Attach 2 Material Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response_to_Questions__3_(12vdc_Cable).docx | DOCX document | |
| Appendix_E_-_Asbestos_LBP_Report.pdf | ||
| Response_to_Questions__2.docx | DOCX document | |
| Amendment__2.pdf | ||
| Addendum__2.docx | DOCX document | |
| Addendum__2.docx | DOCX document | |
| Response_to_Questions.docx | DOCX document | |
| Questions_and_Answers.docx | DOCX document | |
| Amendment_001.doc | DOC document | |
| E3.0_Revision_1.pdf | ||
| Addendum__1.docx | DOCX document | |
| Pre-Proposal_Meeting_Attendees.pdf | ||
| Pre-Proposal_Conference_-_Site_Visit.pdf | ||
| Solicitation.doc | DOC document | |
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_3_SCHEDULE_OF_DRAWINGS.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire_-_working.docx | DOCX document | |
| Attach_6_Base_Entry.pdf | ||
| Attach_4_Drawings.zip | ZIP file | |
| Attach_1_Specifications.zip | ZIP file | |
| Attach_5_Wage_Determination.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 14-0102 | Repair Jolly Pad | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST REPORTS | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||||||
| 1 | 01 00 00 General Requirements - 3.5 B. As-Built Field Data | 2 | 3d - PFI | ||||||||||||||||||
| 2 | 01 00 00 General Requirements - 3.5 F. As-Built Field Data | 1 | 30 d - AFI | AutoCAD CD | |||||||||||||||||
| 3 | 01 00 00 General Requirements - 3.7 A. O&M Instructions | 1 | 2 | 1d - ATT | 1 hardcopy, 2 CD's - see individual sections as well | ||||||||||||||||
| 4 | 01 00 00 General Requirements - 3.8 A. Contractor Furnished Equipment Data | 10d - BD | Equipment List & Guarantees | ||||||||||||||||||
| 5 | 01 00 00 General Requirements - 3.11 A. Start of Work notification | X | 5 d - PTE | ||||||||||||||||||
| 6 | 01 00 00 General Requirements - 3.12 A. Notice of Pre-Final Inspection | X | 14d - PTE | ||||||||||||||||||
| 7 | 01 00 00 General Requirements - 3.12 A. Notice of Final Inspection | X | 14d - PTE | Red line “As-Built” dwgs shall be provided by the Contractor at final inspection. | |||||||||||||||||
| 8 | 01 00 00 General Requirements - 3.13 A. Construction Near Utilities | 5d - PSW | AF Form 103 Work Clearance | ||||||||||||||||||
| 9 | 01 00 00 General Requirements - 3.14 A. Utility Outages | X | 14 d - PSW | ||||||||||||||||||
| 10 | 01 00 00 General Requirements - 3.18 B. QC Submittals | 3 | 10d - ANP | Quality Control Plan | |||||||||||||||||
| 11 | 01 00 00 General Requirements - 3.20 A. 1354 checklist | 1 | 10d - PFI | Checklist to be delivered to the contractor at Pre-Construction conference | |||||||||||||||||
| 12 | 01 00 10 Security - 1.1 A. Identification of Employees | X | 14d - PSW | EAL | |||||||||||||||||
| 13 | 01 36 00, Par. 2.3 - Construction Dewatering Permit | X | 5d - PSW | ||||||||||||||||||
| 14 | 01 36 00, Par. 2.3 - Construction Storm Water Notice of Intent | X | 5d - PSW | ||||||||||||||||||
| 15 | 01 36 00, Par. 2.3 - Storm Water Pollution Prevention Plan | X | 5d - PSW | ||||||||||||||||||
| 16 | 01 36 00, Par. 2.3 - Storm Water Notice of Termination | X | 5d - PSW | ||||||||||||||||||
| 17 | 01 36 00, Par. 2.3 - Signed Statement (project has no new ACM) | X | 5d - PSW | ||||||||||||||||||
| 18 | 01 73 10 1.4 Cutting and Patching - 1.4.A. Proposal | X | 10d - PSW | ||||||||||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||||||
| 19 | 02 83 33 1.1 Lead Paint Abatement Work Plan | 1 | 15-days ANP | ||||||||||||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||||||
| 03 03 00 Product Data for Dayton Superior HD 50 Grout - 1.3.A. | 1 | 15d PSW | |||||||||||||||||||
| 03 30 00 Concrete Product Data - 1.3.B | 3 | BBCW | |||||||||||||||||||
| 03 30 00 Shop Drawings for reinforcement and fabrication - 1.3.C | 3 | BBCW | |||||||||||||||||||
| 03 30 00 Lab Test Reports and Mix Design - 1.3.D | 1 | BBCW | |||||||||||||||||||
| 03 30 00 Material Certificates (in lieu of lab reports) - 1.3.E | 1 | BBCW | |||||||||||||||||||
| DIVISION 26 - Electrical | |||||||||||||||||||||
| 26 05 19 Product Data - 1.3.A. | 3 | 15d ANTP | |||||||||||||||||||
| 26 05 26 Product Data - 1.3.A | 15d ANTP | ||||||||||||||||||||
| 26 05 26 Testing Results - 1.3.B and 3.3.A. | 3d ATT | ||||||||||||||||||||
| 26 05 33 Product Data - 1.4.A | 3 | 15d ANTP | |||||||||||||||||||
| 26 05 43 Product Data - 1.3.A. | 3 | 15d ANTP | |||||||||||||||||||
| 26 05 53 Product Data - 1.3.A. | 3 | 15d ANTP | |||||||||||||||||||
| 26 24 16 Product Data - 1.3.A. | 3 | 15d ANTP | |||||||||||||||||||
| 26 24 16 Shop Drawings - 1.3.B. | 3 | 15d ANTP | |||||||||||||||||||
| 26 27 26 Product Data - 1.3.B. | 3 | 15d ANTP | |||||||||||||||||||
| 26 28 16 Enclosed Switches and Circuit Breakers - 1.3 | 3 | 15d ANTP | |||||||||||||||||||
| 26 32 14 Product Data - 1.3.A.1. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Statement of Compliance - 1.3.A.2. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Certification of Prototype Testing - 1.3.A.3. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Warranty - 1.3.A.4. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Shop Drawings with plan, elevation, dimensions & interconnections details - 1.3.A.5. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Interconnections Diagrams - 1.3.A.6. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Installation Instructions - 1.3.A.7. | 3 | 10d ANTP | |||||||||||||||||||
| 26 32 14 Factory testing report - 1.4.A | 3 | 10d ANTP | |||||||||||||||||||
| 26 36 23 Product Data - 1.3.A. | 3 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 26 36 23 Shop Drawings - 1.3.B. | 3 | 15d ANTP | |||||||||||||||||||
| 26 54 21 Product data - 1.2.A. | 3 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 26 54 21 Spare Parts - 1.2.B. | 10 | PPC | |||||||||||||||||||
| DIVISION 31 - Earthwork | |||||||||||||||||||||
| 31 20 00 Product data - 1.4.A | 3 | ||||||||||||||||||||
| 31 20 00 Compacition Test Results - 1.4.B and 3.4. | 3 | ||||||||||||||||||||
| DIVISION 32 - Exterior Improvements | |||||||||||||||||||||
| 32 17 23 Product Data for Paint and Glass Bead 1.3. | 3 | 3 | 3 | 3 | 3 | 15d PSW | |||||||||||||||
| DIVISION 34 - Transportation | |||||||||||||||||||||
| 34 71 13 Product Data for Barriers 1.3.A.1. | 3 | 3 | 3 | 3 | 15d PSW | ||||||||||||||||
| 34 71 13 Product Data for Glycol Fill 1.3.A.2. | 3 | 3 | 15d PSW | ||||||||||||||||||
| D - Days | PSW - Prior to Start Work | PFI - Prior to Final Inspection | |||||||||||||||||||
| AFI - After Final Inspection | BBCW - Before Beginning Concrete Work | PPC - Prior to Project Completion | |||||||||||||||||||
| ANP - After Notice to Proceed | BD - Before Delivery | PT - Prior to Testing | |||||||||||||||||||
| ATT - After Test is Taken | PBC - Prior to Beginning Construction | PTW - Prior to Event | |||||||||||||||||||
| PRI - Prior to Final Inspection | SRO - After Each Occurrence |
&L&"Times New Roman,Regular"&12Attachment 2&R&"Times New Roman,Regular"&12FA 4626-XX-X-XXX
File details come from the government source that posted it. Updated .