- Maintain Transformer #1 Bldg 81190 Federal contract opportunity
- Solicitation number
- FA4626-16-R-0015
About this file
Attach 2 Material Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Docs.pdf | ||
| Amendment_001.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Attach_6_Base_Entry.pdf | ||
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_5_Wage_Determination.docx | DOCX document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attch_9_-_Subcontractor_Consent_Form_-_10R0027.doc | DOC document | |
| Attach_3_Schedule_of_Drawings.pdf | ||
| Attach_4_Drawings.zip | ZIP file | |
| Attach_1_Specifications.zip | ZIP file |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 Submittal Schedule
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-16-R-0015
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
W A
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N
D
T
B Y
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N T
R A
C T
IN
G
D A
T E
T O
M
IS
S
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
L
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.5; As Built
Field Data 2 3d PTFI
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.7; O & M
Manuals
4 PTFA
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.8.1;
Contractor Furnished Equipment List
10d
PTFI
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.8.2;
Contractor Guarantees
10d
PTFI
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.11; Start of
Work Notification
5d
PTSW
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.12; Notice of
Final Inspection
14d
PTFI
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.13;
Construction Near Utility Systems
3d
PTSW
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.14; Utility
Outages
14d
PTSW
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.18.5; Quality
Control Plan
15d
APA
Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.19; Form
1354 Checklist (Property Inventory Checklist)
10d
PTFI
Section 01 00 00 - GENERAL REQUIREMENTS, 3.21; Par. Nuclear
Densometers
30d PT use
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 2.2;
Copy of Enviromental Permits
15d
ACA
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 4.3.1.B;
Storm Water Discharge Permit and Pollution Prevention Plan
15d
ACA
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 7.1.2;
Hazardous Material Form
15d
ACA
Number of Copies Required
NZAS 16-0020 Maintain Transformers at Substation
AF Form 66
02:
Submittal Schedule-9/25/2015
SS-1
REQUIRED TECHNICAL SUBMITTALS
Page 2 Submittal Schedule
FA4626-16-R-0015
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
M
IS
S
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Number of Copies Required
NZAS 16-0020 Maintain Transformers at Substation
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 7.1.2;
EPCRA List of Extremely Hazardous Materials
15d
ACA
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 11.5;
Solid Waste Disposal and Diversion Documentation 1 3d SRO
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 12.4;
Recovered Materials Written Determination Form
10d
PTCW
Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 12.5;
Recycled Material Use Report
10d
PTCW
Section 01 73 10 - SELECTIVE DEMOLITION, Par. 1.5.A. Schedule of Selective Demolition Activities.
10d
PTSW
Section 03 30 00- CAST-IN-PLACE CONCRETE, Par. 1.3.B.
Product Data
15d
ANTP
Section 03 30 00 - CAST-IN-PLACE CONCRETE - 1.3.C. Shop
Drawings
15d
ANTP
Section 03 30 00 - CAST-IN-PLACE CONCRETE, Par. 1.3.D.
Laboratory test reports for concrete materials and mix design test 3 5d ATT
Section 03 30 00 - - CAST-IN-PLACE CONCRETE, Par. 1.3.E.
Material Certificates 3 5d ATT
Section 03 30 00 - CAST-IN-PLACE CONCRETE, Par. 3.14.C.
Testing 3 5d ATT
Section 03 30 00 - CAST-IN-PLACE CONCRETE, Par. 3.14.C.
Additional Testing 3 5d ATT
Section 26 00 00 - GENERAL PROVISIONS FOR ELECTRICAL
WORK, Par. 1.20 (As-Built Drawings) 3 45d AFI
Section 26 00 00 - GENERAL PROVISIONS FOR ELECTRICAL
WORK, Par. 2.3 (Brochure of Equipment) 3 45d AFI
AF Form 66
02:
Submittal Schedule-9/25/2015
SS-2
Page 3 Submittal Schedule
FA4626-16-R-0015
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
M
IS
S
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Number of Copies Required
NZAS 16-0020 Maintain Transformers at Substation
29 Section 260600 - GROUNDING. Par. 1.3.A. Manufacturer Literature 3 15d
ANTP
30 Section 260600 - GROUNDING. Par. 3.3.A. Test Report 3 5d
SRO
Section 261200 - CONDUCTORS UNDER 600V. Par. 1.3.A.
Manufacturer Literature
15d
ANTP
Section 261200 - CONDUCTORS UNDER 600V. Par. 1.3.B.
Resistance Test Report
5d
SRO
33 Section 261240 - CONDUCTORS OVER 600V. Par. 1.3.A. 3 15d
ANTP
Section 261240 - CONDUCTORS OVER 600V. Par. 3.1.D. Test
Results
5d
SRO
Section 262710 - SUBSTATION TRANSFORMERS. Par. 1.7 Action
Submittals 3 3
15d
ANTP
Section 262710 - SUBSTATION TRANSFORMERS. PAR. 1.8
Informational Submittals 3 3 3
15d
ANTP
Section 262710 - SUBSTATION TRANSFORMERS. PAR. 1.9
Closeout Submittals 3 3 3 3 3
15d
PTFP
Section 262710 - SUBSTATION TRANSFORMERS. Par. 3.4.D Test
Reports 3 3
7d
SRO
Section 26 27 14 - PRIMARY METERING CABINET, Par. 1.5.A
Product Data
15d
ANTP
Schedule of Abbreviations:
AWC = After Work Completed BMF = Before Material Delivery PTNT = Prior to Notice to Proceed PTFP = Prior to Final Payment
PTSW = Prior to Starting Work SN = Advance Notification ANTP = After Notice to Proceed PTCW = Prior to Completing Work
AFA = After Final Acceptance SRO = After Each Occurrence EWD = Each work day AF Form 3000 not required AFI = After Final Inspection
AF Form 66
02:
Submittal Schedule-9/25/2015
SS-3
Page 4 Submittal Schedule
FA4626-16-R-0015
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
M
IS
S
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Number of Copies Required
NZAS 16-0020 Maintain Transformers at Substation
PTO = Prior to Outage PTFI = Prior to Final Inspection PTFA = Prior to Final Acceptance PT = Prior To
ACA = After Contract Award PSS = Per Submittal Schedule
AF Form 66
02:
Submittal Schedule-9/25/2015
SS-4