FA4659-13-R-0013-0003_Repair_MSA_Electrical.pdf

PDF 162 KB Posted

Attached to
JFSD970342 Repair Electric Lines - MSA/COMM Federal contract opportunity
Solicitation number
FA4659-13-R-0013
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment 3 to FA4659-13-R-0013

View the file

Other files for this federal contract opportunity

Other files attached to JFSD970342 Repair Electric Lines - MSA/COMM, newest first.
File Type Posted
26_56_00_LED_Update_31_Jul_13.pdf PDF
FA4659-13-R-0013-0006.pdf PDF
30_JFSD_0911_E-503_LED_31Jul13.pdf PDF
26_56_00_LED_Update_25_Jul_13.pdf PDF
26_12_00_Update.pdf PDF
Updated_Schedule_of_Drawings2.doc DOC document
MSA_Repair_Electrical_Amend_4.pdf PDF
Updated_drawings_MSA_Repair_Electrical_Amend_4.pdf PDF
26_05_13_Update.pdf PDF
FA4659-13-R-0013-0004_Amendment.pdf PDF
FA4659-13-R-0013-0003_Updated_Drawings.pdf PDF
Updated_Schedule_of_Drawings.doc DOC document
FA4659-13-R-0013-0002_Amendment.pdf PDF
JFSD970342_Specifications_Updated_10_JUL_13_Section_265600.pdf PDF
Updated_Schedule_of_Drawings.doc DOC document
Site_Visit_Sign_in_sheet.pdf PDF
Complete_Set_Updated_10_Jul_2013.pdf PDF
FA4659-13-R-0013-0001_Amendment.pdf PDF
Attachment_1_JFSD970342_Specifications_Updated_22_May_2013.pdf PDF
Solicitation_Cover_Letter_signed.pdf PDF
FA4659-13-R-0013_RFP.pdf PDF
Attachment_5_-_Climatological_Data.pdf PDF
Attachment_4_General_Decision_Number_ND130014.pdf PDF
Attachment_2_Schedule_of_Drawings.doc DOC document
Attachment_9_-PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Attachment_8_Financial_Institution_Reference_Sheet.doc DOC document
Attachment_7_Waiver_Green_Procurement_Form.doc DOC document
Attachment_3_JFSD970342_Drawings_Updated_22_May_2013.pdf PDF
Attachment_6_JFSD970342_Material_Submittal_Schedule.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2A3E13128A002 JFSD970342

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment to FA4659-13-R-0013, JFSD970342 Repair Electric lines MSA/COMM is to update draw ings and to include answ ers to site visit:

A) Remove/Replace attachment 2, Schedule of Draw ings w ith the attached Updated Schedule of Draw ings

B) Remove/Replace draw ings E-502 Dated 24 Feb 12,E-505 Dated Jul 13,E-412 Dated May 13, and ED109 dated Dec 12 in attachment 3 w ith updated draw ings dated July 2013.

C) Include questions and answ ers from the site visit.

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jul-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-13-R-0013

X 9B. DATED (SEE ITEM 11)

26-Jun-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2013

CODE

319 CONTRACTING FLIGHT

575 TUSKEGEE AIRMEN BLVD

GRAND FORKS AFB ND 58205 6436

FA4659 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4659-13-R-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

1. Answers to Request for Information (RFI)

a. Sheet E-409, Note 2, it states that transformer T729, 500 KVA, is to remain. Sheet ED-109, note 7 ,it states to remove and dispose of T729. Also, T729 is not shown on the one line diagram on sheet E-

505. What do we do with T729?

Answer: T729 is to remain; drawings ED109 and E-505 have been updated to reflect this change.

b. Sheet E-412 ,a four point junction is shown, (6/E-502) that feeds the transformer for building

710. Sheet E-505, one line diagram, shows a 3 point junction feeding the 25 KVA transformer for building 710. Three point or four point junction? I believe only a three point is needed.

Answer: Three point junction, drawings E-412 has been updated to reflect this change.

c. Sheet E-502, detail 3/E-502 shows a 6 inch sch 20 pvc conduit. In my 30 years doing construction at the GFAFB, I have never installed 6” pvc. I believe it is over designed. Please review size.

Answer: 4 inch is acceptable, drawings E-502 has been updated to reflect this change.

d. Detail 7/E-502 on sheet E-502, should be 1 -1/0 solid aluminum for single phase wiring versus the stated 3- 1/0 solid aluminum conductors.

Answer: This is correct, 1 -1/0 solid aluminum single phase wiring should be used. Drawing E-502 has been updated to reflect this change.

2. Proposal due date remains unchanged.

(End of Summary of Changes)