail as the one next to it (Detail 5, E-502) as shown on the wiring diagram.

6. Where is Note 2 on the drawing page? It seems to indicate there is a new transformer somewhere. Is this new transformer required?

A: Sheet E-405 Note 2 is not used.

7. Detail 1, sheet E-502 points to two transformer symbols. Are these identical side-by-side transformers?(In reference to Sheet E-405 transformers) A: Side by side, yes, identical, no, see one-line diagram.

8. E408 -It looks like note 2 shows connection to a new transformer, so moving to Sheet 411 where it says it is an existing transformer. Please confirm that the transformer is existing and that note 2 on page E408 is in error?

A: Sheet E-408 Note 2 is referring to an existing transformer

9. Also, Is there really a new feed required to go to transformer # T749 on sheet E-411

(detail 4) or can the existing feeds remain in place as shown on ED 110?

A: Yes, new feeder is required, see updated drawing ED110. Will be fed from new distribution equipment for better coverage.

10. E409 -Where is note 5 on the drawing?

A: Sheet E-409 Note 5 is not used.

11. E412 - Note 1 is confusing. There are no existing lines/cables to extend to this transformer. Sheet ED111 shows everything in this area to be removed per note 7 on page ED111, yet note 4 on sheet ED111 says some underground are to remain. Which underground? Note 7 says they are removed.

A: See Updated Drawing ED111

12. Can you verify the finish required on the type A light poles for this project? Specification section 26 56 00 page 6 states the poles are to have a primed coat, a hot dipped galvanized coat and two coats of brown paint. The luminaires have a dark bronze finish so we are asking for a clarification on the finish for the poles. We think they want a pole with a primer coat and a dark bronze finish coat to match the luminaire but would like this clarified as the specification also lists a galvanized finish. Can you clarify the type of finish required on the type A poles for this project.

A: Finish is to be dark bronze finish coat. Specification section 26 25 00 has been updated.

13. Q: Sheet E405 note 7: What are we to supply for this note? Are we overriding a photo control in building 701 or are you trying to override the photo controls in all of the new type A fixtures? If this note pertains to the new type A fixtures, please advise how this is to be wired as each new type A fixture has an integral photo control in them.

A: See updated drawing E-503.

14. Q: Spec section 26-12-00 pad mounted transformers: Can you verify the color? The pad mounted switchgear is Munsell brown but the transformers do not have a color specified.

A: Color will be Munsell Brown.

15. Q: It has come to our attention that all of the existing underground electrical distribution that has been bored under roads and parking lots has utilized a schedule 80 PVC Bore Guard Conduit that is not installed in a steel casing nor encased in concrete. The specs call out for a Galvanized Rigid Steel Conduit under roads and parking lots, or where boring is used to install the conduit. The

Soli in Grand Forks has a High level of Alkalinity that will corrode any type of steal that is installed In the ground within a couple of years. We would like to utilize the same construction methods as used at the base in the past and described above.

A. Bore Guard Conduit or HDPE are acceptable.

Additional Changes

1. Reference Specification section 26 05 13, Medium Voltage Cables.

-Page 2, line 39 delete "ICEA S-93-639/NEMA WC 74 and ICEA S-97-682" and insert

"ICEA S-94-649"

-Page 2, line 49 delete "Shielding: Copper tape, helically applied over semiconducting insulation shield."

-Page 3, line 5 add the following paragraph and sub paragraphs.

Solid terminations

A. Shielded Cable Terminations: Comply with the following classes of IEEE 48. Insulation class is equivalent to that of the cable.

Include shield ground strap for shielded cables.

1. Class 1 Terminators: Modular type, furnished as a kit, with stress-relief tube; multiple, molded-silicone rubber, insulator modules; shield ground strap; and compression type connector.

2. Class 1 Terminators: Heat-shrink type with heat-shrink inner stress control and outer nontracking tubes; multiple, molded, nontracking skirt modules;and compression type connector.

3. Class 1 terminators: Modular type, furnished as a kit, with stress relief shield terminator; Multiple-wet-process, porcelain modules:shield ground strap; and compression type connector.

-Page 5, lines 9 and 10 delete " Ground shields of shielded cable at one point only.

Maintain shield continuity and connections to metal connections and hardware at all connection points."

2. Reference Sheet E505 and specification section 26 12 00 Medium Voltage Transformers.

- Page 1, line 13 delete "the following types of transformers with medium-voltage primaries:" and insert " Three Phase transformers with 12,470 volt primaries and Single Phase transformers with 7,200 volt primaries."

(End of Summary of Changes)