Response_to_Questions.docx
DOCX document 15 KB Posted
- Attached to
- Repair Mechanical System Bldg. 1867 Federal contract opportunity
- Solicitation number
- FA4626-16-R-0020
About this file
Response to Questions 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Doc_(FBO).pdf | ||
| Appendix_A_02_83_33__MAFB_Bldg_1867_Asbestos_-_Lead_Paint_Report__.pdf | ||
| M2.1.pdf | ||
| Attach_5-2_Wage_Determination_Heavy.docx | DOCX document | |
| Attch_9_-_Subcontractor_Consent_Form_-_16-R0020.doc | DOC document | |
| Attach_3_Schedule_of_Drawings.docx | DOCX document | |
| Attch_8_Past_Performance_Questionaire_new.docx | DOCX document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_5-1_Wage_Determination_Building.docx | DOCX document | |
| Attach_1_Specifications.zip | ZIP file | |
| Attach_2_Submittal_Schedule.xls | XLS spreadsheet | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Attach_6_Base_Entry.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4626-16-R-0020
Response to Questions
1. Riser demo on sheet E1.0 shows demotion of conduit and wire to existing lift station. Specification 33 32 00 1. States that we are to keep existing system operation until the new system is operational. Which is correct?
Response: The new sewer piping and lift station are in a different location than the new system being installed (except for final tie in points). The existing system has to remain in operation until the new system is installed, at which a small outage can be scheduled to allow new system to be tied into old system.
2. Electricians are to perform a megohmeter test on conductors and cables per 26 05 19 3.6 . We have always done this, but 26 05 19 1.5 A states that testing agency is to be independent. May electricians do the testing?
Response: As long as electricians have documentation showing they are approved to do the work, they may do the testing.
3. Should 26 28 16 3.4 A. 1. be the same as 26 24 16 3.4 B. 1.?
Response: QC shall do both inspections as required in specifications. If some components are covered by both specification sections, then the stricter of the two spec sections shall be used.
4. Are any pictures from the site visit going to be posted?
Response: The government will try to provide pictures. Due to the location of the project, few pictures are allowed.
File details come from the government source that posted it. Updated .