Attach_2_Submittal_Schedule.xls
XLS spreadsheet 67 KB Posted
- Attached to
- Repair Mechanical System Bldg. 1867 Federal contract opportunity
- Solicitation number
- FA4626-16-R-0020
About this file
Attach 2 Material Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response_to_Questions.docx | DOCX document | |
| Site_Visit_Doc_(FBO).pdf | ||
| Appendix_A_02_83_33__MAFB_Bldg_1867_Asbestos_-_Lead_Paint_Report__.pdf | ||
| M2.1.pdf | ||
| Solicitation.doc | DOC document | |
| Attach_6_Base_Entry.pdf | ||
| Attach_5-2_Wage_Determination_Heavy.docx | DOCX document | |
| Attch_9_-_Subcontractor_Consent_Form_-_16-R0020.doc | DOC document | |
| Attach_3_Schedule_of_Drawings.docx | DOCX document | |
| Attch_8_Past_Performance_Questionaire_new.docx | DOCX document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_5-1_Wage_Determination_Building.docx | DOCX document | |
| Attach_1_Specifications.zip | ZIP file | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 04-1062 | Rpr Mech Sys Bldg 1867 | FA4626-16-R-0020 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST REPORTS | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||||||
| 1 | 01 00 00 General Requirements - 3.5 B. As-Built Field Data | 2 | 3d - PFI | ||||||||||||||||||
| 2 | 01 00 00 General Requirements - 3.5 F. As-Built Field Data | 1 | 30 d - AFI | AutoCAD CD | |||||||||||||||||
| 3 | 01 00 00 General Requirements - 3.7 A. O&M Instructions | 1 | 2 | 1d - ATT | 1 hardcopy, 2 CD's | ||||||||||||||||
| 4 | 01 00 00 General Requirements - 3.8 A. Contractor Furnished Equipment Data | 10d - BD | Equipment List & Guarantees | ||||||||||||||||||
| 5 | 01 00 00 General Requirements - 3.11 A. Start of Work notification | 3 | 5 d - PTE | ||||||||||||||||||
| 6 | 01 00 00 General Requirements - 3.12 A. Notice of Pre-Final and Final Inspections | 3 | 14d - PTE | Red line “As-Built” dwgs shall be provided by the Contractor at final inspection. | |||||||||||||||||
| 7 | 01 00 00 General Requirements - 3.13 A. Construction Near Utilities | 5d - PSW | AF Form 103 Work Clearance | ||||||||||||||||||
| 8 | 01 00 00 General Requirements - 3.14 A. Utility Outages | 3 | 14 d - PSW | ||||||||||||||||||
| 9 | 01 00 00 General Requirements - 3.18 B. QC Submittals | 3 | 10d - ANP | Quality Control Plan | |||||||||||||||||
| 10 | 01 00 00 General Requirements - 3.20 A. 1354 checklist | 1 | 10d - PFI | Checklist to be delivered to the contractor at Pre-Construction conference | |||||||||||||||||
| 11 | 01 00 10 Security - 1.1 A. Identification of Employees | 14d - PSW | EAL | ||||||||||||||||||
| 12 | 01 36 00 2.3 Environmental Permits | 3 | 5d - PSW | ||||||||||||||||||
| DIVISION 2 - EXISTING CONDITIONS | |||||||||||||||||||||
| 13 | 02 83 33 Copy of Abatement Contractor's Project Schedule 8.1.1 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 14 | 02 83 33 Copy of Abatement Contractor's Decontamination Procedures 8.1.2 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 15 | 02 83 33 Copy of Abatement Contractor's Work Plan 8.1.3 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 16 | 02 83 33 Copy of Abatement Contractor's Removal Methods 8.1.4 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 17 | 02 83 33 Copy of Abatement Contractor's List of Sub-Contractors 8.1.5 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 18 | 02 83 33 Copy of Abatement Contractor's Safety Plan 8.1.6 Submittals | 6 | 1 | 15-days ANP | |||||||||||||||||
| 19 | 02 83 33 Copy of Abatement Contractor's Personnel Protective Equipment 8.1.7 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 20 | 02 83 33 Copy of Abatement Contractor's Equipment Specifications 8.1.8 | 1 | 15-days ANP | ||||||||||||||||||
| 21 | 02 83 33 Copy of Abatement Contractor's Specification for Vacuum Equipment 8.1.9 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 22 | 02 83 33 Copy of Abatement Contractor's Disposal Plan 8.1.10 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 23 | 02 83 33 Copy of Abatement Contractor's Project Staffing List 1.7 A 11 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 24 | 02 83 33 Copy of Abatement Contractor's Medical Examination Records for All Workers 8.1.12 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 25 | 02 88 33 Copy of Abatement Contractor's MSDS for Chemicals Used 8.1.13 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 26 | 02 88 33 Copy of Abatement Contractor's Description of Final Clean-Up Procedures 8.1.14 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 27 | 02 88 33 Copy of Abatement Contractor's Emergency Procedures 8.1.15 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 28 | 02 88 33 Copy of Abatement Contractor's Certificates of Compliance of Equipment 8.1.16 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 29 | 02 88 33 Copy of Abatement Contractor's Notifications and Policies 8.1.17 Submittals | 1 | 15-days ANP | ||||||||||||||||||
| 30 | 02 83 33 Copy of Abatement Contractor's Site Access Plan 8.1.18 Submittals | 1 | 15-days PSW | ||||||||||||||||||
| 31 | 02 83 33 Copy of Abatement Contractor's Work Completion Certification 8.2.1 Final Submittals | 1 | 15 days PPC | ||||||||||||||||||
| 32 | 02 83 33 Copy of Abatement Contractor's Air Monitoring Documentation 8.2.2 Final Submittals | 1 | 15 days PPC | ||||||||||||||||||
| 33 | 02 83 33 Copy of Abatement Contractor's Project Record Documents 8.2.3 Final Submittals | 1 | 15 days PPC | ||||||||||||||||||
| 34 | 02 83 33 Copy of Abatement Contractor's Disposal Manifests 8.2.4 Final Submittals | 1 | 15 days PPC | ||||||||||||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||||||
| 35 | 03 30 00 1.2.1 Concrete Mix Design | X | BBCW | ||||||||||||||||||
| 36 | 03 30 00 1.2.1 All Test Reports | X | BBCW | ||||||||||||||||||
| 37 | 03 30 00 1.3.2 Concrete Product Data (Cement, Fly Ash, Pozzolonic materials, reinforcement and forming accessories, admixtures, patching compounds, joint systems, and curing compounds) | X | BBCW | ||||||||||||||||||
| 38 | 03 30 00 1.2.3 Fabrication Shop Drawings | X | BBCW | ||||||||||||||||||
| 39 | 03 30 00 1.2.4 Cold Weather Placing Plan | 3 | PSW | ||||||||||||||||||
| 40 | 03 30 00 1.2.5 Hot Weather Placing Plan | 3 | PSW | ||||||||||||||||||
| 41 | 03 30 00 1.3.F Concrete Batch Tickets | 3 | ATT | ||||||||||||||||||
| 42 | 03 30 00 1.3.1 Preconstruction Submittals (Quality Control Plan, etc.) | X | BBCW | ||||||||||||||||||
| DIVISION 4 - UNIT MASONRY | |||||||||||||||||||||
| 43 | 04 82 00 1.2.2.1 Shop Drawings | 5 | 15-days PSW | ||||||||||||||||||
| 44 | 04 82 00 1.2.2.2 Product Data | 5 | 15-days PSW | ||||||||||||||||||
| 45 | 04 82 00 1.2.2.3 Samples | 5 | 15-days PSW | ||||||||||||||||||
| 46 | 04 82 00 1.2.2.4 Test Reports | 5 | 15-days PSW | ||||||||||||||||||
| DIVISION 5 - METALS | |||||||||||||||||||||
| 47 | 05 12 00 1.5.A Product Data | X | 15-days PSW | ||||||||||||||||||
| 48 | 05 12 00 1.5.B Shop Drawings | X | 15-days PSW | ||||||||||||||||||
| 49 | 05 12 00 1.5.C Welding Procedure Specification and Procedure Qualification Records | X | 15-days PSW | ||||||||||||||||||
| 50 | 05 12 00 1.5.D Qualification Data | X | 15-days PSW | ||||||||||||||||||
| DIVISION 22 - PLUMBING | |||||||||||||||||||||
| 51 | 22 05 29 Plumbing Hangers and Supports - Manufacturer's Literature | 3 | 15-days ANP | ||||||||||||||||||
| 52 | 22 07 19 Plumbing Systems Insulation - Manufacturer's Literature | 3 | 15-days ANP | ||||||||||||||||||
| 53 | 22 13 16 Sanitary Waste and Vent Piping - 1.4A Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 54 | 22 13 16 Sanitary Waste and Vent Piping - 1.4A Product Data | ||||||||||||||||||||
| DIVISION 23 - HVAC | |||||||||||||||||||||
| 55 | 23 05 13 Common Motors for HVAC - 1.4 A. Submittals | 3 | 15-days ANP | ||||||||||||||||||
| 56 | 23 05 13 Common Motors for HVAC - 1.4 B. Submittals | 3 | 15-days ANP | ||||||||||||||||||
| 57 | 23 05 13 Common Motors for HVAC - 1.4 C. Submittals | 3 | 15-days ANP | ||||||||||||||||||
| 58 | 23 05 19 Meters & Gages - 1.3 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 59 | 23 05 19 Meters & Gages - 1.4 A. Product Certificates | 3 | 5-days PBC | ||||||||||||||||||
| 60 | 23 05 29 Hangers & Supports - 1.4 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 61 | 23 05 29 Hangers & Supports - 1.5 A. Structural Steel Welding Qualification | 3 | 10-days PSW | ||||||||||||||||||
| 62 | 23 05 29 Hangers & Supports - 1.5 B. Pipe Welding Qualifications | 3 | 10-days PSW | ||||||||||||||||||
| 63 | 23 05 53 ID for HVAC - 1.3 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 64 | 23 05 93 TAB - 1.4 A. Qualification Data | 3 | 15-days ANP | ||||||||||||||||||
| 65 | 23 05 93 TAB - 1.4 B. Contract Docs Exam Report | 3 | 30-days ANP | ||||||||||||||||||
| 66 | 23 05 93 TAB - 1.4 C. Certified TAB Field Reports | 3 | 15-days ATT | ||||||||||||||||||
| 67 | 23 05 93 TAB - 1.4 D. Instrument Calibration Reports | 3 | 60-days ANP | ||||||||||||||||||
| 68 | 23 05 93 TAB - 1.6 A. Scheduling Tests | X | 7-days PT | Gov requires 7 days advance notice for each test. | |||||||||||||||||
| 69 | 23 07 19 HVAC Insulation - 1.3 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 70 | 23 07 19 HVAC Insulation - 1.4 A. Qualification Data | 3 | 10-days PSW | ||||||||||||||||||
| 71 | 23 11 23 Facility NG Piping - 1.5 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 72 | 23 11 23 Facility NG Piping - 1.6 A. Coordination Drawings | 3 | 10-days PSW | ||||||||||||||||||
| 73 | 23 11 23 Facility NG Piping - 1.6 B. Site Survey | 3 | 15-days PSW | ||||||||||||||||||
| 74 | 23 11 23 Facility NG Piping - 1.6 C. Test Reports | 3 | 7-days ATT | ||||||||||||||||||
| 75 | 23 11 23 Facility NG Piping - 1.8 A. Welding Certificates | 3 | 10-days PSW | ||||||||||||||||||
| 76 | 23 31 13 Metal Ducts - 1.6 B. Duct Sealants Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 77 | 23 31 13 Metal Ducts - 1.6 C. Duct Leakage Test Report | 3 | 15-days ANP | ||||||||||||||||||
| 78 | 23 33 00 Air Duct Accessories - 1.3 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 79 | 23 34 23 HVAC Power Ventilators - 1.4 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 80 | 23 34 23 HVAC Power Ventilators - 1.4 B. Shop Drawings | 3 | 10-days PSW | ||||||||||||||||||
| 81 | 23 34 23 HVAC Power Ventilators - 1.4 C. Test Reports | 3 | 7-days ATT | ||||||||||||||||||
| 82 | 23 34 23 HVAC Power Ventilators - 1.6 A. Maintenance Materials | 1 | 30-days PPC | One extra fan belt per fan | |||||||||||||||||
| 83 | 23 37 13 Diffusers, Registers, and Grilles - 1.3 A. Product Data | 3 | 15-days ANP | ||||||||||||||||||
| 84 | 23 37 13 Diffusers, Registers, and Grilles - 1.3 B. Samples | 1 | 1 | 30-days PSW | |||||||||||||||||
| 85 | 23 37 13 Diffusers, Registers, and Grilles - 1.4 A. Coordination Drawings | 3 | 10-days PSW | ||||||||||||||||||
| 86 | 23 37 13 Diffusers, Registers, and Grilles - 1.4 B. Startup Reports | 3 | 15-days ANP | ||||||||||||||||||
| 87 | 23 54 00 - Furnaces - 1.3A Product Data | 3 | 15-days ANP | Furnace, thermostat, Air Filter, Refrigeration components | |||||||||||||||||
| 88 | 23 54 00 - Furnaces - 1.3B Shop Drawings | 3 | 15 Days PSW | ||||||||||||||||||
| 89 | 23 54 00 - Furnaces - 1.4A Warranty Information | 3 | 15-days ANP | ||||||||||||||||||
| 90 | 23 54 00 - Furnaces - 1.6A Maintenance Materials | 2 | 30-days PPC | Disposable Air Filters | |||||||||||||||||
| 91 | 23 81 23 - Computer Room Air-Conditioners - 1.3A Product data | 3 | 15-days ANP | ||||||||||||||||||
| 92 | 23 81 23 - Computer Room Air-Conditioners - 1.3B Shop Drawings | 3 | 15 Days PSW | ||||||||||||||||||
| 93 | 23 81 23 - Computer Room Air-Conditioners - 1.4A Coordination Drawings | 3 | 15 Days PSW | ||||||||||||||||||
| 94 | 23 81 23 - Computer Room Air-Conditioners - 1.4B Field QC Reports | 3 | 7D SRO | ||||||||||||||||||
| 95 | 23 81 23 - Computer Room Air-Conditioners - 1.4C Coordination Drawings | 3 | 15-days ANP | ||||||||||||||||||
| 96 | 23 81 23 - Computer Room Air-Conditioners - 1.6A Maintenance Materials | X | 30-days PPC | 2 Sets of Filters for each unit, one set of belts for belt driven fans | |||||||||||||||||
| DIVISION 26 - Electrical | |||||||||||||||||||||
| 97 | 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.3. | 3 | 15d ANTP | ||||||||||||||||||
| 98 | 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4. | 3 | 3 | 15d ANTP | |||||||||||||||||
| 99 | 26 05 26 Grounding and Bonding for Electrical Systems - 1.3.A | 3 | 15d ANTP | ||||||||||||||||||
| 100 | 26 05 26 Grounding and Bonding for Electrical Systems - 1.3.B | 3 | 15d ANTP | ||||||||||||||||||
| 101 | 26 05 26 Grounding and Bonding for Electrical Systems - 1.3.C | 3 | 3d ATT | ||||||||||||||||||
| 102 | 26 05 29 Hangers and Supports for Electrical Systems - 1.3. | 3 | 15d ANTP | ||||||||||||||||||
| 103 | 26 05 53 Identification for Electrical Systems - 1.3. | 3 | 15d ANTP | ||||||||||||||||||
| 104 | 26 05 33 Raceways and Boxes for Electrical Systems - 1.3.A | 3 | 15d ANTP | ||||||||||||||||||
| 105 | 26 05 33 Raceways and Boxes for Electrical Systems - 1.3.B | 3 | 15d ANTP | ||||||||||||||||||
| 106 | 26 24 16 Panelboards - 1.3.A | 3 | 15d ANTP | ||||||||||||||||||
| 107 | 26 24 16 Panelboards - 1.3.B | 3 | 15d ANTP | ||||||||||||||||||
| 108 | 26 24 16 Panelboards - 1.4.A. Panel Schedules | 3 | 5d PFI | ||||||||||||||||||
| 109 | 26 24 16 Panelboards - 1.5.A. Maintenance Materials | 2 | 30d PPC | ||||||||||||||||||
| 110 | 26 27 26 Wiring Devices - 1.3. | 3 | 15d ANTP | ||||||||||||||||||
| 111 | 26 28 16 Enclosed Switches and Circuit Breakers - 1.3 | 3 | 15d ANTP | ||||||||||||||||||
| 112 | 26 51 00 Interior Lighting - 1.4.A | 3 | 15d ANTP | ||||||||||||||||||
| DIVISION 31 - EARTHWORK | |||||||||||||||||||||
| 113 | 31 23 33 1.2.1 Utility Notices | 3 | PSW | Base and sub base material sieve analysis and proctor. Subgrade proctor. | |||||||||||||||||
| 114 | 31 23 33 1.2.2 Type 1 Bedding Material Sieve Analysis and Proctor | 3 | ATT | Compaction Test Results | |||||||||||||||||
| 115 | 31 23 33 1.2.3 Compaction Test Results | 3 | ATT | ||||||||||||||||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | |||||||||||||||||||||
| 116 | 32 10 00 1.1.1 Crushed Gravel Materials | 3 | PSW | ||||||||||||||||||
| 117 | 32 10 00 1.1.2 Plant Mix Gravel | 3 | PSW | ||||||||||||||||||
| 118 | 32 10 00 1.1.3 Asphalt Cement | 3 | PSW | ||||||||||||||||||
| 119 | 32 10 00 1.1.4 Tack Coat | 3 | PSW | ||||||||||||||||||
| 120 | 32 10 00 1.1.5 Asphaltic Mix Design | 3 | PSW | ||||||||||||||||||
| 121 | 32 10 00 1.1.6 Quality Control Test Results | 3 | ATT | ||||||||||||||||||
| 122 | 32 92 19 1.4.A.1 Seed Certificates | 3 | PSW | ||||||||||||||||||
| 123 | 32 92 19 1.4.A.2 Manufacturer's Catalog Cuts and Instructions | 3 | PSW | ||||||||||||||||||
| DIVISION 33 - WATER UTILITIES | |||||||||||||||||||||
| 124 | 33 05 23 1.1.1 Encasement Pipe | 3 | PSW | ||||||||||||||||||
| 125 | 33 05 23 1.1.2 Casing Spacers | 3 | PSW | ||||||||||||||||||
| 126 | 33 05 23 1.1.3 Casing End Seals | 3 | PSW | ||||||||||||||||||
| 127 | 33 30 00 1.2.A Sewer Pipe Catalog Cuts | 3 | PSW | ||||||||||||||||||
| 128 | 33 30 00 1.2.B Sewer Service Fitting Catalog Cuts | 3 | PSW | ||||||||||||||||||
| 129 | 33 30 00 1.2.C Sewer Service Video Inspection Copy | 3 | ATT | ||||||||||||||||||
| 130 | 33 32 00 1.2 Equipment Shop Drawings (Installation & User Instructions, Evidence of Established Service Program, Sales Representative & Technicians, Installation List, Pump Unit, Tank, Discharge Assembly Disconnect Valve, Electrical Quick Disconnect, Check Valve, Anti Siphon Valve, Control Panel) | 3 | ANP | ||||||||||||||||||
| D - Days | PSW - Prior to Start Work | PFI - Prior to Final Inspection | |||||||||||||||||||
| AFI - After Final Inspection | BBCW - Before Beginning Concrete Work | PPC - Prior to Project Completion | |||||||||||||||||||
| ANP - After Notice to Proceed | BD - Before Delivery | PT - Prior to Testing | |||||||||||||||||||
| ATT - After Test is Taken | PBC - Prior to Beginning Construction | PTW - Prior to Event | |||||||||||||||||||
| PRI - Prior to Final Inspection | SRO - After Each Occurrence |
&L&"Times New Roman,Regular"&12Attachment 2&R&"Times New Roman,Regular"&12FA 4626-XX-X-XXX
File details come from the government source that posted it. Updated .