Amendment_001.doc

DOC document 41 KB Posted

Attached to
Remodel Repair Jolly Pad Federal contract opportunity
Solicitation number
FA4626-16-R-0028
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Remodel Repair Jolly Pad, newest first.
File Type Posted
Response_to_Questions__3_(12vdc_Cable).docx DOCX document
Response_to_Questions__2.docx DOCX document
Appendix_E_-_Asbestos_LBP_Report.pdf PDF
Addendum__2.docx DOCX document
Amendment__2.pdf PDF
Addendum__2.docx DOCX document
Response_to_Questions.docx DOCX document
Questions_and_Answers.docx DOCX document
E3.0_Revision_1.pdf PDF
Addendum__1.docx DOCX document
Pre-Proposal_Conference_-_Site_Visit.pdf PDF
Pre-Proposal_Meeting_Attendees.pdf PDF
Attch_9_Subcontractor_Consent.doc DOC document
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_3_SCHEDULE_OF_DRAWINGS.doc DOC document
Attach_5_Wage_Determination.docx DOCX document
Attch_8_Past_Performance_Questionaire_-_working.docx DOCX document
Attach_6_Base_Entry.pdf PDF
Attach_4_Drawings.zip ZIP file
Attach_2_Material_Submittal.xls XLS spreadsheet
Attach_1_Specifications.zip ZIP file
Solicitation.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

Attach 1 Technical Specifications, Repair Jolly Pad, Malmstrom AFB, MT, Project Number NZAS 14-0102, Dated 5 October 2016, Cover Page, Section 010000-1 thru Section 34 71 13-2.

Attach 2 Material Submittal Schedule pages 1 thru 34 71 13-2 Attach 3 Schedule of Drawings

Attach 4 Drawings Sheet CVR thru E3.0 E3.0 Rev 1 Attach 5 Wage Determination, Heavy, MT160067, Dated 16 September 2016;

Attach 6 Installation Access Policy

Attach 7

Special Contract Requirements

Attach 8

Past Performance Questionaire

Attach 9

Sub-Contractor Release

(End of Summary of Changes)