Response_to_Questions__2.docx
DOCX document 13 KB Posted
- Attached to
- Remodel Repair Jolly Pad Federal contract opportunity
- Solicitation number
- FA4626-16-R-0028
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response_to_Questions__3_(12vdc_Cable).docx | DOCX document | |
| Appendix_E_-_Asbestos_LBP_Report.pdf | ||
| Amendment__2.pdf | ||
| Addendum__2.docx | DOCX document | |
| Addendum__2.docx | DOCX document | |
| Response_to_Questions.docx | DOCX document | |
| Questions_and_Answers.docx | DOCX document | |
| E3.0_Revision_1.pdf | ||
| Addendum__1.docx | DOCX document | |
| Amendment_001.doc | DOC document | |
| Pre-Proposal_Conference_-_Site_Visit.pdf | ||
| Pre-Proposal_Meeting_Attendees.pdf | ||
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_3_SCHEDULE_OF_DRAWINGS.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire_-_working.docx | DOCX document | |
| Attach_6_Base_Entry.pdf | ||
| Attach_4_Drawings.zip | ZIP file | |
| Attach_2_Material_Submittal.xls | XLS spreadsheet | |
| Attach_1_Specifications.zip | ZIP file | |
| Solicitation.doc | DOC document | |
| Attach_5_Wage_Determination.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS FOR FA4626-16-R-0028
REPAIR RHS JOLLY PAD
1. Specification section 32 17 23 – Pavement Markings – Paragraph 3.2 requires a machine to sprayeach line completely in a single pass. The restricted area has 2’ wide sections. Spraying in a single pass will require incredible specialty equipment that we have not found in Montana. Are multiple passes acceptable when painting this area? The final product will meet or exceed Malmstrom QA/QC requirements.
· Multiple passes will be allowed to accommodate the extreme width in this area and the helipad itself as long as the requirements of the specs and drawings are met.
2. Please provide lead paint inspection report as referenced in the specification.
· The lead-based paint report is attached.