MAF_Water_Wells_Response_to_Questions_IV.docx

DOCX document 15 KB Posted

Attached to
MAF Water Wells Federal contract opportunity
Solicitation number
FA4626-16-R-0032
Issued by
Department of the Air Force Global Strike Command

About this file

Response to Questions IV

View the file

Other files for this federal contract opportunity

Other files attached to MAF Water Wells, newest first.
File Type Posted
MAF_Water_Wells_Response_to_Questions_V.docx DOCX document
MAF_Water_Wells_Response_to_Questions_III.pdf PDF
Mike-_01_Electrical_Upgrade_project_(20).JPG JPG image
DSCN0333.JPG JPG image
DSCN0452.JPG JPG image
DSCN0035.jpg JPG image
MAF_Water_Wells_Response_to_Questions_II.docx DOCX document
MAF_Water_Wells_Response_to_Questions.docx DOCX document
Repair_MAF_Water_Wells_Bore_Data.xlsx XLSX spreadsheet
Water_Wells_Site_Map_&_Topos.pdf PDF
Pumphouse_portfolio.pdf PDF
electrical_panel_pics.pdf PDF
Site_Visit_Minutes_and_attendace_sheet.pdf PDF
03_30_00_Cast_In_Place_Concrete.docx DOCX document
solicitation_questions.docx DOCX document
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_5_Wage_Determination.docx DOCX document
Attach_2_Submittal_Schedule.xlsx XLSX spreadsheet
Attach_4_Drawings.pdf PDF
Solicitation.docx DOCX document
Attach_3_SCHEDULE_OF_DRAWINGS.docx DOCX document
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_1_Specifications.zip ZIP file
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attch_9_Subcontractor_Consent.doc DOC document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAF Water Wells Response to Questions IV

8 March 2017

Q. In volume III it limits us to 2 pages per citation; however the PPQ (attachment 8 of the solicitation) provided is 6 pages for each project. May we provide the entire PPQ in volume III for each of the potential 10 projects?

A: Yes, provide the entire PPQ

Q. The completion depth for each well appears to be determined in the SOW. However, in reviewing the current information on the wells in the DNRC files, it appears that upper water-bearing zones were drilled through and the wells completed in much deeper water bearing zones. If an upper water-bearing zone is suitable for development, will the client prefer completion at the upper zone or do you still want well completion at the deeper zone identified in the SOW?

A. Drill to the specified depth.

Q. Information available in the DNRC files indicates that current production for these wells are in the range of 2 gallons per minute (gpm).

a. Based on your knowledge of the site, is this an accurate measurement of flow rates?

A. Yes

b. The SOW calls for a step test, with 4 steps and with a pumping rate variation not to exceed 5%. This equates to a variation of 0.1 gpm. This variation will be difficult to maintain in the field. Are there other standards we should be looking at?

A. If the contractor completes the well to the specifications given, and an indistinguishable variation in flowrate exists, Missile Engineering will determine if issue is waivable on a case by case basis.

Q. Logged information in the file named “Repair MAF Water Wells Bore Data.xlsx” posted on March 3, 2017, does not match with the reported total depths in Section 33 21 00 of the Project Specifications. Please explain.

A. That Excel file is the bore logs from the original MAF construction, it has no connection to the current wells on site.

Q. The SOW does not identify the need for aquifer testing analysis, such as determination of transmissivity, storativity, or hydraulic conductivity. Is this correct?

A. This is correct.