Attach_2_Submittal_Schedule.xls

XLS spreadsheet 67 KB Posted

Attached to
Repair Mechanical System Bldg. 1867 Federal contract opportunity
Solicitation number
FA4626-16-R-0020
Issued by
Department of the Air Force Global Strike Command

About this file

Attach 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Repair Mechanical System Bldg. 1867, newest first.
File Type Posted
Response_to_Questions.docx DOCX document
Site_Visit_Doc_(FBO).pdf PDF
Appendix_A_02_83_33__MAFB_Bldg_1867_Asbestos_-_Lead_Paint_Report__.pdf PDF
M2.1.pdf PDF
Solicitation.doc DOC document
Attach_6_Base_Entry.pdf PDF
Attach_5-2_Wage_Determination_Heavy.docx DOCX document
Attch_9_-_Subcontractor_Consent_Form_-_16-R0020.doc DOC document
Attach_3_Schedule_of_Drawings.docx DOCX document
Attch_8_Past_Performance_Questionaire_new.docx DOCX document
Attach_4_Drawings.zip ZIP file
Attach_5-1_Wage_Determination_Building.docx DOCX document
Attach_1_Specifications.zip ZIP file
Attach_7_Special_Contract_Requirements.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 04-1062Rpr Mech Sys Bldg 1867FA4626-16-R-0020
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST REPORTSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
101 00 00 General Requirements - 3.5 B. As-Built Field Data23d - PFI
201 00 00 General Requirements - 3.5 F. As-Built Field Data130 d - AFIAutoCAD CD
301 00 00 General Requirements - 3.7 A. O&M Instructions121d - ATT1 hardcopy, 2 CD's
401 00 00 General Requirements - 3.8 A. Contractor Furnished Equipment Data10d - BDEquipment List & Guarantees
501 00 00 General Requirements - 3.11 A. Start of Work notification35 d - PTE
601 00 00 General Requirements - 3.12 A. Notice of Pre-Final and Final Inspections314d - PTERed line “As-Built” dwgs shall be provided by the Contractor at final inspection.
701 00 00 General Requirements - 3.13 A. Construction Near Utilities5d - PSWAF Form 103 Work Clearance
801 00 00 General Requirements - 3.14 A. Utility Outages314 d - PSW
901 00 00 General Requirements - 3.18 B. QC Submittals310d - ANPQuality Control Plan
1001 00 00 General Requirements - 3.20 A. 1354 checklist110d - PFIChecklist to be delivered to the contractor at Pre-Construction conference
1101 00 10 Security - 1.1 A. Identification of Employees14d - PSWEAL
1201 36 00 2.3 Environmental Permits35d - PSW
DIVISION 2 - EXISTING CONDITIONS
1302 83 33 Copy of Abatement Contractor's Project Schedule 8.1.1 Submittals115-days ANP
1402 83 33 Copy of Abatement Contractor's Decontamination Procedures 8.1.2 Submittals115-days PSW
1502 83 33 Copy of Abatement Contractor's Work Plan 8.1.3 Submittals115-days PSW
1602 83 33 Copy of Abatement Contractor's Removal Methods 8.1.4 Submittals115-days PSW
1702 83 33 Copy of Abatement Contractor's List of Sub-Contractors 8.1.5 Submittals115-days PSW
1802 83 33 Copy of Abatement Contractor's Safety Plan 8.1.6 Submittals6115-days ANP
1902 83 33 Copy of Abatement Contractor's Personnel Protective Equipment 8.1.7 Submittals115-days ANP
2002 83 33 Copy of Abatement Contractor's Equipment Specifications 8.1.8115-days ANP
2102 83 33 Copy of Abatement Contractor's Specification for Vacuum Equipment 8.1.9 Submittals115-days ANP
2202 83 33 Copy of Abatement Contractor's Disposal Plan 8.1.10 Submittals115-days PSW
2302 83 33 Copy of Abatement Contractor's Project Staffing List 1.7 A 11 Submittals115-days PSW
2402 83 33 Copy of Abatement Contractor's Medical Examination Records for All Workers 8.1.12 Submittals115-days PSW
2502 88 33 Copy of Abatement Contractor's MSDS for Chemicals Used 8.1.13 Submittals115-days ANP
2602 88 33 Copy of Abatement Contractor's Description of Final Clean-Up Procedures 8.1.14 Submittals115-days PSW
2702 88 33 Copy of Abatement Contractor's Emergency Procedures 8.1.15 Submittals115-days ANP
2802 88 33 Copy of Abatement Contractor's Certificates of Compliance of Equipment 8.1.16 Submittals115-days ANP
2902 88 33 Copy of Abatement Contractor's Notifications and Policies 8.1.17 Submittals115-days ANP
3002 83 33 Copy of Abatement Contractor's Site Access Plan 8.1.18 Submittals115-days PSW
3102 83 33 Copy of Abatement Contractor's Work Completion Certification 8.2.1 Final Submittals115 days PPC
3202 83 33 Copy of Abatement Contractor's Air Monitoring Documentation 8.2.2 Final Submittals115 days PPC
3302 83 33 Copy of Abatement Contractor's Project Record Documents 8.2.3 Final Submittals115 days PPC
3402 83 33 Copy of Abatement Contractor's Disposal Manifests 8.2.4 Final Submittals115 days PPC
DIVISION 03 - CONCRETE
3503 30 00 1.2.1 Concrete Mix DesignXBBCW
3603 30 00 1.2.1 All Test ReportsXBBCW
3703 30 00 1.3.2 Concrete Product Data (Cement, Fly Ash, Pozzolonic materials, reinforcement and forming accessories, admixtures, patching compounds, joint systems, and curing compounds)XBBCW
3803 30 00 1.2.3 Fabrication Shop DrawingsXBBCW
3903 30 00 1.2.4 Cold Weather Placing Plan3PSW
4003 30 00 1.2.5 Hot Weather Placing Plan3PSW
4103 30 00 1.3.F Concrete Batch Tickets3ATT
4203 30 00 1.3.1 Preconstruction Submittals (Quality Control Plan, etc.)XBBCW
DIVISION 4 - UNIT MASONRY
4304 82 00 1.2.2.1 Shop Drawings515-days PSW
4404 82 00 1.2.2.2 Product Data515-days PSW
4504 82 00 1.2.2.3 Samples515-days PSW
4604 82 00 1.2.2.4 Test Reports515-days PSW
DIVISION 5 - METALS
4705 12 00 1.5.A Product DataX15-days PSW
4805 12 00 1.5.B Shop DrawingsX15-days PSW
4905 12 00 1.5.C Welding Procedure Specification and Procedure Qualification RecordsX15-days PSW
5005 12 00 1.5.D Qualification DataX15-days PSW
DIVISION 22 - PLUMBING
5122 05 29 Plumbing Hangers and Supports - Manufacturer's Literature315-days ANP
5222 07 19 Plumbing Systems Insulation - Manufacturer's Literature315-days ANP
5322 13 16 Sanitary Waste and Vent Piping - 1.4A Product Data315-days ANP
5422 13 16 Sanitary Waste and Vent Piping - 1.4A Product Data
DIVISION 23 - HVAC
5523 05 13 Common Motors for HVAC - 1.4 A. Submittals315-days ANP
5623 05 13 Common Motors for HVAC - 1.4 B. Submittals315-days ANP
5723 05 13 Common Motors for HVAC - 1.4 C. Submittals315-days ANP
5823 05 19 Meters & Gages - 1.3 A. Product Data315-days ANP
5923 05 19 Meters & Gages - 1.4 A. Product Certificates35-days PBC
6023 05 29 Hangers & Supports - 1.4 A. Product Data315-days ANP
6123 05 29 Hangers & Supports - 1.5 A. Structural Steel Welding Qualification310-days PSW
6223 05 29 Hangers & Supports - 1.5 B. Pipe Welding Qualifications310-days PSW
6323 05 53 ID for HVAC - 1.3 A. Product Data315-days ANP
6423 05 93 TAB - 1.4 A. Qualification Data315-days ANP
6523 05 93 TAB - 1.4 B. Contract Docs Exam Report330-days ANP
6623 05 93 TAB - 1.4 C. Certified TAB Field Reports315-days ATT
6723 05 93 TAB - 1.4 D. Instrument Calibration Reports360-days ANP
6823 05 93 TAB - 1.6 A. Scheduling TestsX7-days PTGov requires 7 days advance notice for each test.
6923 07 19 HVAC Insulation - 1.3 A. Product Data315-days ANP
7023 07 19 HVAC Insulation - 1.4 A. Qualification Data310-days PSW
7123 11 23 Facility NG Piping - 1.5 A. Product Data315-days ANP
7223 11 23 Facility NG Piping - 1.6 A. Coordination Drawings310-days PSW
7323 11 23 Facility NG Piping - 1.6 B. Site Survey315-days PSW
7423 11 23 Facility NG Piping - 1.6 C. Test Reports37-days ATT
7523 11 23 Facility NG Piping - 1.8 A. Welding Certificates310-days PSW
7623 31 13 Metal Ducts - 1.6 B. Duct Sealants Product Data315-days ANP
7723 31 13 Metal Ducts - 1.6 C. Duct Leakage Test Report315-days ANP
7823 33 00 Air Duct Accessories - 1.3 A. Product Data315-days ANP
7923 34 23 HVAC Power Ventilators - 1.4 A. Product Data315-days ANP
8023 34 23 HVAC Power Ventilators - 1.4 B. Shop Drawings310-days PSW
8123 34 23 HVAC Power Ventilators - 1.4 C. Test Reports37-days ATT
8223 34 23 HVAC Power Ventilators - 1.6 A. Maintenance Materials130-days PPCOne extra fan belt per fan
8323 37 13 Diffusers, Registers, and Grilles - 1.3 A. Product Data315-days ANP
8423 37 13 Diffusers, Registers, and Grilles - 1.3 B. Samples1130-days PSW
8523 37 13 Diffusers, Registers, and Grilles - 1.4 A. Coordination Drawings310-days PSW
8623 37 13 Diffusers, Registers, and Grilles - 1.4 B. Startup Reports315-days ANP
8723 54 00 - Furnaces - 1.3A Product Data315-days ANPFurnace, thermostat, Air Filter, Refrigeration components
8823 54 00 - Furnaces - 1.3B Shop Drawings315 Days PSW
8923 54 00 - Furnaces - 1.4A Warranty Information315-days ANP
9023 54 00 - Furnaces - 1.6A Maintenance Materials230-days PPCDisposable Air Filters
9123 81 23 - Computer Room Air-Conditioners - 1.3A Product data315-days ANP
9223 81 23 - Computer Room Air-Conditioners - 1.3B Shop Drawings315 Days PSW
9323 81 23 - Computer Room Air-Conditioners - 1.4A Coordination Drawings315 Days PSW
9423 81 23 - Computer Room Air-Conditioners - 1.4B Field QC Reports37D SRO
9523 81 23 - Computer Room Air-Conditioners - 1.4C Coordination Drawings315-days ANP
9623 81 23 - Computer Room Air-Conditioners - 1.6A Maintenance MaterialsX30-days PPC2 Sets of Filters for each unit, one set of belts for belt driven fans
DIVISION 26 - Electrical
9726 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.3.315d ANTP
9826 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4.3315d ANTP
9926 05 26 Grounding and Bonding for Electrical Systems - 1.3.A315d ANTP
10026 05 26 Grounding and Bonding for Electrical Systems - 1.3.B315d ANTP
10126 05 26 Grounding and Bonding for Electrical Systems - 1.3.C33d ATT
10226 05 29 Hangers and Supports for Electrical Systems - 1.3.315d ANTP
10326 05 53 Identification for Electrical Systems - 1.3.315d ANTP
10426 05 33 Raceways and Boxes for Electrical Systems - 1.3.A315d ANTP
10526 05 33 Raceways and Boxes for Electrical Systems - 1.3.B315d ANTP
10626 24 16 Panelboards - 1.3.A315d ANTP
10726 24 16 Panelboards - 1.3.B315d ANTP
10826 24 16 Panelboards - 1.4.A. Panel Schedules35d PFI
10926 24 16 Panelboards - 1.5.A. Maintenance Materials230d PPC
11026 27 26 Wiring Devices - 1.3.315d ANTP
11126 28 16 Enclosed Switches and Circuit Breakers - 1.3315d ANTP
11226 51 00 Interior Lighting - 1.4.A315d ANTP
DIVISION 31 - EARTHWORK
11331 23 33 1.2.1 Utility Notices3PSWBase and sub base material sieve analysis and proctor. Subgrade proctor.
11431 23 33 1.2.2 Type 1 Bedding Material Sieve Analysis and Proctor3ATTCompaction Test Results
11531 23 33 1.2.3 Compaction Test Results3ATT
DIVISION 32 - EXTERIOR IMPROVEMENTS
11632 10 00 1.1.1 Crushed Gravel Materials3PSW
11732 10 00 1.1.2 Plant Mix Gravel3PSW
11832 10 00 1.1.3 Asphalt Cement3PSW
11932 10 00 1.1.4 Tack Coat3PSW
12032 10 00 1.1.5 Asphaltic Mix Design3PSW
12132 10 00 1.1.6 Quality Control Test Results3ATT
12232 92 19 1.4.A.1 Seed Certificates3PSW
12332 92 19 1.4.A.2 Manufacturer's Catalog Cuts and Instructions3PSW
DIVISION 33 - WATER UTILITIES
12433 05 23 1.1.1 Encasement Pipe3PSW
12533 05 23 1.1.2 Casing Spacers3PSW
12633 05 23 1.1.3 Casing End Seals3PSW
12733 30 00 1.2.A Sewer Pipe Catalog Cuts3PSW
12833 30 00 1.2.B Sewer Service Fitting Catalog Cuts3PSW
12933 30 00 1.2.C Sewer Service Video Inspection Copy3ATT
13033 32 00 1.2 Equipment Shop Drawings (Installation & User Instructions, Evidence of Established Service Program, Sales Representative & Technicians, Installation List, Pump Unit, Tank, Discharge Assembly Disconnect Valve, Electrical Quick Disconnect, Check Valve, Anti Siphon Valve, Control Panel)3ANP
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning ConstructionPTW - Prior to Event
PRI - Prior to Final InspectionSRO - After Each Occurrence