MATERIAL SUBMITTAL SCHEDULE
PROJECT NO: JFSD200800
Project Title: REPAIR, INSTALL VALVES/HYDRANT-WATER TOWER 123 (R/M)
NOTE: Submittals required by specifications and/or drawings shall be made, regardless of whether or not they are listed below
I T E M
SECTION
AND
PARAGRAPH
NUMBER
ITEM
P R O O F
C
M P L I A N
R O C E D U
S H
D
A W I N G
A
R T I F I C A T
P O
U A R A N T E
M P L
C E I V
P R O V E D
1 Section 01000, 3.3 Warranty x x
2 Section 01000, 4.0 AF Form 103, Work Clearance Permit x
3 Section 01000, 5.0 Utility Outage Request x
4 Section 01000, 8.2.1 Site Plan x
5 Section 01000, 8.2.2 & 14.8
Dirt and Dust Control Plan x
6 Section 01000, 8.2.3 Health and Safety Plan
7 Section 01000, 11.1.1
Subcontractor and Personnel List x
8 Section 01000, 11.1.2
Superintendent Designation Letter x
9 Section 01000, 12.1 Equipment List/Warranty Information x x x
10 Section 01000, 13.5 Photographs x
11 Section 01000, 13.6 Project Schedules x
12 Section 01000, 13.7.1
Redline Markup Drawings x
13 Section 01000, 13.8 Final Asbuilts x
14 Section 01000, 13.9 Real Property Records, Form DD1354 x
15 Section 01000, 14.4 Preconstruction Survey x
16 Section 01000, 14.5 & 14.13
Storm Water Protection Plan/ Erosion and Sediment Control Plan x x
17 Section 01000, 14.8 Waste Disposal Plan x
18 Section 01000, 14.9 Salvageable Materials x
19 Section 01000 14.13 Radioactive Materials x x x x
MATERIAL SUBMITTAL SCHEDULE CONT.
NOTE: Submittals required by specifications and/or drawings shall be made, regardless of whether or not they are
R O
M P L I A N
O C E D U
A W I N
R T I F I C A T
P O
A R A N T E
M P L
C E I V
P R O V E D
21 Section 01000, 14.14 Spill Control Plan x
22 Section 01000, 15.0 Contractor Quality Control Plan x
23 Section 01000, 17.0 Operation and Maintenance Manuals
24 EPCRA Reporting x
25 Section 01000, 2.2.1 Interior Cathodic Protection System Design x x x x x
26 Section 01000, 2.2.2 Cathodic Proection System Components x x x
27 SECTION 02 82
33.13 20, SD-06
Test Reports x
28 SECTION 02 82
33.13 20, SD-07
SD-07 Certificates x x
SECTION 02 82
33.13 20, SD-11
Closeout Submittals x x
30 SECTION 05 05 23,
SD-05
Product Data x x x
31 SECTION 05 05 23,
SD-06
Test Reports x
32 SECTION 09 97
13.16, SD-05
Design Data x x x
33 SECTION 09 97
13.16, SD-06
Test Reports x
34 SECTION 09 97
13.16, SD-07
Certificates x x x
35 SECTION 09 97
13.16, SD-11
Close-out Submittals x x x x
36 SECTION 09 97
13.27, SD-05
Design Data x x x
37 SECTION 09 97
13.27, SD-06
Test Reports x
MATERIAL SUBMITTAL SCHEDULE CONT.
NOTE: Submittals required by specifications and/or drawings shall be made, regardless of whether or not they are
R O
M P L I A N
O C E D U
A W I N
R T I F I C A T
P O
A R A N T E
M P L
C E I V
P R O V E D
38 SECTION 09 97
13.27, SD-07
Certificates x x x
39 SECTION 09 97
13.27, SD-11
Close-out Submittals x x x x
40 SECTION 31 00 00,
SD-06
Test Reports x
41 SECTION 31 00 00,
SD-07
Certificates x
42 SECTION 31 23
00.00 20, SD-06
Test Reports x
43 SECTION 32 92 23,
SD-07
Certificates x
44 SECTION 32 92 23,
SD-08
Warranty x
45 SECTION 33 11 00,
SD-03
Product Data x x x x
46 SECTION 33 11 00,
SD-06
Test Reports x
47 SECTION 33 11 00,
SD-07
Certificates x