Attachment_6_JFSD970342_Material_Submittal_Schedule.pdf

PDF 77 KB Posted

Attached to
JFSD970342 Repair Electric Lines - MSA/COMM Federal contract opportunity
Solicitation number
FA4659-13-R-0013
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 6 JFSD970342 Material Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to JFSD970342 Repair Electric Lines - MSA/COMM, newest first.
File Type Posted
26_56_00_LED_Update_31_Jul_13.pdf PDF
30_JFSD_0911_E-503_LED_31Jul13.pdf PDF
FA4659-13-R-0013-0006.pdf PDF
Updated_drawings_MSA_Repair_Electrical_Amend_4.pdf PDF
26_05_13_Update.pdf PDF
26_56_00_LED_Update_25_Jul_13.pdf PDF
26_12_00_Update.pdf PDF
Updated_Schedule_of_Drawings2.doc DOC document
MSA_Repair_Electrical_Amend_4.pdf PDF
FA4659-13-R-0013-0004_Amendment.pdf PDF
Updated_Schedule_of_Drawings.doc DOC document
FA4659-13-R-0013-0003_Repair_MSA_Electrical.pdf PDF
FA4659-13-R-0013-0003_Updated_Drawings.pdf PDF
Complete_Set_Updated_10_Jul_2013.pdf PDF
FA4659-13-R-0013-0002_Amendment.pdf PDF
Site_Visit_Sign_in_sheet.pdf PDF
JFSD970342_Specifications_Updated_10_JUL_13_Section_265600.pdf PDF
Updated_Schedule_of_Drawings.doc DOC document
FA4659-13-R-0013-0001_Amendment.pdf PDF
Attachment_7_Waiver_Green_Procurement_Form.doc DOC document
Attachment_3_JFSD970342_Drawings_Updated_22_May_2013.pdf PDF
Attachment_1_JFSD970342_Specifications_Updated_22_May_2013.pdf PDF
Solicitation_Cover_Letter_signed.pdf PDF
FA4659-13-R-0013_RFP.pdf PDF
Attachment_8_Financial_Institution_Reference_Sheet.doc DOC document
Attachment_5_-_Climatological_Data.pdf PDF
Attachment_4_General_Decision_Number_ND130014.pdf PDF
Attachment_2_Schedule_of_Drawings.doc DOC document
Attachment_9_-PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

156-011 01000-1

PROJECT NO.

JFSD

970342

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1 4

4 Project Site Plan. Sec. 01000, Para. 7.2.1 4

5 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4

6 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4

7 Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 10.1.2

8 Site Conditions Photographs. Sec. 01000, Para. 12.5 4

9 Construction Schedule. Sec. 01000, Para. 12.6 4

10 Schedule Showing Procurement Plans for Materials and Equipment.

Sec. 01000, Para. 12.6.2.1

11 Exterior Utility System Drawings. Sec. 01000, Para. 12.7.2.1 1

12 Final As-Built Drawings. Sec. 01000, Para. 12.8 1

13 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 4

14 Environmental Pollution Control Plans. Sec. 01000, Para. 13.3.1 4

15 Storm Water Protection Plan. Sec. 01000, Para. 13.5 4

16 Waste Disposal Plan. Sec. 01000, Para. 13.6 4

17 Dust Control Plan. Sec. 01000, Para. 13.7 4

18 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4

19 Spill Control Plan. Sec. 01000, Para. 13.12 4

20 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4

21 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4

22 O & M Manuals. Sec. 01000, Para. 16 3

23 Sec. 01000, Affirmative Procurement Report Form 4

24 Concrete Mix Design 03 30 00 4

25 Medium Voltage Cables 26 05 13 4 4 4 4 4

26 Low Voltage Electrical Power Conductors 26 05 19 4 4

27 Grounding and Bonding for Electrical Systems 26 05 26 4 4

28 Underground Ducts and Raceways 26 05 43 4 4

29 Identification Sec. 26 05 53 4 4

30 Medium Voltage Transformers Sec. 26 12 00 4 4

31 Medium Voltage Switchgear Sec. 26 13 00 4 4 4

32 Surge Protection Sec. 26 43 13 4 4 4

33 Exterior Lighting Sec. 26 56 00 4 4

34 Overhead Medium Voltage Wiring Sec. 33 71 49.13 4 4 4

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D

A

TA

C E

R

TI

FI

C

A

TE

S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

LI

N E

N U

M B

E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

SCHEDULE OF MATERIAL SUBMITTALS

Y\156_010\DOCUMENTS\SPECS\01000 PART 2.xls NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

REPAIR (R/M) ELECTRIC LINES - MSA/COMM

SQ AREAS - GRAND FORKS AFB, ND

Sheet1

File details come from the government source that posted it. Updated .