Attach_2_Submittal_Schedule.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
MAF Water Wells Federal contract opportunity
Solicitation number
FA4626-16-R-0032
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 Submittal

View the file

Other files for this federal contract opportunity

Other files attached to MAF Water Wells, newest first.
File Type Posted
MAF_Water_Wells_Response_to_Questions_V.docx DOCX document
MAF_Water_Wells_Response_to_Questions_IV.docx DOCX document
MAF_Water_Wells_Response_to_Questions_III.pdf PDF
Mike-_01_Electrical_Upgrade_project_(20).JPG JPG image
DSCN0333.JPG JPG image
DSCN0452.JPG JPG image
DSCN0035.jpg JPG image
MAF_Water_Wells_Response_to_Questions_II.docx DOCX document
MAF_Water_Wells_Response_to_Questions.docx DOCX document
Repair_MAF_Water_Wells_Bore_Data.xlsx XLSX spreadsheet
Water_Wells_Site_Map_&_Topos.pdf PDF
Pumphouse_portfolio.pdf PDF
electrical_panel_pics.pdf PDF
Site_Visit_Minutes_and_attendace_sheet.pdf PDF
03_30_00_Cast_In_Place_Concrete.docx DOCX document
solicitation_questions.docx DOCX document
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_5_Wage_Determination.docx DOCX document
Attach_4_Drawings.pdf PDF
Solicitation.docx DOCX document
Attach_3_SCHEDULE_OF_DRAWINGS.docx DOCX document
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_1_Specifications.zip ZIP file
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attch_9_Subcontractor_Consent.doc DOC document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 15-6000Repair MAF Water WellsFA4626-16-R-0032
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
101 00 00 General Requirements - 3.3 Schedule of Materials Submittal10 d - ANP
201 00 00 General Requirements - 3.4.1 Manufacturer's Product Brochures & Catalog Data, Components and Materials to be Installed430d -PTSW
301 00 00 General Requirements - 3.8.1 Start of Work Notification35 d - PTE
401 00 00 General Requirements - 3.11 Utility Outages310d - PTE
501 00 00 General Requirements - 3.13 Quality Control Plan and Specified Quality Control Submittals310d - ANP
601 00 00 General Requirements - 3.16 As-Built Field Data330d - AFI
701 00 00 General Requirements - 3.16.4 &3.16.5 As-Built Field Drawings430d - AFI2 - CD's w/ AutoCAD files, PDF's, & Drawings
801 00 00 General Requirements - 3.17 O&M Instructions/Manual121d - ATT1 hardcopy, 2 CD's
901 00 00 General Requirements - 3.23 AF Form 10314d - PTSWAF Form 103 Work Clearance
1001 00 00 General Requirements - 3.23.1 Tape330d - PTSW
1101 00 00 General Requirements - 3.26 Nuclear Densometers330d - PTSW
1201 00 00 General Requirements - 3.28 Notice of Final Inspection314d - PTERed line “As-Built” dwgs shall be provided by the Contractor at final inspection.
1301 00 10 Site Security - 1.3 Contractor Entry Authorization List (CEAL)314d - PTSWEAL
1401 36 00 Environmental Protection - 1.2.2 Copies of Environmental Permits35d - PTSW
1501 36 00 Environmental Protection - 1.11.6 Waste Management Plan310d - PTFI
DIVISION 03 - CONCRETE
1603 30 00 Cast-in-Place Concrete - 1.2A Shop Drawings30d - PTSW
1703 30 00 Cast-in-Place Concrete - 1.2B Concrete Mix Design Data30d - PTSW
183 30 00 Cast-in-Place Concrete - 1.2C Test Reports7d & 28d - ATT
193 30 00 Cast-in-Place Concrete - 1.2A Certificates30d - PTSW
DIVISION 05 - METALS
2005 05 23 Metal Fastenings - 1.1 Performance Qualifications of Welders and Welding Officers330d - PTSW
2105 05 23 Metal Fastenings - 1.1 Welder's Certificates330d - PTSW
2205 05 23 Metal Fastenings - 2.1 Electrodes Product Data330d - PTSW
DIVISION 09 - PAINT
2309 90 00 Paints and Coatings - 1.2 Shop Drawings330d -PTSW
2409 90 00 Paints and Coatings - 1.2 Product Certification330d - PTSW
259 90 00 Paints and Coatings - 1.2 Product Materials330d -PTSW
269 90 00 Paints and Coatings - 1.2 Manufacturer Tech Sheet330d -PTSW
279 90 00 Paints and Coatings - 1.2 Color Samples330d -PTSW
289 90 00 Paints and Coatings - 1.2 Application Instructions330d -PTSW
299 90 00 Paints and Coatings - 1.2 Manufacturer's Safety Data Sheets330d -PTSW
309 90 00 Paints and Coatings - 1.2 Closeout Submittals330d - AFI
3109 90 00 Paints and Coatings - 1.3 Qualifications Data330d -PTSW
DIVISION 22 - PLUMBING
3222 05 53 Identification for Plumbing Piping and Equipment - 1.2 Pipe Label Samples for Color, Letter Style, and Graphite Representation330d - PTSW
3322 05 53 Identification for Plumbing Piping and Equipment - 2.1 Pipe Label Product Data330d - PTSW
DIVISION 26 - ELECTRICAL
3426 05 19 Product Data - 1.3.A.315d ANP
3526 05 26 Product Data - 1.3.A315d ANP
3626 05 26 Testing Results - 1.3.B and 3.3.A.33d ATT
3726 05 33 Product Data - 1.4.A315d ANP
3826 05 53 Product Data - 1.3.A.315d ANP
3926 29 13 Product Data - 1.3.A.333315d ANP
4026 29 13 Shop Drawings - 1.3.A.1. Tabulations of installed devices, equipment features, and ratings3315d ANP
4126 29 13 Shop Drawings - 1.3.A.2. Wiring Diagrams3315d ANP
4226 29 13 O&M Manuals - 1.3.C.1. Maintenance Requirements3315d ANP
4326 29 13 O&M Manuals - 1.3.C.2. Instructions for testing and adjusting circuit breaker and MCP trip settings315d ANP
4426 29 13 O&M Manuals - 1.3.C.3. Instructions for setting field-adjustable overload relays315d ANP
4526 29 13 O&M Manuals - 1.3.C.4. Instructions for testing, adjusting, and reprogramming reduced-voltage solid-state controllers315d ANP
4626 29 13 Demonstration - 3.8.A. Training for Government maintenance personnel for testing, adjusting, and programming reduced-voltage solid-state controllers1PTFI
DIVISION 31 - EARTHWORK
4731 00 00 Earthwork - 2.1 Borrow Material330d - PTSW
4831 00 00 Earthwork - 2.2 Backfill330d - PTSW
4931 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 1.2 Excavator Model to be Used330d - PTSW
5031 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 1.3 Test Results for Pipe Bedding Sieve and Proctor, Pipe Bedding Compaction, Type A Trench Backfill Compaction, Type B Trench Backfill Compaction, and Controlled Low Strength Material31d - ATT
5131 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 1.5 Written Statement of Method of Maintenance330d - PTSW
5231 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 1.8 A. Utility Notices310d - PTSW
5331 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 2.1 Type I Bedding Material Product Data330d - PTSW
5431 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 2.2 Type II Bedding Material Product Data330d - PTSW
5531 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 2.3 B. Compressive Strength Test Results31d - ATT
5631 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 2.3 C. Mix Design330d - PTSW
5731 23 33 Trench Excavaton and Backfill for Pipelines and Appurtenant Structures - 2.4 Plastic Marking Tape330d - PTSW
5831 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 3.3 H. Written Permission for Off-Site Disposal from Owner of Property upon which Material is to be Disposed37d - PTSW
DIVISION 32 - EXTERIOR IMPROVEMENTS
5932 92 19 Seeding - 2.1.1 Certificate of Composition and Weed-Free Certification330d - PTSW
6032 92 19 Seeding - 2.2 Topsoil330d - PTSW
6132 92 19 Seeding - 2.3 Fertilizer330d - PTSW
6232 92 19 Seeding - 3.3 Warranty330d - PTSW
DIVISION 33 - UTILITIES
6333 11 16 Polyethylene Pipe and Fittings for Water - 2.1 A Polyethylene Compounds330d - PTSW
6433 11 16 Polyethylene Pipe and Fittings for Water - 2.1 B Pipe System Components330d - PTSW
6533 11 16 Polyethylene Pipe and Fittings for Water - 2.3 Fittings330d - PTSW
6633 11 16 Fiberglass Pipe Insulation - 2.7.A330d - PTSW
6733 11 16 Closed Cell Foam Insulation- 2.7.B330d - PTSW
6833 21 00 Water Supply Wells - 1.2 All Necessary Permits and Certificates337d - PTSW
6833 21 00 Water Supply Wells - 1.4 Well Report360d - ATT
6933 21 00 Water Supply Wells - 1.7 Documentation of Competance330d - PTSW
7033 21 00 Water Supply Wells - 1.12 A. Drawings, Diagrams, Etc.3330d - PTSW
7133 21 00 Water Supply Wells - 1.12 B. Name of Laboratory Used for Water Sample Analysis330d - PTSW
7233 21 00 Water Supply Wells - 1.12 D. Manufacturer's Certificates330d - PTSW
7333 21 00 Water Supply Wells - 1.12 F Closeout Submittals330d - AFI
7433 21 00 Water Supply Wells - 2.1 Drilling Fluids Product Data330d - PTSW
7533 21 00 Water Supply Wells - Drilling Equipment Product Data330d - PTSW
7633 21 00 Water Supply Wells - 2.2 Well Casing Product Data330d - PTSW
7733 21 00 Water Supply Wells - 2.3 Conductor Pipe Product Data330d - PTSW
7833 21 00 Water Supply Wells - 2.4 Well Screen Product Data330d - PTSW
7933 21 00 Water Supply Wells - 2.5 Sealing Grout Product Data330d - PTSW
8033 21 00 Water Supply Wells - 2.6 Well Pump Product Data330d - PTSW
8133 21 00 Water Supply Wells - 2.7 Pitless Adaptor Unit Product Data330d - PTSW
8233 21 16 Water Supply Wells - 2.8 Well Cap Product Data330d - PTSW
8333 21 16 Water Supply Wells - 2.9 Drop Pipe Product Data330d - PTSW
8433 21 16 Water Supply Wells - 2.10 Check Valves Product Data330d - PTSW
8533 21 16 Water Supply Wells - 2.11 Torque Arrestor Product Data330d - PTSW
8633 21 16 Water Supply Wells - 2.12 Coupler Product Data330d - PTSW
8733 21 00 Water Supply Wells - 2.13 Gas Extraction System Product Data330d - PTSW
8833 21 00 Water Supply Wells - 3.3 Borehole Log330d - AFI
8933 21 00 Water Supply Wells - 3.4 Certified Test Results360d - ATT
9033 21 00 Water Supply Wells - 3.5 Well Logs330d - AFI
9133 21 00 Water Supply Wells - 3.6 Rate of Penetration Log330d - AFI
9233 21 00 Water Supply Wells - 3.7 Geophysical Log330d - AFI
9333 21 00 Water Supply Wells - 3.8 Stratigraphic Log330d - AFI
9433 21 00 Water Supply Wells - 3.14 Video Inspection330d - AFI
9533 21 00 Water Supply Wells - 3.15 Well Development Records330d - AFI
9633 21 00 Water Supply Wells - 3.16 Performance Testing Records and Reports330d - AFI
9633 29 00 Well Abandonment - 1.1 Well Abandonment Log330d - AFIOne for Each location
9733 29 00 Well Abandonment - 1.2 Well Abandonment Plan330d PTSW
Schedule of Abbreviations:
AFI =After Final InspectionPTE= Prior to Event
ANP=After Notice to ProceedPTFI= Prior to Final Inspection
ATT=After Test TakenPTSW = Prior to Start of Work
BBCW=Before Beginning Concrete Work
BD=Before Delivery

&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA &"Times New Roman,Regular"&12

&"Times New Roman,Regular"&12AF Form 66 &F-&D &"Times New Roman,Regular"&12 01330a-&P

REQUIRED TECHNICAL SUBMITTALS