Attach_2_Material_Submittal.pdf

PDF 113 KB Posted

Attached to
Maintain Transformer #1 Bldg 81190 Federal contract opportunity
Solicitation number
FA4626-16-R-0015
Issued by
Department of the Air Force Global Strike Command

About this file

Attach 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Transformer #1 Bldg 81190, newest first.
File Type Posted
Site_Visit_Docs.pdf PDF
Amendment_001.doc DOC document
Solicitation.doc DOC document
Attach_6_Base_Entry.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attach_5_Wage_Determination.docx DOCX document
Attach_7_Special_Contract_Requirements.docx DOCX document
Attch_9_-_Subcontractor_Consent_Form_-_10R0027.doc DOC document
Attach_3_Schedule_of_Drawings.pdf PDF
Attach_4_Drawings.zip ZIP file
Attach_1_Specifications.zip ZIP file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 Submittal Schedule

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0015

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

S T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D

T

B Y

N T

R A

C T

O R

D A

T E

R E

C E

IV

E

D I

N T

R A

C T

IN

G

D A

T E

T O

M

IS

S

IL

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S U

B M

IT

T

L

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.5; As Built

Field Data 2 3d PTFI

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.7; O & M

Manuals

4 PTFA

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.8.1;

Contractor Furnished Equipment List

10d

PTFI

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.8.2;

Contractor Guarantees

10d

PTFI

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.11; Start of

Work Notification

5d

PTSW

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.12; Notice of

Final Inspection

14d

PTFI

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.13;

Construction Near Utility Systems

3d

PTSW

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.14; Utility

Outages

14d

PTSW

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.18.5; Quality

Control Plan

15d

APA

Section 01 00 00 - GENERAL REQUIREMENTS, Par. 3.19; Form

1354 Checklist (Property Inventory Checklist)

10d

PTFI

Section 01 00 00 - GENERAL REQUIREMENTS, 3.21; Par. Nuclear

Densometers

30d PT use

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 2.2;

Copy of Enviromental Permits

15d

ACA

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 4.3.1.B;

Storm Water Discharge Permit and Pollution Prevention Plan

15d

ACA

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 7.1.2;

Hazardous Material Form

15d

ACA

Number of Copies Required

NZAS 16-0020 Maintain Transformers at Substation

AF Form 66

02:

Submittal Schedule-9/25/2015

SS-1

REQUIRED TECHNICAL SUBMITTALS

Page 2 Submittal Schedule

FA4626-16-R-0015

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

N T

R A

C T

O R

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

M

IS

S

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S U

B M

IT

T

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Number of Copies Required

NZAS 16-0020 Maintain Transformers at Substation

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 7.1.2;

EPCRA List of Extremely Hazardous Materials

15d

ACA

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 11.5;

Solid Waste Disposal and Diversion Documentation 1 3d SRO

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 12.4;

Recovered Materials Written Determination Form

10d

PTCW

Section 01 36 00 - ENVIRONMENTAL PROCEDURES, Par. 12.5;

Recycled Material Use Report

10d

PTCW

Section 01 73 10 - SELECTIVE DEMOLITION, Par. 1.5.A. Schedule of Selective Demolition Activities.

10d

PTSW

Section 03 30 00- CAST-IN-PLACE CONCRETE, Par. 1.3.B.

Product Data

15d

ANTP

Section 03 30 00 - CAST-IN-PLACE CONCRETE - 1.3.C. Shop

Drawings

15d

ANTP

Section 03 30 00 - CAST-IN-PLACE CONCRETE, Par. 1.3.D.

Laboratory test reports for concrete materials and mix design test 3 5d ATT

Section 03 30 00 - - CAST-IN-PLACE CONCRETE, Par. 1.3.E.

Material Certificates 3 5d ATT

Section 03 30 00 - CAST-IN-PLACE CONCRETE, Par. 3.14.C.

Testing 3 5d ATT

Section 03 30 00 - CAST-IN-PLACE CONCRETE, Par. 3.14.C.

Additional Testing 3 5d ATT

Section 26 00 00 - GENERAL PROVISIONS FOR ELECTRICAL

WORK, Par. 1.20 (As-Built Drawings) 3 45d AFI

Section 26 00 00 - GENERAL PROVISIONS FOR ELECTRICAL

WORK, Par. 2.3 (Brochure of Equipment) 3 45d AFI

AF Form 66

02:

Submittal Schedule-9/25/2015

SS-2

Page 3 Submittal Schedule

FA4626-16-R-0015

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

N T

R A

C T

O R

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

M

IS

S

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S U

B M

IT

T

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Number of Copies Required

NZAS 16-0020 Maintain Transformers at Substation

29 Section 260600 - GROUNDING. Par. 1.3.A. Manufacturer Literature 3 15d

ANTP

30 Section 260600 - GROUNDING. Par. 3.3.A. Test Report 3 5d

SRO

Section 261200 - CONDUCTORS UNDER 600V. Par. 1.3.A.

Manufacturer Literature

15d

ANTP

Section 261200 - CONDUCTORS UNDER 600V. Par. 1.3.B.

Resistance Test Report

5d

SRO

33 Section 261240 - CONDUCTORS OVER 600V. Par. 1.3.A. 3 15d

ANTP

Section 261240 - CONDUCTORS OVER 600V. Par. 3.1.D. Test

Results

5d

SRO

Section 262710 - SUBSTATION TRANSFORMERS. Par. 1.7 Action

Submittals 3 3

15d

ANTP

Section 262710 - SUBSTATION TRANSFORMERS. PAR. 1.8

Informational Submittals 3 3 3

15d

ANTP

Section 262710 - SUBSTATION TRANSFORMERS. PAR. 1.9

Closeout Submittals 3 3 3 3 3

15d

PTFP

Section 262710 - SUBSTATION TRANSFORMERS. Par. 3.4.D Test

Reports 3 3

7d

SRO

Section 26 27 14 - PRIMARY METERING CABINET, Par. 1.5.A

Product Data

15d

ANTP

Schedule of Abbreviations:

AWC = After Work Completed BMF = Before Material Delivery PTNT = Prior to Notice to Proceed PTFP = Prior to Final Payment

PTSW = Prior to Starting Work SN = Advance Notification ANTP = After Notice to Proceed PTCW = Prior to Completing Work

AFA = After Final Acceptance SRO = After Each Occurrence EWD = Each work day AF Form 3000 not required AFI = After Final Inspection

AF Form 66

02:

Submittal Schedule-9/25/2015

SS-3

Page 4 Submittal Schedule

FA4626-16-R-0015

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

T

R U

C T

IO

N

S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

S

N T

R A

C T

O R

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

D A

T E

T O

M

IS

S

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S U

B M

IT

T

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Number of Copies Required

NZAS 16-0020 Maintain Transformers at Substation

PTO = Prior to Outage PTFI = Prior to Final Inspection PTFA = Prior to Final Acceptance PT = Prior To

ACA = After Contract Award PSS = Per Submittal Schedule

AF Form 66

02:

Submittal Schedule-9/25/2015

SS-4

File details come from the government source that posted it. Updated .